Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG160167_MONITORING INFO_20190801
MRv STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. 1 y L G I�li I U 7 DOC TYPE ❑ HISTORICAL FILE E� MONITORING REPORTS DOC DATE ❑ " ) YYYYM M D D emi-annual-Stormwater Discharge Monitoring Report 11DMR) T for North Carolina DEMLR General P rmi No. NCG160000 -Asphalt y Date submitted 7 oZG 2e�9 CERTIFICATE OF COVERAGE NO. NCG16Q L �o FACILITY NAME ezk;e" f, COUNTY Ce'e/?!L4v PERSON COLLECTING SAMPLES LABORATORY Lab Cert. # q = Comments on sample collection or analysis: JEFd 1. . _)WR c� r Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR SAMPLE PERIOD © Jan -June ❑ July -Dec J or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ® No discharge this period?' Outfall No. Date Sample 24-hour rainfall Collected' amount, (mo/dd/yr) Inches' Total Suspended Solids Benchmarks 100 mg/L or So mg/L RECEIVED AUG 01 2019 ENTRAL FILES WR SECTION ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. s For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requiremint. "See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format "<XX me/L" where XX is the numerical value of the. detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 RECEIVED AUG 01 2019 ENTRAL FILES WR SECTION ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. s For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requiremint. "See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format "<XX me/L" where XX is the numerical value of the. detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall No. Date Sample r Collected (mo/dd/yr) 24-hour rainfall amount, Inches' Non -polar O&G by EPA 1664(SGT-HEM) Total Suspended Solids Benchmarks ===> _ - 15 mg/L 100 mg/L or 50 mg/1. Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Date) Permit Date:10/l/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2