HomeMy WebLinkAboutNCG160109_MONITORING INFO_20200110STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
DOC TYPE
❑ HISTORICAL FILE
Ek MONITORING REPORTS
DOC DATE
❑
YYYYMMDD
STORMWATER DISCHARGE OUTFALL (SDO)
ANNUAL SUMMARY DATA MONITORING REPORT (DMR) / SPPP Annual Update DATA REVIEW FORM
Calendar Year 2019
Individual NPDES Permit No.
Certificate of Coverage (COC) No. N
or
This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP.
Facility Name:
County: Wake
Phone Number:
Outfall No. 001
Fred Smith Company - Westgate Asphalt Plant
919 )783-5700
Total no. of SDOs monitored 4
Is this outfall currently in Tier 2 (monitored monthly)?
Was this outfall ever in Tier 2 (monitored monthly) during the past year?
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities?
Yes ❑ No ❑■
Yes ❑ No ❑■
Yes ❑ No ❑■
RECEIVE®
JAN 10 2020
rFNTRAL FILES
Parameter, (units)
Total
Rainfall,
inches
TSS, (mg/L)
Benchmark
N/A
100
Date Sample
Collected,
mm/ddlyy
■-_---�-�
01/04/2019
0.72
72
09/05/2019
2.27
27
SWU-264 - Generic Annual DMR
Last revised 61012018
Additional Outfall Attachment
Outfall No. 001
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No*
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No*
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑■
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
SWU-264 - Generic Annual DMR
Last revised 6/01/2018
" I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines amend imprisonment for knowing violations."
Signature
Date
For questions, contact your local Regional Office:
DEMLR Regional Office Contact Information:
2090 US Highway 70
Swannanoa, NC 28778
(828) 296-4500
3800 Barrett Drive
Raleigh, NC 27609
(919)791-4200
450 Hanes Mill Rd, Suite 300
Winston-Salem. NC 27105
(336) 776-9800
225 Green Street
Systel Building Suite 714
Fayetteville, NC 28301-5043
(910) 433-3300
943 Washington Square Mall
Washington, NC 27889
(252) 946-6481
1617 Mail Service Center
Raleigh, NC 27699-1617
(919)807-6300
610 Fast Center Avenue/Suite 301
Mooresville, NC 28115
(704)663-1699
127 Cardinal Drive Extension
Wilmington, NC 28405-2845
(910)796-7215
SWU-264 - Generic Annual DMR
Last revised 61012018
STORMWATER DISCHARGE OUTFALL (SDO)
ANNUAL SUMMARY DATA MONITORING REPORT (DMR) / SPPP Annual Update DATA REVIEW FORM
Calendar Year 2019
Individual NPDES Permit No. NCS❑❑❑❑❑❑ or
Certificate of Coverage (COC) No. NCG❑❑6 ❑❑i ❑❑
This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP.
Facility Name: Fred Smith Company - Westgate Asphalt Plant
County: Wake
Phone Number: (919 ) 783-5700 Total no. of SDOs monitored 4
Outfall No. 002
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑■
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No ❑■
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑■
Parameter, (units)
Total
Rainfall,
inches
TSS, (mg/L)
Benchmark
N/A
100
Date Sample
Collected,
mm/dd/yy
■®__--®-�
120
01/04/2019
0.72
07/23/2019
1.8
29
09/05/2019
2.27
8.1
SWU-264 - Generic Annual DMR
Last revised 6/01/2018
Additional Outfall Attachment
Outfall No. 002
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑■
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No ❑■
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No 0
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
SWU-264 - Generic Annual DMR
Last revised 6/01/2018
" I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines an_n_ prisonment for knowing violations."
Signature
Date i/
For questions, contact your local Regional Office:
DEMLR Regional Office Contact Information:
ASHEVILLE REGIONAL OFFICE
FAYETTEVILLE REGIONAL OFFICE
MOORESVILLEREGIONAL OFFICE
2090 US Highway 70
225 Green Street
610 Fast Center Avenue/Suite 301
Swannanoa, NC 28778
Systel Building Suite 714
Mooresville, NC 28115
(828) 296-4500
Fayetteville, NC 28301-5043
(704) 663-1699
(910)433-3300
RALEIGH REGIONAL OFFICE
WASHINGTON REGIONAL OFFICE
WILMINGTON REGIONAL OFFICE
3800 Barrett Drive
943 Washington Square Mall
127 Cardinal Drive Extension
Raleigh, NC 27609
Washington; NC 27889
Wilmington, NC 28405-2845
(919) 791-4200
(252) 946-6481
(910) 796-7215
WINSTON-SALEM REGIONAL OFFICE
CENTRAL OFFICE
1617 Mail Service Center
450 Hanes Mill Rd. Suite 300
Winston-Salem. NC 27105
Raleigh, NC 27699-1617
j
(336) 776-9800
(919) 807-6300
SWU-264 - Generic Annual DMR
Last revised 610112018
STORMWATER DISCHARGE OUTFALL (SDO)
ANNUAL SUMMARY DATA MONITORING REPORT (DMR) / SPPP Annual Update DATA REVIEW FORM
Calendar Year 2019
Individual NPDES Permit No. N
Certificate of Coverage (COC) No. N
or
This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP.
Facility Name: Fred Smith Company - Westgate Asphalt Plant
County: Wake
Phone Number: (919 ) 783-5700
Outfall No. 003
Total no. of SDOs monitored 4
Is this outfall currently in Tier 2 (monitored monthly)?
Was this outfall ever in Tier 2 (monitored monthly) during the past year?
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities?
Yes ❑ No ■❑
Yes ❑ No ■❑
Yes ❑ No ❑■
Parameter, (units)
Total
Rainfall,
inches
TSS, (mg/L)
Benchmark
Date Sample
Collected,
mm/ddlyy
N/A
100
01 /04/2019
0.72
41
09/05/2019
2.27
11
SWU-264 - Generic Annual DMR
Last revised 61012018
Additional Outfall Attachment
Outfall No. 003
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑■
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No ❑■
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑■
Parameter
M , (units)
W-Mr,"'T'"M ��--------
❑�������
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
SWU-264 - Generic Annual DMR
Last revised 610112018
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and.imprisonment for knowing violations."
Signature
Date //1 /za
For questions, contact your local Regional Office:
DEMLR Regional Office Contact Information:
ASHEVILLE REGIONAL OFFICE
FAYETTEVILLEREGIONAL OFFICE
MOORESVILLEREGIONALOFFICE�
2090 US Highway 70
225 Green Street
610 East Center Avenue/Suite 301
Swannanoa, NC 28778
Systel Building Suite 714
Mooresville, NC 28115
(828) 296-4500
Fayetteville, NC 28301-5043
(704) 663-1699
(910)433-3300
RALEIGH REGIONAL OFFICE
WASHINGTONRECIONALOFFICE
WILMINGTON RECIONAL OFFICE
3800 Barrett Drive
943 Washington Square Mall
127 Cardinal Drive Extension
Raleigh, NC 27609
Washington, NC 27889
Wilmington, NC 28405-2845
(919) 791-4200
(252) 946-6481
(910) 796-7215
WINSTON-SALEM REGIONAL OFFICE
CENTRAL OFFICE
1617 Mail Service Center
450 I -lanes Mill Rd, Suite 300
Winston-Salem, NC 27105
Raleigh, NC 27699-1617
(336) 776-9800
(919) 807-6300
_ J
SWU-264 - Generic Annual DMR
Last revised 610112018
STORMWATER DISCHARGE OUTFALL (SDO)
ANNUAL SUMMARY DATA MONITORING REPORT (DMR) / SPPP Annual Update DATA REVIEW FORM
Calendar Year 2019
Individual NPDES Permit No. N
Certificate of Coverage (COC) No. N
or
This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP.
Facility Name:
County: Wake
Phone Number:
Fred Smith Company - Westgate Asphalt Plant
919 )783-5700
Total no. of SDOs monitored 4
Outfall No. 004
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑■
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No ❑■
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑■
Parameter, (units)
Total
Rainfall,
inches
TSS, (mg/L)
Benchmark
N/A
100
Date Sample
Collected,
mm/dd/yy
■-__-®-®
01/04/2019
0.72
5.1
09/05/2019
2.27
38
SWU-264 - Generic Annual DMR
Last revised 61012018
Additional Outfall Attachment
Outfall No. 004
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑■
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No ❑■
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑■
Parameter, (units)
Total
Rainfall,
inches
Benchmark N/A
Date Sample Elm M M_
Collected,
me Sam y
SWU-264 - Generic Annual DMR
Last revised 610112018
" I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
Sign
Date
For questions, contact your local Regional Office:
DEMLR Regional Office Contact Information:
ASHEVILLE REGIONAL OFFICE
FAYETTEVILLE REGIONAL OFFICE
MOORESVILLE REGIONAL OFFICE
2090 US Highway 70
225 Green Street
610 East Center Avenue/Suite 101
Swannanoa, NC 28778
Systel Building Suite 714
Mooresville, NC 28115
(828) 296-4500
Fayetteville, NC 28301-5043
(704) 663-1699
(910)433-3300
RALEIGH REGIONAL OFFICE
WASHINGTON REGIONAL OFFICE
WILMINGTON REGIONAL OFFICE
3800 Barrett Drive
943 Washington Square Mall
127 Cardinal Drive Extension
Raleigh, NC 27609
Washington, NC 27889
Wilmington, NC 28405-2845
(919) 791-4200
(252) 946-6481
(910) 796-7215
WINSTON-SALEMREGIONALOFFICE
C ENTRALOFFICE
1617 Mail Service Center
450 Hanes Mill Rd, Suite 300
Winston-Salem, NC 27105
Raleigh, NC 27699-1617
(336) 776-9800
(919) 807-6300
SWU-264 - Generic Annual DMR
Last revised 61012018