HomeMy WebLinkAboutNCG160013_MONITORING INFO_20200110Viz v
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
njC I /3
DOC TYPE
❑ HISTORICAL FILE
( MONITORING REPORTS
DOC DATE
❑ D o I \
YYYYM M DD
Semi-annual Stormwater Discharge Monitoring Report'(DMR)
for North Carolina DEMLR General P M*t No. NCG160000 -Asphalt
Date submitted I ( 2oZ-o
CERTIFICATE OF COVERAGE NO. NCG160013
FACILITY NAME Fred Smith company- Holly Springs Asphalt Plant
COUNTY Wake
PERSON COLLECTING SAMPLES Austin Pole
LABORATORY ENCO Lab Cert. t# C317045
Comments on sample collection or analysis:
None
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR Year 1 Period 1
SAMPLE PERIOD ❑ Jan -June ❑■ July -Dec
or ❑ Monthly' (month)
ReC I V �O CLASS ❑ORW ❑HQW [:]Trout❑PNA
f �/ D ❑Zero -flow ❑Water Supply ❑SA
JAN 10 2020 Mother class C
CENI KAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE-)
DWR SECTION
n No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
P
Benchmarks =__>
-
-
100 mg/L or 50 mg/O
001
No Flow
002
No Flow
003
12/13/2019
1.58
63
'Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a check mark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge
°requirement. See General Permit text, Table 1, identifying the especially sensitive receiving water classifications where the more protective benchmark
applies.
Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -
numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the
detection limit, reporting limit, quantitation limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 08/01/2019-05/31/2024 SWU-252, last revised 09/04/2019
Page 1 of 2
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G by EPA
1664 (SGT-HEM)
Total Suspended Solids
New Motor Oil or Hydraulic
Oil Usage, Annual average
gal/mo
Benchmarks =__>
-
-
15 mg/L
100 /L or 50 mg/L4
_
Footnotes from Part A also apply to this Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES []NOW
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BYTHE PERMIT? YES ❑ NON
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
G zo 20
(Date)
Permit Date: 08/01/2019-05/31/2024
SWU-252, last revised 09/04/2019
Page 2 of 2
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
G I
DOC TYPE
❑ HISTORICAL FILE
(Y-MONITORING REPORTS
DOC DATE
❑ � 0
YYYYMMDD
STORMWATER DISCHARGE OUTFALL (SDO)
ANNUAL SUMMARY DATA MONITORING REPORT (DMR) / SPPP Annual Update DATA REVIEW FORM
Calendar Year 2019
Individual NPDES Permit No. NCS❑❑❑❑❑❑ or
Certificate of Coverage (COC) No. NCG❑0❑c ❑c ❑❑
This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. RECEIVE®
Facility Name: Fred Smith Company - Holly Springs Asphalt Plant
County: Wake
Phone Number: (919 ) 783-5700
Total no. of SDOs monitored 3
Outfall No. 001
Is this outfall currently in Tier 2 (monitored monthly)?
Was this outfall ever in Tier 2 (monitored monthly) during the past year?
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities?
Yes ❑ No ❑■
Yes ❑ No ❑■
Yes ❑ No ❑■
JAN 10 2020
CENT- <gL FtLES
DWR SECTION
Parameter, (units)
Total
Rainfall,
inches
TSS, (mg1Q
Benchmark
N/A
100
Date Sample
Collected,
mm/dd/yy
0.73
®®®
31
01 /04/2019
SWU-264 - Generic Annual DMR
Last revised 610112018
Additional Outfall Attachment
Outfall No. 001
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑■
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No ❑■
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑■
77
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
SWU-264 - Generic Annual DMR
Last revised 610112018
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the poss and imprisonment for knowing violations."
Date
For questions, contact your local Regional Office:
DEMLR Regional Office Contact Information:
ASHEVILLE REGIONAL OFFICE
FAYETTEVILLE REGIONAL OFFICE
MOORESVILLE REGIONAL OFFICE
2090 US Highway 70
225 Green Street
610 Fast Center Avenue/Suite 301
Swannanoa, NC 28778
Systel Building Suite 714
Mooresville. NC 28115
(828) 296-4500
Fayetteville, NC 28301-5043
(704) 663-1699
(910)433-3300
RALEIGH REGIONAL OFFICE
WASHINGTON REGIONAL OFFICE
WILMINGTON REGIONAL OFFICE
3800 Barrett Drive
943 Washington Square Mall
127 Cardinal Drive Extension
Raleigh. NC 27609
Washington, NC 27889
Wilmington, NC 28405-2845
(919) 791-4200
(252) 946-6481
(910) 796-7215
j
WINSTON-SALEM REGIONAL OFFICE
CENTRAL OFFICE
1617 Mail Service Center
450 Hanes Mill Rd, Suite 300
Winston-Salem, NC 27105
Raleigh, NC 27699-1617
(336) 776-9900
(919) 807-6300
SWU-264 - Generic Annual DMR
Last revised 61012018
STORMWATER DISCHARGE OUTFALL (SDO)
ANNUAL SUMMARY DATA MONITORING REPORT (DMR) / SPPP Annual Update DATA REVIEW FORM
Calendar Year 2019
Individual NPDES Permit No. N
Certificate of Coverage (COC) No. N
or
This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP.
Facility Name: Fred Smith Company - Holly Springs Asphalt Plant
County: Wake
Phone Number: (919 ) 783-5700
Outfall No. 002
Total no. of SDOs monitored 3
Is this outfall currently in Tier 2 (monitored monthly)?
Was this outfall ever in Tier 2 (monitored monthly) during the past year?
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities?
Yes ❑ No X
Yes ❑ No ❑■
Yes ❑ No ❑■
Parameter, (units)
Total
Rainfall,
inches
Benchmark
N/A
Date Sample
Collected,NJ
mm/dd/yy
No Flow
SWU-264 - Generic Annual DMR
Last revised 6/01/2018
Additional Outfall Attachment
Outfall No. 002
Is this outfall currently in Tier 2 (monitored monthly)?
Was this outfall ever in Tier 2 (monitored monthly) during the past year?
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities?
Yes ❑ No ❑■
Yes ❑ No ❑■
Yes ❑ No ❑e
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
SWU-264 - Generic Annual DMR
Last revised 6/01/2018
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
Signature
Date / /
For questions, contact your local Regional Office:
DEMLR Regional Office Contact Information:
ASHEVILLE REGIONAL OFFICE
FAYETTEVILLE REGIONAL OFFICE
MOORESVILLE REGIONAL OFFICE
2090 US Highway 70
225 Green Street
610 Gast Center Avenue/Suite 301
Swannanoa, NC 28778
Systel Building Suite 714
Mooresville, NC 28115
(828) 296-4500
Fayetteville, NC 28301-5043
(704) 663-1699
(910) 433-3300
RALEIGH REGIONAL OFFICE
WASHINGTON REGIONAL OFFICE
WILMINGTON REGIONAL OFFICE
3800 Barrett Drive
943 Washington Square Mall
127 Cardinal Drive Extension
Raleigh, NC 27609
Washington, NC 27889
Wilmington, NC 28405-2845
(919) 791-4200
(252) 946-6481
(910) 796-7215
WINSTON-SALEM REGIONAL OFFICE
CENTRAL OFFICE
1617 Mail Service Center
450 Hanes Mill Rd, Suite 300
Winston-Salem, NC 27105
Raleigh, NC 27699-1617
(336) 776-9800
(919) 807-6300
SWU-264 - Generic Annual DMR
Last revised 61012018
STORMWATER DISCHARGE OUTFALL (SDO)
ANNUAL SUMMARY DATA MONITORING REPORT (DMR) / SPPP Annual Update DATA REVIEW FORM
Calendar Year 2019
Individual NPDES Permit No.
Certificate of Coverage (COC) No.
or
This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP.
Facility Name:
County: Wake
Phone Number:
Fred Smith Company - Holly Springs Asphalt Plant
919 )783-5700
Total no. of SDOs monitored 3
Outfall No. 003
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑■
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑■ No ❑
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ❑✓
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑■
Parameter, (units)
Total
Rainfall,
inches
TSS, (mg/L)
Benchmark
N/A
100
Date Sample
Collected,
mmlddlyy
■--_-�--
01/04/2019
0.73
92
02/21/2019
0.38
3.0
12/31/2019
1.58
63
SWU-264 - Generic Annual DMR
Last revised 61012018
Additional Outfall Attachment
Outfall No. 003
Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑■
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑■ No ❑
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued?
Enough consecutive samples below benchmarks to decrease frequency ✓❑
Received approval from DWQ to reduce monitoring frequency ❑
Other ❑
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑■
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
----------
SWU-264 - Generic Annual DMR
Last revised 610112018
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
Signature
Date / ,
For questions, contact your local Regional Office:
DEMLR Regional Office Contact Information:
ASHEVILLE REGIONAL OFFICE
FAYETTEVILLE REGIONAL OFFICE
MOORESVILLE REGIONAL OFFICE
2090 US Highway 70
225 Green Street
610 East Center Avenue/Suite 301
Swannanoa, NC 28778
Systel Building Suite 714
Mooresville, NC 28115
(828) 296-4500
Fayetteville, NC 28301-5043
(704) 663-1699
(910)433-3300
RALEIGH REGIONAL OFFICE
WASHINGTON REGIONAL OFFICE
WILMINGTON REGIONAL OFFICE
3800 Barrett Drive
943 Washington Square Mall
127 Cardinal Drive Extension
Raleigh, NC 27609
Washington, NC 27889
Wilmington, NC 28405-2845
(919)791-4200
(252)946-6481
(910)796-7215
WINSTON-SALEM REGIONAL OFFICE
CENTRAL OFFICE
1617 Mail Service Center
450 Hanes Mill Rd, Suite 300
Winston-Salem, NC 27105
Raleigh, NC 27699-1617
(336) 776-9800
(919) 807-6300
SWU-264 - Generic Annual DMR
Last revised 61012018