Loading...
HomeMy WebLinkAboutNCG140385_MONITORING INFO_20190924"B" STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. jC G /L'�O �J DOC TYPE ❑ HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ a u q c� Y YYYYMMDD PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF ERAGE NI NCG14 3 S b FACILITY NAME: PERSON COLLECTING SAM hh CERTIFIED LABORATORY: N ht Lab # 1/ t 1 Lab tt _ 4J LIMIT VIOLATIONS? YES ❑ NO ❑ Orr 4 2��9 CEN I RAL F! Part A: Wastewater Monitoring Requirements �WR LES SAMPLE COLLECTION YEAR: a o i 9 SAMPLE RTER: Jul- ept ❑Oct -Dec ❑Jan -March ❑April -June COUN PHONE NO. ( t/-a03 ADDTOLISTSERVE? ❑YES ❑NO EMAIL: DISCHARGING TO CLASS: ❑SA E�46 ❑PNA ❑Trout OtherC OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr).' Type of Wastewater -(VE,RM,.MD). I nd .(standard).. Total Suspended Solids (mg/L) Settleable Solids (m4/L) .. TPH using method 1664A SGT-HEM° 1mg/L .. Discharge . Duiation (minutes) Total Flow . (gallons/day)' 6-99A 303,s 53. (15)° If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. ' Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 31f an effluent limit is exceeded twice in a row, the permittee is required to Institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. "pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. S TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 s Process wastewater discharges shall only be monitored for TPH when commingled with storm water discharges from VMA areas. TPH does not have a Ilmit for wastewater, but Instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow Ilmits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q30 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtaln a Summer 7Q10 flow and report this Information to DWQ. If the permittee cannot obtain a Summer 7Q30 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Offlce may require an annual flow report on a case -by -case basis. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 2 (919) 807-6379 YOU MUST SIGN THM CERTIFICATION FOR ANY INFORMATION REPORTED, °I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false Information, including the possibility of fines and Imprisonment for knowing of Permlttee) Permit Dater7/1/2010-06/30/2015- (Date) Last Revised 07/13/11 Page 2 of 2