HomeMy WebLinkAboutNCG140119_MONITORING INFO_20190808✓AJ
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
DOC TYPE
❑ HISTORICAL FILE
MONITORING REPORTS
DOC DATE
000
YYYYM M DD
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
2 QTR
CERTIFICATE OF COVERAGE NO. NCG14 0 112 RV-- It+r—,�r SAMPLE COLLECTION YEAR: 2019
FACILITY NAME: Chandler Concrete Piedmont - SALISBURY'Plt#-114 SAMPLE QUARTER: []Jan -March ®April -June ❑Jul -Sept ❑Oct -Dec
PERSON COLLECTING SAMPLES: Matt Daniel AUG 0 8 2019 COUNTY: ROWAN
CERTIFIED LABORATORY:Pace Analytical Lab #633 PHONE NO. (336) 226-1181
CENTRAL FILES ADD TO LISTSERVE? ❑YES ®NO EMAIL:
LIMIT VIOLATIONS? YES ❑ NO ® OVJR SECTION DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-V B
OPTIONAL INFO:
0 Orig — State
0 Copy — State
0 Copy — Plant
0 Copy - File
Part A: Wastewater Monitoring Requirements
Non -Polar
Date Sample
Type of Wastewater
pH
Total Suspended
Settleable
Oil&Grease
Discharge
Total Flow
Outfall No.
Collected t
(VE, RM, MD)'
(standard)
)
Solids
Solids
using method
Duration
(gallons/day)
(mm/dd/yr)
(mg/L)
(mL/L)
1664SGT-HEM6
(minutes)
(mg/L)
-
-
-
6_934
303,5
53
(is),
-
-
,1
NO FLOW
VE RM MD
-
-
N A
N/A
-
N A
3
NO FLOW
VE RM
-
N/A
N/A
-
N/A
4
NO FLOW
RM
N/A
_
N/A
NOD - No Qualifying Discharge this period -
' If wastewater systems have not discharged in this quarter— report "No Flow` or "No Discharge' here. Please make sure to mark the sample quarter above.
' Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more
than one type if the waste -stream is commingled.
'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to
continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
6 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to
benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50%of the Summer 7Q10 Flow as per 15A NCAC 02B.0224. Permittees
who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the
discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis.
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW" "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END
OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penaltieslpr submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
XC
(Date)
Permit Date:8/1/2017-06/30/2022 Last Revised 07/27/17
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
2 QTR
0 / Orig — State
Qf Copy — State
0 Copy — Plant
0 Copy - File
CERTIFICATE OF COVERAGE NO. NCG14 0 1 1 9 SAMPLE COLLECTION YEAR: 2019
FACILITY NAME: Chandler Concrete Piedmont - SALISBURY Pit# 114 SAMPLE QUARTER: Jan -March ®April -June QJul-Sept ❑Oct -Dec
PERSON COLLECTING SAMPLES: Matt Daniel COUNTY: ROWAN
CERTIFIED LABORATORY:Pace Analytical Lab #633 PHONE NO. (336) 226-1181
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
ADD TO LISTSERVE? YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HOW ❑PNA ❑Trout ®Other: WS-V B
OPTIONAL INFO:
Non -Polar
Date Sample
-
Type of Wastewater
pH
Total Suspended
Settleable
Oil &Grease
Discharge
Total Flow
Outfall No.
Collected r
(VE, RM, MD) Z
{standard)
Solids
Solids
usingmethod
Duration
(gallons/day)
(mm/dd/yr)
(mg/L)
(mL/L)
16645GT-HEM'
(minutes)
"
(mg/L)'.
.
6_93,4
,303,' , -
53
(15)'-
1
NO FLOW
VE RM MD
-
�N A
N A' ."
/k
3
NO FLOW
VE RM
-
-
:_.-iN/A
N/A
-
-[`. N/A.
4
NO FLOW
RM
-
''"N/A'`.
-_
_-
N/A..
NQD - No Qualifying Discharge this period -
' If wastewater systems have not discharged in this quarter —report "No Flow` or "No Discharge' here. Please make sure to mark the sample quarter above.
3 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more
than one type if the waste -stream is commingled.
'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to
continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to
benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ,
' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50%of the Summer 7Q10 Flow as per 15A NCAC 028.0224. Permittees
who discharge wastewater to HQW waters shall obtain a Summer 7Q10 Flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the
discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis.
Permit Date:8/1/2017-06/30/2022 Last Revised 07/27/17
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW" "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END
OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties�pr submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
(D te)
Permit Date:B/1/2017-06/30/2022 Last Revised 07/27/17
Page 2 of 2