Loading...
HomeMy WebLinkAboutNCG140108_MONITORING INFO_20170807v��z0 STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v G� ly 1 v DOC TYPE ❑ HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ a YYYYMMDD STORMWATER DISCHARGE. OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 / 0 8 FACILITY NAME: A^ "r PERSON COLLECTING SAMOLES fl _ `iF c&- CERTIFIED LABORATORY OW n / fYk Lab # / i.1 Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: SAMPLING PERIOD: RTuly-December January -June COUNTY PHONE NO. ( a S72- -/ a27 ADD TO LISTSERVE? ❑YES ❑NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA []Trout ❑Other Outfall No. . Date Sample Collected ( mo/dd/yrOR 1 NO FLOW) PH (Standard Units) TSS �mB/':) Event Duration (minutes) - Total Rainfal)• (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' - -- rr9 - y-/o-/ 75 6 I \ - a i ? 3TO 90 CEN RAL FILE$ U SECTION AUG LES DWRSEC Or. ' If "NO FLOW" or "NO DISCHARGE, Enter -"NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. ' If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/1, except when discharging to ORIN, HQW, Trout, and PNA waters where they are 50 mg/L "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit. Date:.7/1/2011-60/30/2015 - - - - Last Revised 7/13/11 Page 1 of 2 Part R- vehicle Maintenance Activitv Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected t (mo/dd/yr) PH (Standard Unks) TPH using method 1"" SGT--HEM (mg/L) Total suspended Solids (mg/L) Event Duration (minutes) Total . Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (Y/n) # of Months in Tier 2 Samplini 6-9 is 1 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO Li HAVE YOU CONTACTED THE REGION? YES Q NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attm DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED., "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware t th are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 17 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2