Loading...
HomeMy WebLinkAboutNCG080589_MONITORING INFO_20190703► Jill STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DOC TYPE ❑ HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ C)o d 3 YYYYMMDD W.p" Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted t'O - Iei - I q CERTIFICATE OF COVERAGE No. NCGO8 O 5 FACILITYNAME WRSTE 2rkdval :rt (MEvJ S6RW) COUNTY CCAJEN PERSON COLLECTING SAMPLES v %rlGc-Fo LABORATORY VMC-O LAb. La Cert. #(t-- r3 33g-O i Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR a 01 of SAMPLE PERIOD EU]-AnAune ❑ July -Dec or ❑ Monthly' fmonth) DISC�H+gB�c,N�G-TO LASS QORW ❑HQW []Trout [2 RECEi l`7-1, []Zero -flow ❑Water Su pP Y ❑SA JUL 0 3 Z019 Zdt�her CENtiT,tr\l­ FILT&ASE REMEMBER TO SIGN ON THE REVERSE 4 OWR SECTION Fit!Tlo discharge this period' " Outfall t;,tyNok+.f ,bSample�Collected, y„ „ srgZ y Date' I Gs ti; mo - '00530' ' 00400 00556 Total Suspended Solids„mg-A-, PH, ;Standard units Non -Polar Oil and Grease/TPH EPA Method 1664;(SGTrHEM), mg/L New Motor Oil Usage, Annual average gal/mo Be`nchmackFrV c „ u i -.50'or.100 see permit- . Withiri+6:0 — 9.0 15 6 - 12 - J 9 �a I a. i �. w i 40 9,. 1 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals - r0utfalh No. Date ,." if.,: sanfple Collected ff} Tmo%dd'/,Yr+;r„to; 00556 00530 00400 Nori-Polar,OiliandtGie' se/TPH'EPA'Method t .�'s26T"HEM),,mg'jttr�.,Stanil"aid`units 64(SG Total Suspended Solids, pH, "Perfnifiiinit - - = "' •' ); ;'; is ': ,- -15' 50'ror.100 see;'peritiit 6.0 — 9.0 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. S WU-250 last revised October 25. 2012 STORM EVENT CHARACTERISTICS: Date 6'f?^l9 (first event sampled) O s It Total Event Precipitation (inches): Date (list each additional event sampled this reporting period, and rainfall amount) @ total Event Precipitation (inches): !' • 1 ,, Note: Ilf lJOu report a sample value In excess of the benchmarl(, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION e. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO M IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this OMR including all "No Discharge" reports within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Flies ' 1617 Mail Service Center � Raleigh, North Carolina 27699-1617 'YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "9 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permittee) 6 - i1-/ g (Date) Additional copies of this form may be downloaded at: hip //portal ncdenr orglweb/wg ws/su/nodessw#tab-4 SWU-250 last revised October 25, 2012 Paste 2 of 2