Loading...
HomeMy WebLinkAboutNCG030373_MONITORING INFO_20200122STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /jC G o 3 D3-73 DOC TYPE ❑ HISTORICAL FILE ❑MONITORING REPORTS DOC DATE ❑ b� O a YYYYM M D D Dear Madam/Sir, Please Use these documents, Stormwater Discharge Monitoring Report, & Stormwater Discharge Outfall Qualitative Monitoring Report, to Replace Same Reports Submitted 1-15-2020. The Previous Reports did not have the Sample collection Year, Sample period, Discharging to class Marked. Thanks, Wayne Naylor 01/16/2020 RPrE{WED JAN 2 2 2020 CEN i ml- FILES DWR SECTION Environmental Qualify Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling aul this form, please vis n PerrnitNo.: N/C/,G/00l0/0/D/C)/ or Facility Name: County: Sa wt c, / Inspector: Date of Inspection: Time of Inspection: / I Total Event Precipitation (inches): l e I ,ater-gps of Coverage No.: N/C/G/,0�3./.0/3/ l /,' Phone No. 6 z r— -J �C-? - 11 a All permits require qualitative monitoring to lic performed during a "measurable storm event." A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event! must have heed at least 72 hours prior. 'The 72-hour storm interval does not apply if the permittee is ableI to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of/Permittee or 1. Outfall Description: Outfall No. .1 Structure Receiving Stream: �OW r ef Describe the i ustrial act�vibes rat oe( r--. , t1 - // , . _ - ditch, etc.): G r' 14 _`j,n LRDJ FI,- Lj�' 4 y w �'L s, C s � G � aI v' �Y ��sii-• hin the outfall drainage areaST 4 fl Page I of 2 S W U-242, Last modified 06/01/2018 2. Color: Describe the color of (light, medium, dark) as descriptors: _ using basic colors (red, brown, blue, etc.) and tint la I � 3. Odor: Describe any distinct odors dial die discharge may have (i.e., chlorine odor, etc.): �J �% C) t �) -e strongly of oil, weak 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: 1 <T 3 4 5 5. Floating Solids: Choose the number! which best describes the amount of floating solids in the stonmwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: I 2! 3 4 5 i 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where I is no solids and 5 is extremely muddy: 1 (1) 3 4 5 7. Is there any foam in the stormwater 8. Is there an oil sheen in the stormwai 9. Is there evidence of erosion or dept to. Other Obvious Indicators of Storr List and describe C L:zk-4t G^ ylieo ;charge? o Yes ® No discharge'? OYes ® No. ion at the outfall'? c Yes ® No titer Pollution: t�ln/y c-C/ I I I I Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further invesfigation. Page 2 of 2 S W U-242, Last modified 06/0I /20J 8 Stormwater Discharge Monitoring Report for North"Carolina Division -of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 1 — ( �o- oZ �O 19 CERTIFICATE OF COVERAGE NO. NCG03D,� - - - - --- - SAMPLE.COLLECTION YEAR o� G FACILITY NAME. G% L, C LG �i t� n7 �C ,Cry =Wl SAMPLE PERIOD.[ JanAune_ � July -Dec, _ COUNTY or. ❑ Monthly! (month) PERSON COLLECTI G SAMPLES J� l4 L D� DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY I i f,i L r n� l!1 c Lati Cert. # I l R El F-!, --® ❑Zero -flow' ❑Water Supply FSA Commetits on sample collection cr analysis: - — _ [Other — - JAN2220' CEIv7itAL F S PLEASE REMEMBER TO SIGN OWPAGES 2 AND/OR 3 4 GWR SECTION Part A: Stormwater Benchmarks and Monitoring Results - __ n No discharge this periodj' ~ Outfall No. ,...rR,.>�> r- .. Date Sample • Collected' (mo/dd/yr) :.,�. _. 24-flour rainfall amount, Inches",,s_;e :r8:•.;,••. .-.-. Total Suspended Solids _ .. a ..:.,., .;.. pH; Standard units ;, c.= .. Total Copper .: •.a •: Total Lead :. --• Total Zinc 4,.- Non-PolarO&G/ Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks 100 mg/L or 50 mg/O 6.0 - 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L PararrieterCode 46529 C0530 00400 01119 01051 01094 00552 78241 / ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outtall. 2 For sampling periods with no discharge at any•single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent.Guidelines for the facility, subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use.the definition as -found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found.in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). - - - Permit Date:11/1/2018-05/31/202s-�...--5 U 24 - -- Page 1 of 3 Facilities that incorporate.a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification. statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report: I further certify that this facility is implementing the all the provisions of the solvent management plan, included in the Stormwater Pollution Prevention Plan.". Name (Print name) Title (Print title) Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format "<XX mg/L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. Outfall No. Date Sample Collecte&l (mo/dd/yr) 24-hour rainfall amount, Inches' New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks c 15 mg/L 100 mg/L or 5o mg/L4 Parameter Code 46529 NCOIL 00552 CO530 Footnotes from Part A also apply to Part B Note: If you report o sample value in excess of the benchmark, you must Implement Tler 1, Tler 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 a' FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS.. SEE PERMIT PART II SECTION B. 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal coov of this DMR, indudlna all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are signific4nt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permit Date: 11/1/2018-05/31/2021 -lb-,;� -E) Date -SWU-245, last revised 11/1/2018_ _ Page 3 of 3 FP-1b STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. jC V OSD3 % 3 DOC TYPE ❑ HISTORICAL FILE C MONITORING REPORTS DOC DATE ❑ YYYYMMDD for North Carolina Stormwater= Discharge -Monitoring Report - Division of Energy, Mineral and Land Resources General Date submitted '�=� s a fl CERTIFICATE OF COVERAGE NO. NCG03-0 FACILITY NAME .0 K i Lb4 r p COUNTY rv1� c v*+ PERSON COLLECTIN SAMPLES LABORATORY ML( - t RaCL _ Lab Cert. # Comments on sample collection or analysis: - Part A: Stormiivater Benchmarks and Monitoring'Results Permit No.'NCG030000 SAMPLE COLLECTION YEAR _ SAMPLE PERIOD ❑ Jan -June ❑July -Dec -- or �E�DISCHARGING TO CLASS t❑ORW ❑HQW ❑Trout th❑PNA JAN 2.2 2020 ❑Zero -flow' ❑Water supply ❑SA ❑Other GEN I r<1L FILES DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2-AND/OR 3 4 n No discharge this period?' Outfall No. ... Date Sample Collected' (mo/dd/yr). `24-hour rainfall amount, Inches'•- :. '' Total Suspended Solids _ pH; its Standard uni _ Total Copper Total Lead Total Zinc Non-PolarO&G/ Total Petroleum . Hydrocarbons Total Toxic Organics s Benchmarks 100 mg/L or 50 mg/O 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code': 46529 C0530 - 00400 01119 01051 01094 00552 78141 `i 't. vo•S C G 'ror 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outran. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found.in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). - . L Permit Date:11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a -list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX ma/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. —Note:-If you report a sample value in excess of the benchmark, you must implement Tier 1, rier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected''14-hour (mo/dd/yr) rainfall amount, Inches' New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code 46S29 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original coov of this DMR, includina_all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signi9cant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of -J�5=a D Date Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater For guidance on filling out this form, please visit np PermitNo.: N/C/.G/03/V/D/,Q/D or( Facility Name:;(( County: S Inspector: LQ� Date of Inspection: Time of inspection: Total Event Precipitation (inches): V � Environmental Quality �scharge Outfall (SDO) Monitoring Report of Coverage No.: N/C/G/CO to 0/.73/ Phone No. All permits require qualitative monitoring to lie performed during a "measurable storm event." A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event most have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for I local storm events during the sampling period,'and the permittee obtains approval from the local DEMLR Regional Office. 1 By this signature, I certify that this report is (Signature of Permittee or 1. Outfall Description: Outfall No. �i Structure (p. Receiving Stream: �ot�5a�3 �vw�.t�cGt�G4,kSrt l�4 Describe t e industrial activities that occur i H ;54,;, r7 or QS TN14 and complete to the best of my knowledge: ditch, etc.): 6rp-b4 5� i15 7`G✓ s al hzlIj g6,/ hin the outffallll drainage area: N(' : d �ti Sl Page I of 2 S WU-242, Last nmditied 06/01 /2018 2. Color: Describe the color of the (light, mediwn, dark) as descriptors: using basic colors (red, brown, blue, etc.) and tint ,i/ LroaT 3. Odor: Describe any distinct chlorine odor, etc.): f?/p jZ have (i.e., smells strongly of oil, weak 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number i hich best describes the amount of floating solids in the stormwater discharge, where I is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the numb) r which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids Iand 5 is extremely muddy: 1 %2�,) 3 4 5 7. Is there any foam in the stormwater 8. is there an oil sheen in the stormwa 9. Is there evidence of erosion or dep 10. Other Obvious"" Indicators of Ston List and describe Note: Low clarity, high solids, and/or the indicative of pollutant exposure. These cc charge? O Yes jO No. discharge? 0Ycs allo. ion at the outfall'? o Yes o No. ater Pollution: u 0 I a 0 of foam, oil sheen, or erosion/deposition may be warrant further investigation. Page 2 of 2 S WU-242, Last modified 06/01 /2018