HomeMy WebLinkAboutNCG030296_MONITORING INFO_20161031Mrs
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
lv u&
DOC TYPE
❑ HISTORICAL FILE
E�-MONITORING REPORTS
DOC DATE
❑ C)b i L j o 3 l
YYYYMMDD
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted /0--24 —
CERTIFICATE OF CgYERAGf NO.
FACILITY N,%VIE Y
COUNTY
PERSON COLLECTING SAMPLES.
Comments on sample
L
,�=4 Lab Cert. if
or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR z;ZO/K
SAMPLE PERIOD ❑ Jan -June JX July -Dec
or ❑ Monthly' (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
]Zero -flow aW errply ❑d A
RECE/VED ®Other J%(: (�/!
OCT 31 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FI
�WR SECTIONS
n No discharge this neriod ?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended
pended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/ Total Petroleum
Hydrocarbons
Total Toxic
Organics s
Benchmarks ===>
-
-
100 mg/L or 50 mg/L
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
,O/
< .D
en 7�� •
o
0
0. o
�o L
o �
O.
L
o • oo
qo
7
< .o
0 6
0• 67i.� •
L
6.60
ao4.
14 o.oeu'
o.03i<5o
L
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
"See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
P,
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
'WnQh Cv/uplr n
Name (Print name)
Title Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX me/L". where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. see General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
n No dischoroe this nerind PZ
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar 0&G/TPH by
EPA 1664(SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L'
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
r
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO,n
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one cony of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(
(Signature of
Permit Date: 11/1/2012-10/31/2017
lO-ZC—/6
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
R
`Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
Forguidance on filling out thisform, please visit: btUL//l2Qrtal.ncdenrorgZ3ypbLwA/ws/sii/llpdessw#tah-4
Permit No.: N/-C/(g-Oor Certificate of Coverage No.: i��/�� /D/.�/�/�/
Facility Name:
County. C a Phone No. — — SOD
Inspector: _ _
Date of Inspection: lL} /J % — /� rV { �/ —
Time of Inspection: Ili: /25- .9n2
"cc-r-Tx.8 i6
Total Event Precipitation (inches): �• 6CENTRAL FILES
DWR SECTION
Was this a "Representative Storm Event" or."Measureable Storm Event" as defined by the permit?
(See information below.)
Z Yes ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event" or "measureable storm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a "representative storm event' or during a "measureable storm event" However,
some permits do not have this requirement Please refer to these definitions, if applicable.
A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event" is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the Dermittee
obtains approval from the local DW(
Office.
By this signature, I c y iat thiis accurate and complete to the best of my knowledge:
'l•
(Signature of Permittee or
Pagel of 2
SWU-242, Last modified 10/25/2012
1. Outfall Description:
Outfall No. Structure (pi e, ditch,
Receiving Stream: �/ BG/
Describe the ipdust 'a activities that occur within
drainage
2. Color: Describe the color of the discharge using basic colors (red, bro n, blue, etc.) and tint
(light, medium, darkTas descriptors: erl�� T
3. 'Odor:'bescribe any distinct odors that the
weak chlorine odor, etc.):
have (i.e., smells strongly of oil,
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 6 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes Lp
9. Is there evidence of erosion or deposition at the outfall? Yes
10. Other Obvious Indicators of Stormwater Pollution:
List and describe /r 4F7
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, last modified 10/25/2012
June 15, 2016
NPDES General Permit COC: NCG030296
Central Files
Division of Water Quality
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
ADRIAN GUTIERREZ
ENGINEERING MANAGER -
PARKER HANNIFIN CORPORATION
GEAR PUMP DIVISION
101 CANTERBURY ROAD
KINGS MOUNTAIN, NC 28086
PHONE: 704-730-5707
RECEIVED
JUN 2 0 Z016
CENTRAL FILES
DWR SECTION
Re: NPDES Stormwater Sampling (Year 4, Period 1 Bi-annual results)
Parker Hannifin Corporation
Gear Pump Division
101 Canterbury Road
Kings Mountain, Gaston County, NC 28086
To Whom It May Concern:
Parker Hannifin Corporation located at 101 Canterbury Road, Kings Mountain, North
Carolina is pleased to submit in accordance with NPDES General Permit (COC
NCG030296) the attached stormwater sampling results for Year 4, Period 1. The
stormwater samples were analyzed for the parameters listed in Section B Table 1 (pH,
Total Suspended Solids, Non -Polar Oil & Grease, Copper, Lead and Zinc). Total Toxic
Organic Compounds (TTO) were not analyzed since the facility is not categorized as a
metal finishing operation. Rainfall amounts were pulled and recorded as required.
Based on the sampling results, the analytical results were all below the Benchmark
Values presented in section B, Table 3 of the Stormwater General Permit.
Note: The sample for Non -Polar Oil and Grease from `Outfall 2' was damaged at the lab
prior to the sample being analyzed. We currently have not have a significant event in
which an additional sample could be pulled and analyzed. In order to ensure we provide
the report for Year 4, Period 1 on time we are going ahead and submitting the report with
this piece of data missing.
Please let us know what steps are needed to be taken at this point to ensure we do not
place ourselves in a noncompliance position.
Sincerely
Adrian Gu 2errez
Mfg. Engineering Manager
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water ualit neral P r1]tit No. NCG030000
CERTIFICATE OF COVARAGE NO. NCG030
FACILITY NAME t- -
COUNTY
PERSON COLLE_��jNG SAMPLES
LABORATORY/11C & ZA,
Comments on sample collecti
J`
rt
Date submittel
�y44
—r—�r/ r�� - cz
71]F/`T il1'J �7 S
g( Lab Cert. # y4_
nalysis:T
i rd zv
and onitoringftesults
SAMPLE COLLECTION YEAR
SAMPLE PERIOD ® Jan-Ju July -Dec
or ❑ Monthly' (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
[]Zero -flow []Water Sup, dy []SA
mall! s JUN 2 0 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
/ea�,r�� 2016
WR SEA ION I� Aln icrhnrno F{ ;r JZ
Outfall No.
Date Sample
Collected
(mo/dd/yr)
24-hour rainfall
amount,Or
Inches'
Total Suspended Solids
P H
Standard units
Copper
Lead
Zinc
Non -Polar 0&G/
Total PetroleumTotal
Hydrocarbons
Toxic
g anicss
Benchmarks =__>
_
-
100 mg/L or 50 mg/L°
/
6.0 — 9.0
4 -
0.007 mg/L
<O.00
0.03 mg/L
o.
10.067 mg/L
15 mg/L
D.
1 mg/L
0.ad5
oSaAyn
/
rao
0.06
0.O
10,
L
o.
co.cn5
a/
.l
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligiblefor a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ N0E)
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are signifiican nalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
Permit Date: 11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
1,* be waived. The solvent management.plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan." -
(%�r�Gt vt (n v74w� Z
Name (Print name)
/'1A. F�,-
Title (P t title)
(Signature) ( Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX me/if, where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
n Nn dicrhnrna Chic norin,i J2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L'
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SW U-245, last revised 10/25/2012
Page 2 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 2 3 2016
CERTIFICATE OF COVERAGE NO. NCG030296
FACILITY NAME Parker Hannifin-GPD
COUNTY Gaston
PERSON COLLECTING SAMPLES Robert Simpson
LABORATORY Pace Analytical Lab Cert. # 40
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2015
SAMPLE PERIOD ❑ Jan -June ® July -Dec
or ❑ Monthly' (month)
DISCHARGING TO CLASS ❑ORW ❑HQW [_]Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
®Other McGill Creek
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches;
Total Suspended Solids
pH,
Standard units
Copper
Lead
-
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks ===>
-
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
1
12/17/15
1.25
< 2.5 mg/L
6.4
< 0.005 mg/L
< 0.005 mg/L
0.028 mg/L
< 5.0 mg/L
N/A
2
12/17/15
1.25
< 2.5 mg/L
6.2
< 0.005 mg/L
< 0.005 mg/L
0.018 mg
< 5.0 mg/L
N/A
3
12/17/15
1.25
< 2.5 mg/L
6.5
< 0.005 mg/L
< 0.005 mg/L
0.012 mg/L
< 5.0 mg/L
N/A
4
12/17/15
1.25
3.3 mg/L
6.6
< 0.005 mg/L
< 0.005 mg/L
0.020 mg/L
< 5.0 mg/L
N/A
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwaattlrer Pollution Prevention Plan."
Name (Print name)
`V• v`2 arr � el'�cl l�
Title (Pr nt title)
2/3/2016
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
n No discharge this period?Z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
1
Mail an oriainal and one copy of this DMR. including all "No Discharae" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there ar ignif` naltie submitting false information, including the possibility of fines and imprisonment for knowing violations."
2/3/2016
(Signature of Permittee) (Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
PARKER IIANNIFIN CORPORATION
GEAR PUMP DIVISION HEADQUARTERS
101 CANPERRURY ROAD
KINGS MOUNTAIN NC 28086
PHONE: 704-730-2000
TOLL FREE 888-700-74I1
FAX: 704-730-5832
,Tune 23, 2014
Attn: DWQ Central Files
NCDENR
Division of Water Quality
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Re: Stormwater Discharge Outfall Monitoring Report
To Whom It May Concern:
Attached please find a copy of the Stormwater Discharge Outfall (SDO) Monitoring
Report for the Parker Hannifin — GPD manufacturing facility located in Kings Mountain,
North Carolina.
If you have any questions, please contact me at 704-730-5710.
Sincerely,
ToddHorton
Facility Sr. EHS Specialist
a
aR
g=
z r71
C"
m
_C o =
2
ti
b
ENGINEERING YOUR SUCCESS.
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 612512o14
CERTIFICATE OF COVERAGE No.
//N�0003 O 2 9 &
FACILITY NAME Af19KcR /7fFNV/F/V - GPD
COUNTY &,45To.V //
PERSON COLLECTING SAMPLES moo Y o/7-0,y
LABORATORY ACE 111V,11 KYICAt Lab Cert. it 12� 3"66
Comments on sample collection or analysis:
ND - NoT i-1C-TEC-rED 4T OQ 46O✓6 AUyL,,T A4 QE/L(CTI t% UNIT
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2014
SAMPLE PERIOD Jan -June ❑ July -Dec
or ❑ Monthly' (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
QOther /+7 r 6rC CRetK
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
n No dischoroe this oeriod?Z
Outfall No.
Date Sample
p
Collected ,
(mo/dd/yr)
24-hour rainfall
amount,
Inches;
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks =__>
_
-
100 mg/L or 50 mg/L"
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
l
s i 14
.44
ND
% I
NO
ND
0.010&
ND
2
4
44
9,9 m
• 2-
1 0,00`
I /JD
0.01 0
A/D
—
3
/G 114
44
/U
D
/V
/Vo
&
45)1&114
144
IVD
71 2
ND
ND
010128
/VD
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
a For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
Q See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling inapplicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals; or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TfO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
/pop AR,—otl
Name (Print name)
)�/G77/ EHS SQ, SpeCIALIs7
Title (Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected,
(mo/dd/yr)
24-hour rainfall
amount,
Inches;
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: ll/1/2012-10/31/2017
.r
SWU-245, last revised 10/25/2012
Page 2 of 3
Ncr �4w If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ -
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date:11/1/2012-10/31/2017
6 23 20/
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3