Loading...
HomeMy WebLinkAboutNCG030265_COMPLETE FILE - HISTORICAL_20140602PERMIT NO. STORMWATER DIVISION CODING SHEET NCG PERMITS IVC& o30��5 DOC TYPE [X HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ Ly L) YYYYMMDD Pat McCrory Governor � IA NCDENR North Carolina Department of Environment and Natural Resources June 2, 2014 Dave Steel Company, Inc. ATTN: Mr. Rob Clowers, CSP Environmental Health & Safety Director PO Box 2630 Asheville, North Carolina 28802 John E. Skvarla, III Secretary SUBJECT: NPDES Stormwater Permit: Request for Regulatory Relief Dave Steel Company, Inc. General Permit No: NCG030000; COC No: NCG030265 Buncombe County Dear Mr. Clowers: In response to your request for regulatory relief, NCDENR-Land Quality Section staff conducted a site inspection on May 29, 2014. The primary goal of this inspection was to evaluate compliance with the conditions of the NCG030000 General Permit, and to discuss any actions that have been or could be taken to identify and limit potential sources of zinc related to process operations. At the time of this inspection the facility was found to be in compliance with permit NCG030265 and no illicit discharges were discovered. Monthly monitoring has been triggered by. two consecutive exceedances of the zinc benchmarks in Storm Drain Outfall Nos. 01 and 02 at your facility. Please keep in mind that benchmark exceedances are NOT limit violations or violations of permit conditions; however; you are obligated to follow the tiered response actions outlined in your permit. Dave Steel Company, Inc. (DSCO) has been following the tiered response actions and therefore is in compliance with the permit. As part of tiered response, DSCO has initiated housekeeping actions that appear to have addressed the process exposures (reference April 23, 2014 letter from you). These include cleaning out the storm drains in the Fit -up area (south side of the metal fabrication building) and placing more permanent covers on the drains to prevent potential contamination; recommendations from the May 23, 2013 NCDENR inspection. Awareness training for employees has also been implemented to prevent any illicit discharges into the drains. In addition, DSCO has identified likely non process sources of zinc including galvanized building material, guttering, and the AB Tech parking lot located upstream from the facility. There are potential process sources of zinc, but all Division of Energy, Mineral, and Land Resources — Land Quality Section Asheville Regional Office, 2090 US Highway 70, Swannanoa, North Carolina, 28778-8211 Telephone 828-296-4500 Fax 828-299-7043 _ A http•//portal ncdenr org/web/Ir/land-quality Noe Carolina An Equal Opportunity / Affirmative Action Employer NUtmally Mr. Rob Clowers, CSP June 2, 2014 Page 2 of 2 of these operations are located indoors with limited exposure to stormwater. Note that the April 2014 sampling results for zinc were below the benchmark value in both outfalls. Based on the aforementioned items, we are granting regulatory relief in the form of a collapsed Tier 2 — Tier 3 response. Upon receipt of this letter, DSCO may resume the permit specified semi-annual analytical monitoring for the remainder of the current permit term. Your current permit is set to expire on October 31, 2017. This decision only applies to the zinc benchmarks. A benchmark exceedance of any other parameter listed in your permit will trigger tiered response actions as described in the general permit. You must notify this office in writing, within five business days, if you become aware of any significant source of zinc at your facility that has the potential to be exposed to stormwater. The relief granted in this letter is contingent upon the current industrial practices at DSCO. If industrial practices change and zinc does become a significant stormwater exposure risk then this office reserves the right to withdraw this decision and reinstate the permit specified tiered response or other actions that may be warranted by the new set of circumstances. Please refer to the enclosed Compliance Inspection Report for additional comments, observations, and recommendations made during the inspection. Please retain and append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit. If you have any questions or comments concerning this letter, please contact Darlene Kucken or me at (828) 296-4500. Sincerely, X1�4� Laura Herbert, PE Regional Engineer Enclosure ec: Bethany Georgoulias, RCO Dan Marks, PE, Pisgah Environmental via email. Compliance Inspection Report Permit: NCG030265 Effective: 11/01/12 Expiration: 10/31/17 Owner: Dave Steel Company SOC: Effective: Expiration: Facility: Dave Steel Company County: Buncombe 40 Meadow Rd Region: Asheville , ' Asheville NC 28803 Contact Person: Jeffrey E Dave Title: Phone: 704-252-2771 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/2912014 Entry Time: 10:00 AM Exit Time: 12:00 PM Primary Inspector: Darlene J Kucken Phone: Secondary Inspector(s): Laura C Herbert Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge CDC Facility Status: ■ Compliant D Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 Permit: NCG030265 Owner • Facility: Dave Steel Company Inspection Date: 05/2912014 Inspection Type: Compliance Evaluation Reason for Vielt: Routine Inspection Summary Monthly monitoring was triggered by two conseclutive exceeedances of the zinc benchmark at Outfall 01 & 02. Dave Steel has undertaken housekeeping actions that appear to have addressed the process exposures, including a significant clean out of the storm drain In the Fit -up area and placing permanent covers on the drains to prevent further contamination (these actions were recommended in the 2013 NCDENR inspection). In addition, awareness training has been implemented to prevent any illicit discharges into drains. Dave Steel has Identified likely non -process sources of zinc from the galvanized building, gutters and the AB Tech parking lot runoff. The April 2014 samples for both oulfalls were below the benchmark for zinc. Therefore, regulatory relief is being granted in the form of a collapsed Tier 2-Tier 3 for the zinc benchmark and semi-annual analytical monitoring should be conducted for the remainder of the permit. Additional recommendations: 1. Clean out the two drains as discussed during the inspection and consider providing inlet protection in the form of coir logs for these drains. 2. Consider employing a vacuum sweep of the paint room on a regular basis during use, instead of a manual broom sweeping. Permit: NCG030265 Owner -Facility: Dave Steel Company Inspection Date: 05/29/2014 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan Include a General Location (l1SGS) map? ■ ❑ ❑ ❑ # Does the Plan Include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? e ❑ ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # Does the Plan include a Split Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: The SWPP is well written and additional inspection/implementation forms and policies have been added to enhance the plan. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: _Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? - ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ■ ❑ Comment: Page: 3 4 . NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Dave Steel Company PO Box 2630 Asheville, NC 28802 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Dave Steel Company CDC Number NCG030265 Buncombe County In response to your renewal application for continued coverage under stormwater General Permit NCG030000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow;' as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit FactSheetthat accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http:/http://portal.ncdenr.org/web/wq/ws/su/npdessw/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Ralegh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Ralegh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-6492 Internet: w .ncwate�rcuality .or yg An Equal Opponuniry 1 ARrmative Action Emplor;:r NorthCarol i na ,Nahmally December 4, 2012 Page 2 of 2 Some of the changes include: Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections B, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections B, C: A lower TS5 benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections B, C: The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on -site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions' section of the permit. • Sections B, C: The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, 3nctt�� for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030265 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Dave Steel Company is hereby authorized to discharge stormwater from a facility located at: Dave Steel Company 40 Meadow Rd Asheville Buncombe County to receiving waters designated as Swannanoa River, a class C waterbody in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, Ill, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission W ATF9 P Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources no wwA —1 JEFFREY E DAVE DAVE STEEL COMPANY PO BOX 2630 ASHEVILLE, NC 28802 Dear Permittee: Alan W. Klimek, P.E., Director Division of Water Quality August 23, 2002 Subject: NPDES Stormwater Permit Renewal DAVE STEEL COMPANY COC Number NCG030265 Buncombe County In response to your renewal application for continued coverage under general permit NCG030000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: * A new Certificate of Coverage * A copy of General Stormwater Permit NCG030000 A copy of the Analytical Monitoring Form (DMR) * A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment., or decree. If you have any questions regarding this permit package please contact Bill Mills of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater & General Permits Unit Files Asheville Regional Office ern NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1- 800-623-7748 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030265 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, DAVE STEEL COMPANY is hereby authorized to discharge stormwater from a facility located at DAVE STEEL COMPANY 40 MEADOW RD. . ASHEVILLE BUNCOMBE COUNTY to receiving waters designated as the Swannanoa River, a class C stream, in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective September 1, 2002. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day August 23, 2002. for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality December 27.2001 JEROME DAVE DAVE STEEL COMPANY PO BOX 2630 ASHEVILLE. NC 28802 Subject: NPDES Stormwater Permit Renewal DAVE STEEL COMPANY COC Number NCG030265 Buncombe County Dear Permittee: Your facility is currently covered for stormwater discharge under General Permit NCG030000. This permit expires on August 31, 2002. The Division staff is currently in the process of rewriting this permit and is scheduled to have the permit reissued by late summer of 2002. Once the permit is reissued, your facility would be eligible for continued coverage under the reissued permit. In order to assure your continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit coverage. To make this renewal process easier, we are informing you in advance that your permit will be expiring. Enclosed you will find a General Permit Coverage Renewal Application Form. The application must be completed and returned by March 4, 2002 in order to assure continued coverage under the general permit. Failure to request renewal within this time period may result in a civil assessment of at least $250.00. Larger penalties may be assessed depending on the delinquency of the request. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215. f and could result in assessments of civil penalties of up to $10,000 per day. Please note that recent federal legislation has extended the "no exposure exclusion' to all operators of industrial facilities in any of the I I categories of "storm water discharges associated with industrial activity," (except construction activities). If you feel your facility can certify a condition of "no exposure", i.e. the facilty industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff member listed below or check the Stormwater & General Permits Unit Web Site al http://h2o.enr.state.nc.us/su/stornlwater.htnll If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions are listed on the bottom of the form. You will be notified when the rescission process has been completed. If you have any questions regarding the permit renewal procedures please contact Jim Reid of the Asheville Regional Office at 828-251-6208 or Bill Mills of the Central Office Stormwater Unit at (919) 733-5083. ext. 548 Sincerely, Bradley Bennett. Supervisor Stormwater and General Permits Unit cc: Central Files Asheville Regional Office ®fin NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1- 800-623-7748 State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director JEROME DAVE DAVE STEEL COMPANY P.O. BOX 2630 ASHEVILLE, NC 28802 A�� IL EDFEE HNFlt' September 24, 1997 Subject: Reissued Stormwater General Permit for Certificate of Coverage No. NCG030265 Buncombe County Dear Permittee: In response to your renewal application for continued coverage under the subject permit, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. The following information is included with your permit package: ■ A copy of the stormwater general permit. ■ A Stormwater Pollution Prevention Plan Certification Form. This form certifies that you have developed and implemented the Stormwater Pollution Prevention Plan (SPPP) required in your permit. This form must be completed and returned to the Division within 30 days of receipt of this letter. DO NOT send the SPPP with the signed form. o Five copies of Analytical Monitoring forms. Five copies of Qualitative Monitoring forms. s A copy of a Technical Bulletin on the stormwater program with outlines program components and addresses frequently asked questions. ■ A corrected Certificate of Coverage if you indicated a name or address change on the Renewal Form returned to the Division. Your certificate of coverage is not transferable except after notice to DWQ. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DWQ or permits required by the Division of Land Resources, Division of Air Quality, Coastal Area Management Act or any other Federal or Local governmental permits that may be required. If you have any questions conceming this permit or other attached documents, please contact the Stormwater Group at telephone number (919) 733-5083 Sincerely, for A. Preston Howard. Jr., P. E. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper r North Carolina cent of Envlronment, andtural Resources a°nme to Ma a9 melt of En 3. Hunt,.. Governor in B Howes, SecretE Director ,ton Howard, Jr., P•" erome Dave Steel Co. $Ox 2NC 2S902 eville, HN December 3,1993 it No• SCG030NO Subject: ellerSteeICompanY COC NCGOCounLY Buncombe we are er 11,1993, e errnit received on ct state - NPDES ge d the discharner g • P e under the subj Statute 143_215 •1 dated ;ar Mr. Dave: l!cation for e to discharge General a encY with YO4r aPF of coverag of Now' Carolina ental Protection g e subje nrsuant c the requirements the US Environm In accordance Carolina and errnit are arding herewith the North in this 4 it is issued p it elt. This peof Agreement between ents Con fitting an individual perm uencies or sampling requirements by vlem°randum 983 ling erm subm d binding• December 6, ent f rht e req individual shall be final an e Division If any parts, ou hay � he rig this certificate of coveraget after notice to d' oil, Y d is made,able excep require TO, or unacceptableUnless such demand e is not transferManage may application. is Certificate of coverage M e Division be reCoastal Area Please take notice y the emen its which may 1 Manag e certificate of coverage. other perm d Resources, of Environmenta, nirements to Obtain e Division of Lan ulred. and rerssuance of legal req urred by be req revocation affect theits req ental permit that maY ertnit does not of a emen or Pem'overnm telephone number 919173 This P or Local g r Bill Mills at to P Division of Environmen othM Federal Management Act or any this Permit, please contact M If you have any questions concerning Sincerely; .r,' ,at Signed BY 5083. 0aleen H. SulUns [�. Preston li°ward, Jr., P• E' Asheville Regional Office CC: p O. Box 29535, . m m eliverAct on Employer to er Raleig An Equal Opp rtunn Telephone 919-71 3%5083 cot !rne paper 919 50% recycled) ,t. STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DMSION OF ENVIRONMENTAL MANAGEMENT STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Dave Steel Company, Inc. is hereby authorized to discharge stormwater from a facility located at Dave Steel Company, Inc. 40 Meadow Road - Approx. 1/2 mile SW from intersection of US Hwy 25 and NC Hwy 81 Asheville Buncombe County to receiving waters designated as Swannanoa River in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV of General Permit No. NCG030000 as attached. This Certificate of Coverage shall become effective November 29, 1993. This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this day November 29, 1993. .ig�nal signed BY Coleen H. Sullins A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission FACILITY Bo COUNTY NPDES MAP DSN FLOW SUB BASIN 04, 03 - 02 LA iNTUDE" lu RECOV�oN,Gl STPEX*�Vll �5vqA N NA ri 0A F- 1 v5K STj'.,AMi CLASS - DISC14APGE CLASS 51vP MvVA-le ExPIRATION DATE 08— 61.- qT