Loading...
HomeMy WebLinkAboutNCG030228_COMPLETE FILE - HISTORICAL_20121204(R " STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v Ud DOC TYPE 1� HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE I ❑ j L) Q L2 YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Preformed Line Products Co PO Box 818 Albemarle, NC 28001 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Preformed Line Products Co COC Number NCG030228 Stanly County In response to your renewal application for continued coverage under stormwater General Permit NCG030000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of.the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone. 919-807-63001 FAX: 919-807-6492 Internet .ncwatergualitv.c-�g A.. Equal Opportunity \ Affirmative Aclion Employer NorthiCarolina Naturally December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections B, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections B, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections B, C: The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on -site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections B, C: The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQCentralFiles Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030228 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Preformed Line Products Co is hereby authorized to discharge stormwater from a facility located at: Preformed Line Products Co 1700 Woodhurst Ln Albemarle Stanly County to receiving waters designated as Little Mountain Creek, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4'h day of December, 2012. ��..,cI.CC� ✓ �'•7•vki'vi for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission VXIV NC®ENR ILEw, North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen H. Sullins Dee Freeman Governor Director Secretary September 16, 2011 Mr. Mark McCarter Preformed Line Products Company P. O. Box 818 Albemarle. North Carolina 28001 Subject: Compliance Evaluation Inspection Preformed Line Products Company 1700 Woodhurst Lane, Albemarle NPDES General Stormwater Permit NCG030000 Certificate of Coverage — NCG030228 Stanly County Dear Mr. McCarter: On August 31, 2011, Ms. Marcia Allocco and Mr. Wes Bell from the Mooresville Regional Office of the Division of Water Quality (DWQ) conducted a site inspection of the Preformed Line Products Company facility. The site drains to an unnamed tributary to Little Mountain Creek, Class C waters located in the Yadkin -Pee Dee River Basin. The site visit and file review revealed that the subject facility is covered by NPDES General Stormwater Permit — NCG030000. Accordingly, the following observations were noted.during the DWQ inspection (please see the attached addendum for information about your permit): 1) Stormwater Pollution Prevention Plan (SPPP) A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded, and properly implemented. Yes ❑ No There were a number of deficiencies noted with the SPPP as compared with the requirements noted in NCG030000. Please review the attached inspection report for more information. 2) Qualitative Monitoring Qualitative monitoring has been conducted and recorded in accordance with permit requirements. Yes ❑ No Please ensure semi-annual monitoring is completed in the future; review the attached inspection report for more information. 3) Analytical Monitoring Analytical monitoring has been conducted and recorded in accordance with permit requirements. Yes ❑ No Mooresville Regional Office Location, 610 East Center Ave., Suile 301 Mooresville, NC 28115 Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748 Internet hitp:llportal.nctlencorglweblwglhome An Equal Opportunity t. Affirmative Action Employer - 50% Racycle6i10% Post Consumer paper One NorthCarolina Naturally Mr. MarR MOCartef, Preformed line Products Company Comp lience;-valuation Inspection, Page 2 September 16, 2011 Please ensure that Discharge Monitoring Reports are submitted to the Division of Water Quality within 30 days of analytical result receipt using the attached forms. Please review the attached requirements for the field analysis of pH. Please review the attached inspection report for additional information. 4) Permit and Outfalts Please ensure that the illicit detection evaluation is completed annually and documented in the SPPP. As noted in the inspection the facility has one stormwater outfall collecting industrial stormwater discharges that needs to be monitored. Thank you for the assistance and cooperation during the inspection. As noted above and in the enclosed report, deficiencies were noted during the inspection. It is requested that a written response be submitted to this Office by October 14, 2011, addressing these deficiencies. In responding to the deficiencies, please address your comments to me at the address at the bottom of the letterhead. If you have any questions, comments, or need assistance with understanding any aspect of your permit, please do not hesitate to contact me at (704) 235-2204 or marcia.allocco(o)ncdenr.gov. Sincerely, I t J Marcia Allocco, MS Environmental Chemist Mooresville Regional Office Surface Water Protection Section cc: Water Quality Central Files Mooresville Regional Office Location. 610 East Center Ave., Suite 301 Mooresville, NO 28115 Phone: (704) 663-16991 Fax (704) 663-60401 Customer Service. 1-877-623-6748 Internet: httpalpoNal.ncdenr,oryMeblwglhome NorthCurolina Naturally t An Equal Opportunity t Affirmative Action Employer- 30% Recycled/10% Post Consumer paper Mr. Mark McCarter, Preformed line Products Company Compliance Evaluation Inspection, Page 3 September 16, 2011 ADDENDUM The National Pollutant Discharge Elimination System (NPDES) program was established under the federal Clean Water Act and then delegated to the Division of Water Quality for implementation in North Carolina. The NPDES permitting program for stormwater discharges was established in 1990. Phase I focuses on site and operations planning to reduce pollutant sources. Through the NPDES permitting program industrial facilities that fall into one of the subject ten categories are required to obtain permit coverage under a general permit or an individual permit, depending upon the facilities SIC code and the industrial activity occurring at the facility. There are currently 19 active general stormwater permits in North Carolina. One condition that is applicable to both the general permits and individual stormwater permits is the requirement to develop and implement site -specific comprehensive stormwater pollution prevention plans (SPPP). These plans are required to include a comprehensive evaluation of the site and operations to reduce pollutant sources and prevent pollutant discharge in stormwater runoff. Copies of the general permits and accompanying documents can be accessed from the following webpage: http://portal.ncdenr.org/web/wq/ws/su/npdessw#General Permits NPDES Permit text, technical bulletins, discharge monitoring forms, a Notice of Intent [which is the application of for coverage under a NPDES General Stormwater Permit], and the Representative Outfall Status application can be found on this website. The following items are a subset of permit requirements and are listed to assist you and help bring your attention to certain permitting issues, process, and condition requirements of your permit. Please see the abovementioned website to obtain a copy of the permit so you may fully comply with the conditions therein. Failure to properly comply with conditions of the permit, like those bulleted below, constitutes permit violations and is subject to civil penalty assessment of up to $25,000.00 per day. • Industrial facilities that fall into one of the subject ten categories are required to obtain permit coverage under a general NPDES stormwater permit or an individual NPDES stormwater permit • All persons desiring to have facilities covered by a General Permit must register with the Division of Water Quality (DWQ) by the filing of a Notice of Intent (NOI) and Applicable Fees. • This Notice of Intent (NOI) must be submitted and a Certificate of Coverage issued prior to any discharge of stormwater associated with the industrial activity, process wastewater, and/or mine dewatering. • Once the Notice of Intent is received, DWQ will review and determine whether a Certificate of Coverage (COC) may be issued. If this Certificate of Coverage is issued the facility is covered by the General Permit. That is, the permittee is authorized to discharge stormwater, process wastewater, and/or mine dewatering (pursuant to the type of General Permit) until the permit expires or is modified or revoked. • Any other point -source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization, or approval. • There are currently 19 active general permits. Permit conditions vary accordingly; however, most of the permits have the following condition requirements (you must read your entire permit to ensure full compliance): o Development and compliance with the Stormwater Pollution Prevention Plan o Collection, reporting, and recording of Analytical Monitoring Mooresville Regional Office Location. 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748 Internet: litr 1porlal.ncdenrcrg,weblwgibome One NorthCarol ina vyaturu!!y M Equal Opportunity � A(rumalive Action Employer— 30% Recycled110% Post Consumer paper Mr. Mark McCarter, Preformed line Products Company Compliance Evaluation Inspection, Page 4 September 16, 2011 o Collection, reporting, and recording of Qualitative Monitoring o Collection, reporting, and recording of Vehicle Maintenance Monitoring Records — Visual monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan. Copies of the analytical monitoring results shall also be maintained on site. The Permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original strip -chart recordings for continuous monitoring instrumentation, and copies of all reports required by this general permit for a period of at least 5 years from the date of the sample measurement, report, or application. Expiration — The permittee is not authorized to discharge after the expiration date of the general permit. In order to receive automatic authorization to discharge beyond the expiration date, the permittee shall submit forms and fees as are required by the agency authorized to issue permits no later than 180-days prior to expiration date. Any permittee that has not requested renewal at least 180 days prior to expiration, or any permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will be subject to enforcement. Failure to renew your permit is a violation. o Transfer — The Certificate of Coverage (COC) issued pursuant to this general permit is not transferable to any person expect after notice to and approval by the Director of the Division of Water Quality. The Director may require modification or revocation and reissuance of the Certificate of Coverage to change the name and incorporate such other requirements as may be necessary under the Clean Water Act. The Permit is NOT transferable. Name Change, Closure, or Facility Ownership change — The permittee is required to notify the Division in writing in the event the permitted facility is sold or closed. The Division of Water Quality views changes of name or ownership as a modification that requires the Director's approval and reissuance of the permit. Name and ownership changes required you to complete a Name/Ownership Change Form from the Division and mail it back to the Division of Water Quality along with all appropriate information. o Proper Operation and Maintenance is a requirement of the permit. Mooresville Regional Office Location: 610 East Center Ave., Suite 301 Mooresville, NO 28115 Phone: (704) 663-16991 Fax. (704) 663-60401 Customer Service: 1-877-623-6748 Internet:http:/Iportal.ncdenr.org/weblwglhorne NorthCarolina Natimally IN An Equal Opportunity 1 Af innatlae Action Employer- 30% Recycled110% Post Consumer paper Compliance Inspection Report Permit: NCG030228 Effective: 11/01/07 Expiration: 10/31/12 Owner: Preformed Line Products Co SOC: Effective: Expiration: Facility: Preformed Line Products Cc County: Stanly 1700 Woodhurst Ln Region: Mooresville Albemarle NC 28001 Contact Person: Mark McCarter Title: Phone: 704-983-6161 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Certification: Phone: Inspection Date: 08/31/2011 Entry Time: 10:20 AM Exit Time: 12.15 PM Primary Inspector: Marcia Allocco Phone: 704-663-1699 Secondary Inspector(s): Ext.2204 Wesley N Bell Phone: 704-663-1699 Ext2192 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant IM Not Compliant Question Areas: ® Storm Water (See attachment summary) Page:1 Permit: NCG030228 Owner - Facility: Preformed Line Products Cc Inspection Date: 08/31/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page:2 Permit: NCG030228 Owner - Facility: Preformed Line Products Co Inspection Date: 08/31/2011 Inspection Type: compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? m 0 0 0 # Does the Plan include a General Location (USGS) map? ® 0 n n # Does the Plan include a "Narrative Description of Practices'? m n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ® 0 n 0 # Does the Plan include a list of significant spills occurring during the past 3 years? n 0 0 # Has the facility evaluated feasible alternatives to current practices? ® 0 0 0 # Does the facility provide all necessary secondary containment? 0 0 0 # Does the Plan include a BMP summary? 12 0 0 0 # Does the Plan include a Spill Prevention and Response Plan (SPRP)? Cl [a 0 0 # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? m n ❑ 0 # Does the facility provide and document Employee Training? ❑ Es E1 0 # Does the Plan include a list of Responsible Party(s)? Im n n 71 # Is the Plan reviewed and updated annually? ® 0 0 n # Does the Plan include a Stormwater Facility Inspection Program? - 0 ® 0 0 Has the Stormwater Pollution Prevention Plan been implemented? ® 0 n 0 Comment: Please update the site map to reflect the reduced number of outfalls discussed during the inspection. Although the SPPP was dated 2011, please review and update information as necessary, many sections dated 1997/1998. For example, your BMP summary should be updated to reflect items that have been completed vs. proposed and a Spill Prevention and Response plan should be added. The SPPP includes a description of employee training although no training records were available during the inspection; employee training is required annually. The permittee is conducting monthly inspections of the facility although these are not documented. Please implement and document an inspection program within the SPPP. There were two areas where residual material was noted that could contaminate stormwater runoff; white substance near loading door A and an oily substance near loading door #2. Please take corrective actions to prevent the discharge of materials that can add pollutants to stormwater discharges. ivalitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ® 0 0 Comment: The permittee has been conducting qualitative monitoring but records could only be located for once -a -year monitoring in 2009 and 2010. Permittee still has time to conduct second monitoring in 2011. As noted during the inspection the permittee has only one outfall (not five) that are exposed to stormwater runoff from industrial activities. Qualitative monitoring should be conducted only at outfall 001 (stormwater pond). Page: 3 I Permit: NCGO30228 Owner - Facility: Preformed Line Products Co Inspection Date: 08/31/2011 Inspection Type: Compliance Evaluation Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Reason for Visit: Routine Comment: The permittee has conducted annual monitoring of the stormwater outfalls not semi-annual as per the permit. Reduced monitoring may have been attributed to drought conditions or sporadic rain events. If you cannot collect a sample within a designated six-month period please submit a "No -flow" DMR. All monitoring should be submitted to the Division on a DMR (copies included with this inspection) within 30 days of receiving the analytical results. As noted during the inspection the permittee has only one stormwater outfall (that receives flow from industrial activities) that will require semi-annual analytical monitoring (outfall 001 — stormwater pond). Please see the enclosed technical assistance document for the field analysis of pH which should be followed as per NCG030000 Part III, Section D, paragraph 4 —Test Procedures. Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: As discussed during the inspection, four of the five stormwater outfalls noted in the SPPP are exempt from industrial stormwater monitoring. The facility has one stormwater outfall (stormwater pond) that should be monitored semi-annually (qualitative and analytical monitoring). The,permittee last conducted an illicit discharge evaluation in 1997 (as noted in the SPPP). An illicit discharge evaluation was conducted during the inspection. Dry weather flow was noted in the drop inlets along the east side of the facility. The permittee should investigate the source of the dry weather flow and document this in the SPPP. Yes No NA NE ®Dg0 DDaU Yes No NA NE Page:4 r(WATF Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources co Alan W. Klimek, P.E., Director O Division of Water Quality August 23, 2002 JOHN ZIEBARTH PREFORMED LINE PRODUCTS CO PO BOX 818 ALBEMARLE, NC 28001 Subject: NPDES Stormwater Permit Renewal PREFORMED LINE PRODUCTS CO COC Number NC6030228 Stanly County Dear Permittee: In response to your renewal application for continued coverage under general permit NCG030000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: * A new Certificate of Coverage * A copy of General Stormwater Permit NCG030000 * A copy of the Analytical Monitoring Form (DMR) * A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or deci ee. If you have any questions regarding this permit package please contact Bill Mills of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater & General Permits Unit Files Mooresville Regional Office =`A NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1- 800-623-7748 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources December 27, 2001 PAUL U RUBIO PREFORMED LINE PRODUCTS CO PO BOX 819 ALBEMARLE, NC 28001 Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality APR i G 2,902 Subject: NPDES Stormwjter Permit Renewal PREFORMED LINE-PRODUCTS.CO;}rb{����� COC Number NCG030228 Stanly County Dear Permittee: Your facility is currently covered for storm water discharge under General Permit NCG030000. This permit expires on August 31, 2002. The Division staff is currently in the process of rewriting this permit and is scheduled to have the permit reissued by late summer of 2002. Once the permit is reissued, your facility would be eligible for continued coverage under the reissued permit. In order to assure your continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit coverage. To make this renewal process easier, we are informing you in advance that your permit will be expiring. Enclosed you will find a General Permit Coverage Renewal Application Form. The application ntus't be completed and returned by March 4, 2002 in order to assure continued coverage under the general permit. Failure to request renewal within this time period may result in a civil assessment of at least $250.00. Larger penalties may be assessed depending on the delinquency of the request. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and Could result in assessments of civil penalties of up to $10,000 per day. Please note that recent federal legislation has extended the "no exposure exclusion' to all operators of industrial facilities in any of the I I categories of "storm water discharges associated with industrial activity," (except construction activities). ff you feel your facility can certify a condition of "no exposure", i.e. the facilly industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff ntenther listed below or check the Stormwaler & General Permits Unit Web Site at hitp://h2o.enr,state.nc.us/su/stormwater.litml If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions are listed on the bottom of the form. You will be notified when the rescission process has been completed. If you have any questions regarding the permit renewal procedures please contact Mike Parker of the Mooresville Regional Office at 704-663-1699 or Bill Mills of the Central Office Stormwaler Unit at (919) 733-5083, ext. 548 Sincerely, Bradley Bennett, Supervisor Slot mwater and General Permits Unit cc: Central Files Mooresville Regional Office N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 I- I NCDENR Customer Service 1- 800-623-7748 Marcia Allocco Environmental Chemist Mooresville Regional Office Surface Water Protection Section Dear Ms. Allocco: October. 10 2011 RP EIVED DIVISiOf,. WATER0i %LITY OCT 11 2011 Sv'r' SCCTION MOORESVILL E REGIONAL OFFICE Thank you on helping me with the deficiencies in our Storrmwater Plan. We are in the process of updating and re -typing our entire Stormwater plan. The two areas where material was seen on the pavement have been cleaned up and notification was made to employees about the mater. I walked the area on October 3rd and did not see any discharges and looked into all the outside paved area drains and did not see the flow of water into the pipe that we noted on the inspection. It was a cool morning and the air conditioners were not running, so that flow must have been from condensation on the coils. I also checked the drains this morning and found nothing flowing in the bottom of the drains. Attached are copies of the outside training we have had on spill control. We are having this years' training on Friday 10/14. We will include additional training on preventing stormwater contamination. Also included is the new map showing where the stormwater sample is collected. I should be able to get the next qualitative and analytical stormwater analysis before the end of the year. It will be much easier now since it is now one area sampling instead of five. Prior to my doing the sampling, Alpha Environmental, was doing our sampling. I have been forwarding them my results for the last two years. I think they have been sending the Stormwater Discharge Outfall Monitoring Report to your office, but I will start sending it myself. If you need any additional information, please let me know ASAP. Sincerely, Mark McCarter Technical Services Engineer Preformed Line Products RECEIVED DIVISION OF IN!ATER QUALITY Allocco, Marcia UL l From: McCarter, Mark [mmccarter@preformed.com] Sent: Monday, October 10, 2011 5:08 PM SVVP L;: �;TION To: Allocco, Marcia MOORESVILLE REGIONAL OFFICE Cc: Kennedy, April Subject: NPDES General SW Permit NCG030000/ NCG030228 Attachments: 20111010_105959.pdf; 20111010_104335.pdf; 20111010_104800.pdf, 20111010_ 105328.pdf; 20111010_105404.pdf; 20111010_105726.pdf; 20111010_105828.pdf; NCDENR M Allocco 2011.doc; PLP Stormwater Site.pdf Marcia Allocco Environmental Chemist Mooresville Regional Office Surface Water Protection Section Dear Ms. Allocco: Thank you on helping me with the deficiencies in our Stormwater Plan. We are in the process of updating and re -typing our entire Stormwater plan. The two areas where material was seen on the pavement have been cleaned up and notification was made to employees about the mater. I walked the area on October 3rd and did not see any discharges and looked into all the outside paved area drains and did not see the flow of water into the pipe that we noted on the inspection. It was a cool morning and the air conditioners were not running, so that flow must have been from condensation on the coils. I also checked the drains this morning and found nothing flowing in the bottom of the drains. Attached are copies of the outside training we have had on spill control. We are having this years' training on Friday 10/14. We will include additional training on preventing stormwater contamination. Also included is the new map showing where the stormwater sample is collected. I should be able to get the next qualitative and analytical stormwater analysis before the end of the year. It will be much easier now since it is now one area sampling instead of five. Prior to my doing the sampling, Alpha Environmental, was doing our sampling. I have been forwarding them my results for the last two years. I think they have been sending the Stormwater Discharge Outfall Monitoring Report to your office, but I will start sending it myself. If you need any additional information, please let me know ASAP. Sincerely, Mark McCarter Technical Services Engineer Preformed Line Products Compliance Solutions ...._.... 'rod"Tmwz -. raffles w`ssauNm^ 3 Oust. St end Fb Oar war, CO 8=7-1833 8 711-27M Certificate of Completion This is to certify that Kenneth Chambers has successfully completed the training requirements for 40 Hour HAZWOPER 29 CFR 1910.120(e) Presented Friday, September 05, 2068 A Pnfo d Lam Pra&u Co 99128121 Compliance Solutions Occupational Trainers, Inc. Certificate, Number: 754786655 Neval Gupta Pace President Jeffrey Kline PresidentICEO j 31 5 1 CARpLINA STATE UNI 10g�� �E�S ITS Bennie W. Wrenn Has Successfully Completed HazWOPER Refresher Training per 29 CFR 1910.120(e)(8) & (q)(8) 8 Hours of Training September 9, 2010 Continuing Education Industrial Extension Service College of Engineering OF ENGINEERING ASST. VICE CHANCELLOR FOR EXTENSION AND ENGAGEMENT IES EXECUTIVE DIRECTOR 'SY�. 1. �. f .,2:F.! o J 4 `='"NN � �`✓.:C; u. ! .�".""�- -� F ^s...,� w.�-.+.':$a "#�...-�3'.'t �-?-�:_YS..ne.-.z...�ii.°.'�.'_s�f.2�Fi�.ui✓�.��—.c�Ici .-r W1 KI 1� � tilfl eve..AWFAclLW1O OM] NAL BIIWxO '•"'"' @MASTER SITE PLAN VIGINITY MPP O \ \ \ \ o Q .nag 3 E Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources � —I December 27, 2001 PAUL U RUBIO PREFORMED LINE PRODUCTS CO PO BOX 818 ALBEMARLE, NC 28001 Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality Subject: NPDES Stormwater Permit Renewal PREFORMED LINE PRODUCTS CO COC Number NCG030228 Stanly County Dear Permittee: Your facility is currently covered for stormwater discharge under General Permit NCG030000. This permit expires on August 31, 2002. The Division staff is currently in the process of rewriting this permit and is scheduled to have the permit reissued by late summer of 2002. Once the permit is reissued, your facility would be eligible for continued coverage under the reissued permit. In order to assure your continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit coverage. To make this renewal process easier, we are informing you in advance that your permit will be expiring. Enclosed you will find a General Permit Coverage Renewal Application Norm. The application must be completed and returned by March 4, 2002 in order to assure continued coverage under the general permit. Failure to request renewal within this time period may result in a civil assessment of at least $250.00. Larger penalties may be assessed depending on the delinquency of the request. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $10,000 per clay. Please note that recent federal legislation has extended the "no exposure exclusion" to all operators of industrial facilities in any oh the I I categories of "storm water discharges associated with industrial activity," (except construction activities). If you feel your facility can certify a condition of "no exposure", i.e. the facilty industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff member listed below or check the Stormwater Nc General Permits Unit Web Site at http://h2o.enr.state.nc.us/su/storniwater.html If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions are listed on the bottom of the for You will be notified when the rescission process has been completed - If you have any questions regarding the permit renewal procedures please contact Mike Parker of the Mooresville Regional Office at 704-663-1699 or Bill Mills of the Central Office Stormwater Unit at (919) 733-5083. ext. 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Mooresville Regional Office e?n z. NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1- 800-623-7748 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 1 O 1 JOHN ZIEBARTH PREFORMED LINE PRODUCTS CO PO BOX 818 ALBEMARLE. NC 28001 Dear Permittee: Alan W. Klimek, P.E., Director Division of Water Quality August 23, 2002 Subject: NPDES Stormwater Permit Renewal PREFORMED LINE PRODUCTS CO COC Number NCG030228 Stanly County In response to your renewal application for continued coverage under general permit NCG030000. the Division of Water Quality (DWQ) is forwarding herewith the reissued Stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: * A new Certificate of Coverage * A copy of General Stormwater Permit NCG030000 * A copy of the Analytical Monitoring Form (DMR) * A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,'rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Bill Mills of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 548 cc: Central Files Stormwater & General Permits Unit Files Mooresville Regional Office Sincerely. /J/t1L.LC/1,J I-5e L'V' Bradley Bennett, Supervisor Stormwater and General Permits Unit NCETPT.OF' AMD NATO` AUG 2 9 2002 N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 e`n NCDENR Customer Service 1- 800-623-7748 State of North Carolina Department of Environment,IT Health and Natural Resources Division of Water Quality A&4 James B. Hunt, Jr., Governor Wayne McDevitt, Secretary C A A. Preston Howard, Jr., P.E., Director C V September 24, 1997 PAUL U RUBIO PREFORMED LINE PRODUCTS CO PO BOX 818 ALBEMARLE, NC 28001 Subject: Reissued Stormwater General Permit for Certificate of Coverage No. NCG030228 Stanly County Dear Pemuttee: In response to your renewal application for continued coverage under the subject permit, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. The following information is included with your permit package: ■ A copy of the stormwater general permit. ■ A Stormwater Pollution Prevention Plan Certification Form. This form certifies that you have developed and implemented the Stormwater Pollution Prevention Plan (SPPP) required in your permit. This form must be completed and returned to the Division within 30 days of receipt of this letter. DO NOT send the SPPP with the signed form. s Five copies of Analytical Monitoring forms. ■ Five copies of Qualitative Monitoring forms. ■ A copy of a Technical Bulletin on the stormwater program with outlines program components and addresses frequently asked questions. ■ A corrected Certificate of Coverage if you indicated a name or address change on the Renewal Form returned to the Division. Your certificate of coverage is not transferable except after notice to DWQ. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DWQ or permits required by the Division of Land Resources, Division of Air Quality, Coastal Area Management Act or any other Federal or Local governmental permits that may be required. If you have any questions concerning this permit or other attached documents, please contact the Stormwater Group at telephone number (919) 733-5083 Sincerely, for A. Preston Howard, Jr., P. E. P.O. Box 29535, Raleigh. North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, 1-lealth and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director October 1, 1993 Mr. Paul U. Rubio Preformed Line Products Co. P.O. Box 818 Albemarle, NC 28001 Subject: General Permit No. NCG030000 Performed Line Products Co. COC NCG030228 Stanly County Dear Mr. Rubio: In accordance with your application for discharge permit received on October 21, 1992, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management. The Division of Environmental Management may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Mr. Bill Mills at telephone number 919/733- 5083. Sincerely, r,c, O'd ?q H:5�1u,1s A. Preston Howard, Jr., P. E. cc: Mooresville Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733.9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT STORMWATER DISCHARGES In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Preformed Line Products Company is hereby authorized to discharge stormwater from a facility located at Preformed Line Products Company 1700 Woodhurst Lane Albemarle Stanly County to receiving waters designated as an unnamed tributary to Little Mountain Creek in the Yadkin -Pee Dee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV of General Permit No. NCG030000 as attached. This Certificate of Coverage shall become effective October 1, 1993. This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this day October 1, 1993. R-;ai,,:)! 's � I By Guieen K Sullins A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission 577 10, '76 e78 11 660 000 FEET 579 80°P7'30' 35*22 177fi \ o \ �1.f ��� n\'\�,• � r (' L •� � 11/U V�IU•�\ '(%�� .� � O C�1Pa�• illll OIr. � �V III �.� u• 'I � yi__ / r �II � h� •.l \ .y ae14 FEE IV lA 5868 3013 1 A -P rkway H \ -� • 7 �'(' it 3-12 a '5Mg Via', rove � �• 111 � Sx eeb HoCh (( �� � /1 1� J �. l •,.r , � ��i ��— � � i I� all ( pi 11 �• �i II�// _ l i , 20' 54 ie10 JI r ( 1 / lJ v 8'M' A .e, FACILITY COUNTY, NPDES M.p I I': S ..I FLOW <<Ji rJ CCU p3n2�Z8 I'� SvCf LONGITUDE RECEIVING STREW STREAM CLASS DISCHARGE CLASS 3 5C 20 3p n p r 11 60 D� 55 U N IJ"ej- 'T-r S tzM vw A-rEp\, EXP!MAPON DATE C'-31-C)7 (19"P414 L OT(,ir Nf N N ems, STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030228 S'I'ORMWATER DISCHARGES NATIONAL POLLU'rANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, PREFORMED LINE PRODUCTS CO is hereby authorized to discharge stormwater from a facility located at PREFORMED LINE PRODUCTS CO 1700 WOODHURST LN ALBEMARLE STANLY COUNTY to receiving waters designated as a Ur to Little Mountain Creek, a class C stream, in the Yadkin - Pee Dee River Basin in accordance with the effluent limitations. monitoring requirements, and other conditions set forth in Parts I, 11, Ili, IV, V, and VI of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective September 1, 2002. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day August 23, 2002. (or Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission