HomeMy WebLinkAboutNCG030118_MONITORING INFO_20121204STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
IvC,%()3o % 0
DOC TYPE.
❑ HISTORICAL FILE
[MONITORING REPORTS
DOC DATE
❑ a a. a y
YYYYMMDD
RECEIVED
DEC 0 4 2019
CEN-i RAL FILES
DWR SECTION
Monthly Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 11/30/2019
CERTIFICATE OF COVERAGE NO. NCG030118
FACILITY NAME: Unamar Forgings Inc. (Formerly Carolina Forge Corp.)
COUNTY:Wilson
PERSON COLLECTING SAMPLES Jim Frei/Stormwater Group
LABORATORY: PaceLabs-Raleigh/Charlotte/Asheville
I1 Lab Cert. ft 67/12/40 Comments on sample collection or
analysis: Due to severe drought conditions there was no rainfall event
that resulted in Stormwater flow this month.
II. Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2019
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly October 2019
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow []WaterSupply ❑SA
®Other C.SW. NSW
PLEASE REMEMBER TO SIGN ON PAGE 3 4
❑ No discharge this period?'
Outfall No.
Date Sample
Collected' �
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
.Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss-
Benchmarks===>
-
'100mg/V
6.0-9.0
0.010 mg/L
0.075 mg/L"
0.126 mg/L;
15 mg/L
Img/L
SDOp004
10/13/2019
0.82
220
7.4
0.026
0.010
0.56
<4.8
NA
1
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring -
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
.Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
"Based upon my inquiry of the person or persons directly responsible forma raging compliance with the permit monitoring requirement for total toxic organics
(1TO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the 5tormwater Pollution Prevention Plan."
I: Name (Print name)
Title (Print title)
(Signature)
NA
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BOIL, <PQL, Non -detect, NO, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX ni where XX Is the numerical value of the detection
'limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
I I
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month.
No discharge this period?'
'I
�. Outfall No.
Date Sample
Collected'
o/dd/yr) (m
24-hour rainfall
amount,
Inches'
Non -polar OBG/TPH by
EPA '1664(SGT-HEM)
Total Suspended Solids
pH
Benchmarks===>
-
15 ni
100mg/Lor50mg/L' _
6.0-9.05U
NA
NA
NA
NA
NA
NA
Footnotes from Part A also apply to this Part B
- See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
i Page 2 of 3
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK E%CEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2E%CEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION 9.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK E%CEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
iI REGIONAL OFFICE CONTACT NAME: John Holley
Mail an original and one cop of this DMR, including all "No Discharge' reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to
Division of Water Quality
Attn: DWQCentral Files
1617 Mail Service Center
^i Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"'I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of rmittee)Dusty R. Viverette, Environmental Coordinator ( ate
Permit Date 11/l/2012-10/31/2017 SWU-245, last revised 10/25/2012
1 1 Page 3 of 3