Loading...
HomeMy WebLinkAboutNCG030070_MONITORING INFO_20190724STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. N CCU 3 b DOC TYPE ❑ HISTORICAL FILE CSC MONITORING REPORTS DOC DATE ❑ �c) YYYYMMDD I\ It It P% IP 1® July 17, 2019 Central Files Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 ABB Motors and Mechanical 70 Reems Creek Rd Weaverville, NC 28787 RECFIVED JUL 2 4 2019 CENTRAL I:ILES CwR SECTION ON Re: ABB Motors and Mechanical (previously Baldor Electric) General Permit No. NCG0030070 Please note the name change above. We have been part of the ABB group for some time, previously operating as Baldor Electric. A name change request has been submitted Please find enclosed the stormwater discharge monitoring report for semi-annual sampling that was conducted during May and June of 2019. The May report reflects No Flow. No samples in this group exceeded the benchmark limits. Please contact me with operational or compliance issues. Otherwise contact Dan March of Pisgah Environmental Services at 828-768-3335 or via email at Pis ah-air ,vt.edu if you have questions or comments concerning technical aspects of this report. Sincer ly, Gary Mass y GU Safety Coordinator ABB Motors and Mechanical 828-645-1718 gary.massey. n us.abb.com Page I of I Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted CERTIFICATE OF COVERAGE NO. NCG03 0 0 7 0 FACILITY NAME ABB Motors and Mechanical COUNTY Buncombe PERSON COLLECTING SAMPLES Dan March LABORATORY Lab Cent. # Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or 0 Monthly' YkU month DISCHARGING TO CLASS ❑ORW []HttW ❑Trout ❑PNA ❑Zero -flow [:]Watersupply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 --> ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organicss Benchmarks - - 100 mg/L or 50 mg/L^ 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 35 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 May 2019 NO FLOW Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. ' For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Dale Spivey Name (Print name) Plant Manager e (Print title) G -7 - l� Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L', where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 New Motor Oil or Hydraulic Oil Usage Non -Polar 0&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L° Parameter Code - 46529 NCOIL 00552 CO530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/l/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES [:]NO[] IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal copy of this DMR, includinq aO "No Discharqe" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I_ am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of 9'� Date Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3