Loading...
HomeMy WebLinkAboutNCG030063_MONITORING INFO_20200123TTt) STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. G D3 u 0�3 DOC TYPE ❑ HISTORICAL FILE u MONITORING REPORTS DOC DATE ❑ a �a b O a 3 YYYYMMDD /► 1! 1� r111101/ Industrial Connections & Solutions LLC BUSINESS AREA Industrial Solutions 6801 Industrial Drive FROM Natalie L. Stennis, MS, FE II Mebane, North Carolina 27302 PHONE DIRECT 919-563-7521 li USA i MOBILE DIRECT 336-554-4140 E-MAIL Natalie.stennlsllaus.abb.com CERTIFIED MAIL 7018 0360 0001 0020 W78 RECEIVED January 8, 2020 JAN 2 3 2020 NC DEQ / Division of Water Resources Attention: Central Files DENTRAq. FILE$ 1617 Mail Service Center DWR SECTION Raleigh, North Carolina 27699-1617 Re: NPDES Stormwater Permit Coverage Renewal COC #NCG030063 Industrial Connections & Solutions LLC — Stormwater General Permit NCG030000 Dear Sir or Madam: In accordance with our NPDES Stormwater Permit, Industrial Connections & Solutions LLC is notifying the Division of Energy, Mineral, and Land Resources (DEMLR) of benchmark value exceedance for Out - falls SDO-I & SDO-6 for copper and zinc. Outfalls SDO-4 & SDO-5 no longer exist at our site as a result of the current expansion project. Outfall SDO-2 was observed to have zero flow at the time of inspection. We will continue to conduct monthly sampling while looking for solutions to the continuous benchmark exceedances. The following documents are enclosed: 1. Stormwater Discharge Monitoring Report 2. Lab Results from Sampling (Meritech, Inc.) 3. Qualitative Monitoring Reports (SDOs) — Blue Ridge Geological Services, Inc. If you have any questions about this report, please contact me at (919) 563-7521. Sincerely, Natalie L. Stennis, MS, FE Lead HSE&S Specialist Attachments Industrial Solutions 6801 Industrial Drive Mebane, NC 27302 USA vnvw.abb.t. 1/1 -StdrmwaterDischarge Monitoriiik Ri6port - for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted January 7, 2019 CERTIFICATE OF COVERAGE NO. NCG03 0 0 6 3 FACILITY NAME Industrial Connections & Solutions LLC COUNTY orange PERSON COLLECTING SAMPLES Jeff Garlock LABORATORY Mentech, Inc Lab Cert. # 165 Comments on sample collection or analysis: Measurable Rainfall Event Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD Jan -June ❑ July -Dec or F] Monthly' b4ESc WC (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water supply ❑SA ECEI` ED ❑Other JAN 2 8 2020 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 BEN I RAL FILES DWR SECTION n No discharge this period?' Cutfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids PH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks _ - 100 mg/L or 50 mg/L4 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 G0400 01119 01051 01094 00552 78141 SDO-1 1 12/10/19 0.36 9 7.04 0.013 <0.010 0.192 <5 - SDO-2 12/10/19 No Flow - - - - - SD0-3 12/10/19 0.36 11 7.14 0.007 <0.010 0.074 <5 - SDO-6 12/10/19 0.36 27 6.98 0.025 <0.010 0,178 <5 - SDO-7 12/10/19 0.36 19 7.15 0.009 <0.010 0.024 <5 - ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfali. Z For sampling periods with no discharge at any single outfali, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWIJ-245, last revised 11/1/2018 Page 1 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES Q NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES 0 NO ❑ REGIONAL OFFICE CONTACT NAME: Thad valentine Mail an original copv of this DMR, including all 'No Discharge" reports within 30 days of receipt of the lob results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties—f/xubmitting false information, including the possibility of fines and imprisonment for knowing violations." Permittee Permit Date:li/1/2018-OS/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 --incorporate- - -- Facilities that a solvent -management lan into the Stoi•mwate� Pollutioh'Prevention`Plamma soterti - quuemenb or - monitoring _- p y ;an t the g_ may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Dominic A. Pitocco, Jr. Name (Print name) Plant Manager Title (Print title) Signature Dat Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX m¢/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. (—I No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code - 46529 NCOIL 00552 CO530 Footnotes from Part A also apply to Part B Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 Meritech, Inc. y . Environmental Laboratory Laboratory Certification No. 165 Contact: Natalie L. Stennis Report Date: 12/27/2019 Client: ABB-Industrial Conn & Sal 6801 Industrial Dr. Project: GE/ABB Mebane, NC 27302 Date Sample Rcvd: 12/12/2019 Meritech Work Order # 12121904 Sample: SDO-1 Grab 12/10/19 18:00 Parameters Results Analysis Date Analyst Reporting Limit Method Total Suspended Solids 9 mg/L 12/17/19 JM 2.5 mg/L SM 2540 D Copper, total 0.013 mg/L 12/23/19 ED 0.002 mg/L EPA 200.7 Lead, total <0.010 mg/L 12/23/19 ED 0.010 mg/L EPA 200.7 Zinc, total 0.192 mg/L 12/23/19 ED 0.010 mg/L EPA 200.7 Oil& Grease (SGT/HEM) <5 mg/L 12/17/19 BF 5 mg/L EPA 1664B Meritech Work Order# 12121905 Sample: SDO-3 Grab 12/10/19 18:15 Parameters Results Analysis Date Analyst Reporting Limit Method Total Suspended Solids 11 mg/L 12/17/19 JM 2.5 mg/L SM 2540 D Copper, total 0.007 mg/L 12/23/19 ED 0.002 mg/L EPA 200.7 Lead, total <0.010 mg/L 12/23/19 ED 0.010 mg/L EPA 200.7 Zinc, total 0.074 mg/L 12/23/19 ED 0.010 mg/L EPA 200.7 Oil. & Grease (SGT/HEM) <5 mg/L 12/17/19 BF 5 mg/L EPA 1664 B Meritech Work Order # 12121906 Sample: SDO-6 Grab 12/10/19 17:30 Parameters Results Analysis Date Analyst Reporting Limit Method Total Suspended Solids 27 mg/L 12/17/19 JM 2.5 mg/L SM 2540 D Copper, total 0.025 mg/L 12/23/19 ED 0.002 mg/L EPA 200.7 Lead, total <0.010 mg/L 12/23/19 ED 0.010 mg/L EPA 200.7 Zinc, total 0.178 mg/L 12/23/19 ED 0.010 mg/L EPA 200.7 Oil & Grease (SGT/HEM) <5 mg/L 12/17/19 BF 5 mg/L EPA 1664 B „ Meritech Work Order # 12121907 Sample: SDO-7 Grab 12/10/19 17:45 Parameters Total Suspended Solids Results 19 mg/L Analysis Date 12/17/19 Analys JM Reporting 2.5 Limit mg/L Method SM 2540 D Copper, total 0.009 mg/L 12/23/19 ED 0.002 mg/L EPA 200.7 Lead, total <0.010 mg/L 12/23/19 ED 0.010 mg/L EPA 200.7 Zinc, total 0.024 mg/L 12/23/19 ED 0.010 mg/L EPA 200.7 Oil & Grease (SGT/HEM) <5 mg/L 12/17/19 BF S mg/L EPA 1664 B I hereby certify that I have reviewed and approve these data. 4 642 Tamco Road, Reidsville, North Carolina 27320 tel.(3,36)342-4748 fax.(336)342-1522 "- Chain -of Custody Record (COC)-- _ >- -- -_ - _- — _ _ _— ___ _ — _ _ -- NPDESq: Client:_ABB - Industrial Conn and Sol Phone:_ 207-376-6368 M E RITECH INC 1 . Address:_6801 Industrial Drive Fax:_919-563-7224 ENVIRONMENTAL LABORATORIES Mebane, NC 27302 Email:_ natalie.stennis@us.abb.com 642 Tamco Rd. Phone: 336-342-4748 t Project:_- 1* Reidsville NC 27320 Fax: 336-342-1522 P.O.#: Email: info@meritech-labs.com Attention:_ Natalie L. Stennis Turn Around Time• RUSH work needs prior approval. How would you like your report sent? www.meritech-labs.com Circle all that apply: Email preferred)', Fax, Mail std 10 da s) s za-a9 Hrs Sampling Dates &Times Person,TakingSampleC /Brio : ;Lab JWSLi r .a.� Sample Location and/or ID # Start End Comp?. rfea7 pEsQK?.' Date Time Date Time Grab? CoTest(s)dauired on[. -Yes' rNo CLOK? SDO-1 r/ f 7% ( Va G 3 TSS; Total Cu, Pb, Zn; Oil and Grease (HEM) 04 !, d SDO-3 % x/ I //0 �/� G 3 TSS; Total Cu, Pb, Zn; Oil and Grease (HEM) G a y DOW n SDO-6 �,, I z J G 3 TSS; Total Cu, Pb, Zn; Oil and Grease (HEM) d SDO-7 % I Z J f 1 S G 3 TSS; Total Cu, Pb, Zn; Oil and Grease (HEM) C q, q VA);,t T6iperature"Upon.: Recap Method '"' Dechlorination e0.5 m of Ammonia Cyanide, Phenol and TKN samples must be done in the field prior to presentation. •"' of com R6o 4.?' Shipment:-x UPS ❑ Fed Ex Are these results for regulatory purposes? Yes 111 No ❑ Report r19 Its in: mg/L In mg/kg ❑ ug/L ❑ �HandDelivery, Relinquished by: Date:/ / Time: zfl �� Receive L �ie: Time: / 20U ❑ Other /rAte:I Time: �( Recei ed Date: Time: Relmq shed by: Date: Time: _ rpe� e ved b Nab: 5 Ab IS 40 in 11 x-_ December 18, 2019 Ms. Natalie Stennis Industrial Connections & Solutions LLC / ABB 6801 Industrial Drive Mebane, North Carolina 27302 Subject: Report of Stormwater Inspection and Sampling - December 2019 Industrial Connections & Solutions / ABB 6801 Industrial Drive, Mebane, North Carolina Dear Ms. Stennis: As authorized by acceptance of our proposal dated September 2016 and your requests to continue sampling, Blue Ridge Geological Services, Inc. (Blue Ridge) personnel performed additional environmental services at the subject site. The work was performed in general accordance with the Stormwater Pollution Prevention Plan (S WPPP) prepared for the subject site as well as the requirements of NCDEQ NPDES General Permit. On December 10, 2019 Blue Ridge personnel performed a stormwater inspection and sampling event at the subject site during a measureable rainfall event. Rainfall data was obtained from a nearby weather station. According to the website, the area in the vicinity of the subject site received approximately 0.36 inches of rain during the storm event. Blue Ridge personnel observed the stormwater discharge at outfalls SDO-I through SDO-7 and completed stormwater discharge outfall (SDO) qualitative monitoring report forms for each of the outfalls. The SDO forms are attached. The pH of the samples was measured in the field using an Oakton pH meter and recorded on the SDO forms. No environmental issues were observed at the outfalls during this inspection. Field personnel collected samples from each of the stormwater outfalls, placed the samples into labeled containers, completed a chain of custody (COC) form, and submitted the samples and COC form to Meritech personnel. Outfalls SDO-4 and SDO-5 were destroyed during the recent construction activities at the site, therefore, no samples were obtained from these outfalls. In addition, there was no flow from Outfall SDO-2 on this date therefore no sample was collected from this outfall. This inspection report and the SDO forms should be placed in the SWPP Plan or a file on site and they do not need to be submitted to the NCDEQ. We will attempt to perform the next stormwater inspection/sampling event at the site before January 31, 2020. We appreciate the opportunity to continue to assist you on this project. Please contact the undersigned at if you have any questions regarding this report or if you need additional assistance. Sincerely, (13 C'7-11�lv. Jeffrey L. Gerlock, L.G. Attachments — SDO Report Forms Blue Ridge Geological Services, Inc. • 7356 Belmont Drive, Trinity, NC 27370' Phone: 336-382-6849 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Fwgpdwc,wfiGugwa du,) ,dense v4b httpsJldegx.pVMwUdlvlsiam/awp'-mi,ca4Wd-resamctY aPdaasamm Sr-gyl Permit No.: N/CI / /, / / / / / or Cer6ftcateofCoweSVNo.: N/CA1,0/3/0/01.6/3 / perility Name: Industrial Conner Ms.rd Schvio.a / ABS Cpmty: _Onop Phone No. _919463-5561 Intpuc= _JSffGerlock �1 Dam of Inspection: I ,i IIJ l Teal Ever Precipitation (inches): A➢ permits «quirt qudim6w treatments m be performed during a "Soeaaunble dorm eve,." A'...We porn swot" is a slam ewers, am ressdta in o .usual dimharge from the permitted Sim outfpl. The pmvi. moM..bk worm event must hsw been a lent 72 hours prior. The 724our rearm intcaval does not apply if the permince is able to document chat a shores, inwrvai is mPmwmtiw far loci steam awn- during the sa'nPling period, rod the partaken obt sins approval hem the local DEMLR. R,V.r.1 Offae. Bythis Signature, I cavity that this report is sexamate ad complete-tbe beet ofmy knowledge: (Sigrmvue ofP iv¢ Designee) 1. OvCall Description: Orafdl No. SDO-I Smumm, (pipe, ditch. eve): Ditch below culwrt Receiving StrannuMaw Creck Desmbe the industrial .vivid. that otem within the outf JI drainage seen: docks. AST, trectsiberate, Nki,- Page 1 of2 SWn24a WaoflMa6aVN lr 2. Color: Describe the celar of the discharge using barb, coon (rt4 bmwo. lobe, etc.) srd dm (light, medivac dark) p despiPters 3. Oda. D,.0 my di • «odes dfv We discharge Sony hove (i.e., wells strongly of oil, weak thlorlca odor. ear.): 4. Cisrity: Choose the number which best describes the clarity ofthe disdurge,wheel isclem and 5 is wry cloudy. 1 2 3 a 5 S. Floating Solids: Chop -the number whichbast describes the Scanner ofao.tkg-Iidsh'the stmmwater discharge, when 1 is /no Solids and 5 is the surface wwred with floating Solids: / 11 z 3 a s 6. Susptoded S.116% Choose due Smuber which bare describes the armors of suR=ded -lids in the Srmmwatca discharge, where I is en soliis and 5 extremely muddy: 012 3 a s 7. B then my foam k [h nurmw-,at di-hsrge7 O Y. xNo. S Is there an oa sham in the srdrmwatp di-haege7 OYn A No. 9. Is these avidmce ofesmbo or cepodaias a elm nuttra7 OYn fQ(No. 10. Other Obvlomiedieston fStarmwamr Paamion: Ust..dde-rib. M� Nate: Low clariy, Wgh-Bds,.od/ar the pmean of fwm, ell abca0. orendoddspadtio mry be Indle.lhe ol polimev npmaca. These ceoditlom warravl fnphrr iaveplptkv. swU.a1. lee motiha a1411A I I Page 1 of2 I Color. Esmibed colm.ftiediwhar IC (Egm, m dimu dark) d descrip w,: ro.kweamM maekr Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report ForruiAsmv ow/Iflus, oa Mf/ pbme Mau Mp//hqm.tT/abaat/divhiwu/rnwp'mineraFhwdyeswrtea/ Permit No.: tytC / / / / / / / or Certifwmof Coverage No.: N/GGN/3/0/0/.613 / FacilityName: Industrial Comectiom and Solutiom / ABB Coumy: pwse —Ph .e No. 919-5635561 Ir umor. J Dateofluspecuo I;z If IS G Time of Wpemiw: I Q'L7 Taal Event Precipiutioo (mends): _.+ 36 AU permits requia 9aliatiw m .domes to be pmfomed during 0'uesrurable seems evrnl" A "e essatabk rlmm pat^ is a norm ewes duet wound in an sdal ellseWrge from the permitted rite mefali. The previous metwable s s m ewot must haw been a least 72 hour prior. TM 724=r storm imtemu foes rot apply if the pmmime is able to dommtbn that s damor imerval is mpesesduiw for local tram evrnb during the sampling period. and the pernitee obteim approval from the ImW DEMLR Re 'oral Ofnee. By this sigmmm;1 certify Nat this report is secuate mid mmplde w the best ofmy knowledge: 5 4LL (SigmtumofP i _. Dtugoee) i 1. outwit Description: Oetfdl No. SDO-2 Structure (pipe, ditch, M.): Culver Receiving Sms m:Naw Creek Describe the industrial sastMties two. widwr the o ufall drainage area: Page 1.(2 r W V-ia1 I"a ac4M aU VMl a 3. Odor. Dceenbe any distinct odor two chlorwo odor, etc.): FI&Lv ' bssk colors (red, t mum. bhe, M.) reel old /. Clrrur. arouse, de mender which best desmbt and 5 is very cloudy. 1 2 3 S. Fkatiag Solids: Chome the m=ber which best stmmrates dimhuge, whem I is no solids and 5 is the it 2 3 (i.e„ smells atrmgly of oil, weak ty of the Nsrhuge, where 1 is clear 5 the statues of ❑ovint aelids in de red with nos esS solids: 5 6 Suspended solids: Cbwso the number - bw deuribw dw aroamt of suspeaded wilds itsthe stormwatm disehargq whew l is oo wlids ard5 extrerrcly muddy: 1 2 3 d 3 7. latlue any fam in de aomw B. isNereweB shaea in the torn 9. is these evidmeo oftrmke or M Other ObNoa lodicdsm of: Liu and describe O Yes O No. 1.7 OYes ONo. seanfs117 OYes ONo. Now: Lew chsray, high w11A. wd/or IM presma of fam. oB shee , areradem/depoaltkm may be tediotive of poliumal exposure. 'Flues cadltkm w-11(umber IavdtlPtiw. swu.zslsaumreowumu Page 2 of i EM Storinwater Discharge Outfall (SDO) Qualitative Monitoring Report sorpW amfia*war dtrfn P+mre costnapaoisy,eaorl.6owai.;riowe,w�,liawarm,damed Mdes namwer-ors Permit No.: N/C( / /, ( ( /, ( / orCcmIiioteofCovenge No.: N(041/0/3/0/016/3 / Facility Nam= Industrial Conmerions and Solutiom/ABE County: Onoee Phone No. 919,563,5561 Importer: Jeff Garlock Dan of inspeai • Timm mflarpasi Total Evers Psxipitatim(mchnh 013� All permits ¢quire {mutative monitoring to be performed during a -.e s mble storm "erL" A "measarabk norm toot" is s ssonn mrot ti a routs imam actual discharge Gorr tm permuttod site wtfall. Tor previous m...bk seam event most have ban a lost 72 hats prior. Tm 72�how sumo interval does no, apply if six, peromnee is attic to daaucot that a Shona monval is repnemstive for loml room everts timing the sampling period, and she pemmum obtains approval form the kcal DEMLR Regioml ORa. By this signature, I calify (bat ads repots iyaavmte and pine to that bass dm%knowkdgw (signature of c g bigoee) 1. Oatfall Dealptlom: Omfall No. SDO3 Sma,wm(pipr,ditrk=.): C.Nnn R.Mng Stream:Nsw Cook Desermbe ins industrial amivhits that ram within tba mafall drainage soot: truck 1 trailer parking.putote,,.„ aR outside Age 1 of2 sauu;tr®smrowmrnmu fY-- 7,1¢ 2. Color. Deembe the cola ofthe discharge min basic mbn (ma brown. 1,17 etc.) rqt Our (fight medimq dark) as descriptors: 3. Odor: Desrnbe arty dwivn odpn that tba discharge mar have (fact smcKi cwngly of oil. wok chlaineada,m): C Clarity: Ch tmomnberyY4bwduulbntb..IaltYoftmdia�nge,whaal bckar and 5 is very cloodr: / ' V2 3 4 5 i Finalists SWkb: Choon the numb" which ben deunbo the amount efflmting solids in the stmmwater diuhatgq whom 1 is w solids and 5 is the surface covered with flooring solids: Ir\1J/ 2 3 4 3 6. Sospeada guests; Choore �Irc Dumber which beat deaambn she amaat of smpohd solids in thessormwat"discharge,wham1iswsolidsand5is=t,u lymuddy. s . lt' 2 3 4 5J 7. D torn any form h tm n vmmwater disrbarp? O Yes 10 No- g. 1s then sm oil shun in the stormaaur discharge? OYm 4(N.. 9. 4shen evtlerec of esmsNe err depmisbn ache outfill7 OYm p1 No. IQ OtM OMlom Indkaton of Ffw,.aar PWlntlan: 13st and desctib. %�. — Nara: Lew e4rity, hlgm sW1A. andlor tba Preaexe W foam, A sheen, er erodeddepodtlon may ba Ind"Ove of pelbtanr espmun. Thee condlgsm wa,roat forth" laverolgatlom, aw14x1L ta,.�rs raovmts Page 2 of2 gek+ Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report - FocgaNasd awpging ow tA4/b,n, plane wft hoed//dryrc.floc/rbwUdivirhNrmpyminaaFbi6mmrcN nPdenwmvarengry Pnmit No.: N/CJ / / / / / ( / aCdtifialeofCovenge No.: NKY010/3/9/0/.6113 / Facility Nana: Indwhial Connections and Solutions / ABB Cousty: Orono Phooc No. 919-563-5561 Iespoms:. JcffGcrlock Wteoflomcaim /r' /sJ Time of Inspection, Total " Evt Precipitation (ircM): h � • L All Foods, require guslitsew monitoring to be performed during a "measumble, atom event" A "m csmmble mare evmt" is a exam evens them, nsdb in an ad" discharge onto the permitted sitc cusfall. The previous menmable term treat muss hive been at lead 72 hoed prim. The 72Lwr ram irmval don oat apply if she pweina is able to document end a sharer ireerval is reprtaeearive In, local dorm mend during We sampling period, sod the tome a obtaim approval hom rh local DEMLR Regional Office. By this sigaom, I esdify can dtia "post is acanee" and damlese to the bed ofory knowledge: (Signature ofpemince or 1. Outran Description: Omfd2 No. SDOd Snsatvre(pipe, ditch, etc.): Ditch Renewing Sunun:Haw Creek Describe the lodmuial sesivitia dw occer within the deal drainage asa: Page i of 2 sa+aus t...=atmowumn ol- /tic r/L 2 Color: Describe de color ofsbe ischdge using bask colon (red, brow, blue, ea.) and the (fight, medium dark) as dnctipt 3. Odor. Desc+3e any diathtn odes the discharge nsay Wve (i.u,smcib atrmgly of oil, weak chlorine odor, de.): l Clan?: Cbuwe de named and 5 is very cloudy: 1 S. Floating Solids: Choose the normwata discharge, wtae 1 is on r 1 6. Suspended Solids: Choose the stmmwater discharge, where 1 is where 1 is clear 3 4 5 :r which bat describes dre et"uul afBaeskg solids in the ex! 5 is the wrote covered with floating "lids: 2 3 4 5 Imo© 7. is (bar any foam in the atorem S. le them "all them in the rim 9. Is tints, evidence oferoaloo or Ill. OWer Obvipm Indicators of, IAdaeddderibe tich beat describes the asrosmt ofsespmded "lids in 5 is extremely muddy: 3 4 5 fie? O Ya O No. barge? oYn ON.. _ d the outfall7 OYet ON, Nate Lev clarity, high was, and/or the pressmen of fans, oat tins, aremdoNd"Wittlm may be Iedleardweetpellvamapaore. Tb modidomwarrsutfurtherlavesdgadan awu"s, s.aaaaxmowumis Page 2 of2 m+�rrwm aab. Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report forpddwwe pnffv, or tld.Jarw p/eaa Nrh hap Wdegx{whbuNdivisi amlpvnhl h d—oamad Permit No.: LVg /, /, / / ( / / or Cerdfras of Coverage No.: N/gG_/0/3/0/0/ 6/3 / Fa ility Neme'. Inmutrid Con and SOWIiM / Ann County. Orange Pharrc No, 919-563-5561 ImPamr: J.f[C.Iock Ducaflasorcd '' : - it & L Time oflmpemian: i 51213 Tool Evart Prtdpimfion(mcbm) 0- AB pamks require glWisdve vmimripg m be perfomd duivg •'mmsuable mxm event^ A'beamnhle norm event" is a storm event tart rondo in ao amnd dlwbarge from the pemdtted site wutfall. Tat pmvimn mesruabk nsrm event must Inve beco rt kat 72 horns prior. Toe 72.hour sward iaer,al does ram apply iftha pemliaee is able to doo mmt dst a rborwr interval is uprewmasive far kcal norm evenu during the smpling period sod Iota pamiaee obsim approved from the l cot DEMLR Regioml Offim. By thissipuma,iaaify�thdrepmtuaawasand ore' thabcwofmykaowledga: (Sigmtum ofPamame or D J 1. OutfaH Dowrlptlon: Out WI No. SDO-5 Sbucbue(pipe.diva,emJ: Cult' Rceewiag Stremn:New Crack Daanbe the mdusuid acdvida tad oau within the outf ll drainage art: Page I of2 aM1.NSWrorinrL e601/Snlr L Color. De.''br the ardor of dot: &mharj aung bask colors (.d, blown. blue. M.) W am (light, on d um, dark) a d.,00m. \. — 3. odor. Doarlc any distinct odors thY chlorine odor. am.): L Clarity: Cbomc the number w khb and 5 is very cloudy. 1 2 S. noadog Sol&: Cbocsa the Dumber I stomrwaur discbage, where 1 is no wlids and may have (is., smclb wrongly of oi4 war oftho&i b ga, abu 1uclear 5 rt desdiba the a oat dBmting wlids in the aaroo, wv.ad with Booting wlida: 1 2 3 3 5 6. Smpeoded SEHda: Chooa Ole number bat dcsr+iba the amount of suspadad wlW io the otaranvrter dirchage, wbm I is In solids 5 is extremely ruddy: 1 2 13 I 5 7. Istbdeanyfoamindc norvwattt d' g?oYa ONo._ a is tbcre ev A aheeo in the esormwaar 7 OYa O No. _ 9. btherc evidctla of ervrba ar depart albeoatfol? OYa ON.. IC Otba Obvlousladicaaaof Stor 4."Foautko: List and describe Nmr. law dh,ny, high roar. a.", the pmm dream, aH aba ererodoo/dvpoadeo may be Itrdintfredpanuaataapmare. Tarenndit[—warrantfarther Invad9'r"M swus¢I.v�ms.+aaclros Page 2 of 2 F � Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forn2da•av mfiflbq eur rAfr/ans pbve Wu hnps//degx�vlrbwUdivuimWeaapminwr4lWtesou«y npleretsemwam-gm Permit No.: N/U. ( / / / / / / or Cssti6cueofCovenge No.: N/CJGN/3/0/0/ 6/3 / Facility Nuns: Irdusuiil Connections and Solmiem /ABB CbuW. Orange Phone No. 919-363.5561 Isespecus, JcffG.Toa Date of Inspeci ore 2 Taneoflmpeaion: Total Event Precipitation (inches): • 3 (+ A l permit, require queliattve monitoring no be performed during a "measurable nomh cram" A ••m awrabk Norm wo r" is a corm evrnt then, remlt, in n adoal dbcharge from the permitted site autfdl. The previous measumble storm even) muss have been a kart 72 hoses prim. The 724mur storm imervil dam one apply if to permiva is able tu decrement this a shorty inasvil is eepmmmati a far local rearm evtna during the sargrling period, and the pemimc, abt®m gnwovil frvm the local DEMLR R ional Othee. By this signature/, II a mify tat this report �u�secesses,�rJ�d�complde b Bw bee of my knowledge: (SlgamoeofP ignee) 1. Outill DescrWers: Orafill No. SDO.6 Sbucm,(pipe,dimh,ereJ: Culvert Rectiving Stream:Haw Crcc Daenbe the bdunriil activities Out omar within the oumill drainage ares: tmdma duclua. transformers. drivewava outside mram finetal) Page 1 of 2 M-242, We fled aaOlaalr i// -6, `/9 3. Color. Decribe the Color ,[the diachug ,ihhg basic colon (red, brown, blue, deJ end tint night, neediness, derk) u d= i ' ✓1.� 4 r -d��t/�/�tg� 3. Odor: Describe amy ll Me the, the disc urge y have (i.e., cmellr arvrrglY of al, week rLbrim dor, m): Le, C Garlry. Choose the number which best describes the clarity ofthe discharge, where 16 clear and 5 is very clody. 1,'_ I V 1 4 5 S. Fbaoftg SvlWs: Choose the number which best describes the assmma offsetting solid, in the vormwner discharge, where i is onsolid, and 5 in the with B surf. covered wioating solids: 1 12 J 3 4 5 6. Smpevdd Soads: Choose the number which best desmhbes the arvwvt afsuspmded mhds in the stomweter discharge. where 1 is as solids and 5 is extremely muddy: U 2 3 4 5 7. 1, them sny fwtu in the nomwu Idinlorge. Oyes /R No. w 6 Is these:oB sheen in the stmmwner direlaga? Oven �) No.) 9. b there evidmm of row ar depodtwn w the owbll? O Yes q No. 10. Other Obvious lddlcatan of weer Palf deem: /` Ustethmribe naz Nate: Lew c4rlty, hlgb wlWy wdbr lbe prneaee offwm, oar aheee, or erttdoddepaslWa may De ladlwtiva of p ossomo eaparars. Them codidnm warren farther lavatgathm. 5wLLN2.lum5Maw1/aha Page 2 af2 oil" Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report fo,,ea m+waldiq ores jbna, plemm Mao hopsl/de4^cim'/sbwUdireiw/smrrg, incdlm6rewoed vpdneewmwarergm Permit No.: N/c/ /, /, /, / / / / or CcmfoamofCovenge No.: N/C/OI0/7/0/0/ 6/3 / Facility Name,. Industrial Comecrions and Sohnieus / ABB Cowry: Orm w Phone No. 919-563-5561 Inspector: RffGcTlmk Dam of Inspection: / 75me of Inspection: - 13 fatal Event precipitation (holm): 0,3 All permits require qualitative monitoring to be performed during a"measurable morn evme A"mnwrabk Your not" ise Yuan event that results in as scrud disclusur from the persdned rim omfd1. The previous memorable mum event awes have been, at lest 72 hours prior. The T24our steam imenel flocs not apply ifthe perminee is able to document Mat a theater imm,nd is represemeriw for local storm evnm daring the sampling petted, and the permeate aNdns approval burn the local DENILR Relposol ORoe. BY this signature, I certify ilmtthis repm i� m andpomplete to the best of m y knowledge: L��(S4.m of Permi s/ ) 1. Cretan De criptim: Osd'sil No. SDO-7 Smxwn(pipe. dieck cte): RoCkYIPmcdDiWh Receiving Smnm:Haw Creak Describe the industrial activities that oases within she oo0dldrainag, ate: seeking mrodernmrs, , W AST transfer sees Page 1 of 2 6w1434 ta®em.etwemen 17 `s, 1 Cobr. Descrbethe coma af0ediscbvge a�wgbesic colour (red. brown. bloc, ate.) and tint (light, medium. dark) a dacriPtore 3. Oder. Desatibe entry distinct odor Met the discharge may hew (i.e.,amdb strongly ofo0, weak chlmim, odor, ens.): 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 i. clear and 5 is wry cloudy: 1 2 3 4 5 5. Fkadng Solis: Choose the tnunber which best describes the amount of Bating wilds in the mrmwmter discharge, where i is w solids and 5 is the suffice covered with floating solids: ' I I 2 3 4 5 6. Suspended Beach: Chowe /the meaher which bees deunbes the emwnt ofampnded solids in the mmmweta discharge, where I is solids sod 5 is extremely middy. 2 3 4 5 7. is then soy foam in the mormwaur diwhsge7 O Yea �No. S. k Mere an o0 sheen in the mormwasu r discharge? OYa ko. 9, bthennidmce oferosbu ordepositiouY the omfill? OYes No. 10. Other ObNam Wheaton of SAsor/}�tY,ea PoButbo: Us, and describe / `v „W Near: I.ow clarity, high solkh, mad/or she present. of foam, an she a, or erosloddepnOke may bt Indleative of polmaM rap u re. Them csadniew wanmat hither InvssLpaeu. SwLLtQ,Wsvl�e<0i0UID11 Page 2 of 2