Loading...
HomeMy WebLinkAboutNCG030063_MONITORING INFO_20190920T STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DOC TYPE ❑ HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ j q "1 D / a YYYYMMDD Industrial Connections & Solutions LLC 6801 Industrial Drive Mebane, North Carolina 27302 USA CERTIFIED MAIL 7018 0360 0001 0020 0246 September 13, 2019 NC DEQ / Division of Water Resources Attention: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 BUSINESS AREA Industrial Solutions FROM Natalie L. Stennis, MS, FE PHONE DIRECT 919-563-7521 MOBILE DIRECT 336-554-4140 E-MAIL Natatie.stennis®us.abb.com RF(,F-I\IED SEP 2 0 2019 CENTFWL FILES DWR SECTION Re: NPDES Stormwater Permit Coverage Renewal CDC #NCG030063 Industrial Connections & Solutions LLC — Stormwater General Permit NCG030000 Dear Sir or Madam: Per our NPDES Stormwater Permit NCG030000, Industrial Connections & Solutions LLC collected the required benchmark samples from our facility outfalls on August 24, 2019. The following documents are enclosed: I. Stormwater Discharge Monitoring Report 2 2"d Copy of Discharge Monitoring Report 3. Lab Results from Sampling (Meritech, Inc.) 4. Qualitative Monitoring Reports (SDOs) — Blue Ridge Geological Services, Inc. In accordance with our NPDES Stormwater Permit, Industrial Connections & Solutions LLC is notifying the Division of Energy, Mineral, and Land Resources (DEMLR) that the sample results of all outfalls were within the benchmark values indicated in the permit. Outfalls SDO-1 & SDO-7 at the time of sampling only had minor flow and/or puddles resulting in only metals and oil and grease samples collected at these locations. We will continue to conduct monthly sampling while looking for solutions to these benchmark exceedances. If you have any questions about this report, please contact me at (919) 563-7521. Sincerely, Natalie L. Stennis, MS, FE Lead HSE&S Specialist Attachments Industrial Solutions 6901 Industrial dive Mebane, NC 27302 USA .wabb.com WE r 1 Stormwater Discharge Monitoring; Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted September 11, 2019 CERTIFICATE OF COVERAGE NO. NCG03 0 0 6 3 FACILITY NAME Industrial Connections & Solutions LLC COUNTY Orange PERSON COLLECTING SAMPLES Jeff Garlock LABORATORY Mentech, Inc Lab Cert. If 165 Comments on sample collection or analysis: Measurable Rainfall Event Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or Q Monthly' month DISCHARGING TO CLASS ❑ORW 0HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24hour rainfall amount, Inches' Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics Benchmarks _ - 100 mg/L or 50 mg/L4 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 SDO-1 08/24/19 0.08 - 6.83 0.008 <0.010 0.057 <5 - SDO-2 08124/19 0.08 5 7.06 0.009 <0.010 0.035 <5 - SDO-3 08/24/19 0.08 <3.4 7.21 0.008 <0.010 0.049 <5 - SD0-4 - - - - - - - <5 - SDO-5 08/24/19 0.08 7 7.41 0.007 <0.010 0.042 <5 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. ' For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 m Stormwater Discharge Monitoring; Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted September 11, 2019 CERTIFICATE OF COVERAGE NO. NCG03 0 0 6 3 FACILITY NAME Industrial Connections & Solutions LLC COUNTY orange PERSON COLLECTING SAMPLES Jeff Garlock LABORATORY Merltech, Inc Lab Cert. JJ 165 Comments on sample collection or analysis: Measurable Rainfall Event Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June Q July -Dec or Q Monthly' month DISCHARGING TO CLASS ❑ORW HQW []Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks - - 100 mg/L or 50 mg/L4 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 SDO-6 08/24/19 0.08 25 6.48 <0.002 <0.010 0.017 <5 - SDO-7 08/24/19 0.08 - 6.71 j 0.006 1 <0.010 j <0.010 i <5 - ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. S Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:ll/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 1 of 3 --_� -- - - - -- � - __ __ ._ _.. - - — " — T i �-- -- - - -- -- - - __._. Y--. _._ __. _. .. -- — -- -_..__ � -. .. _.. ---- _Y— - ---� r _. ___ � 1 '.r __ - _ _ __ _._.- _ � 1 - .. . An - .. .,, - _ _ _ _ - =' � it. � �. .� ♦.w r _ it r_ . (1 � p !�• , . .. -J4 r. ' � I - _ . - . � � � � Y `r .� . ' _ _ _ .. '. t. 14: Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Dominic A. Pitocco, Jr. Name (Print name) Plant Manager Title (Print title) Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfali No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches3 New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code - 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tfer 2, or tier 3 responses. See General Permit text. Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 i l � l.� .. � . FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES E] NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES Q NO ❑ REGIONAL OFFICE CONTACT NAME: Thad Valentine Mail an oriainal coov of this DMR, including all "No Discharae" reports, within 30 days of receipt of the lab results (or at end of monitoring period_ in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalVes for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of //,p Date Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 L` �J i J ^_ C J � � — J � -• �� ..� i �l � fv Meritech, Inc. Environmental Laboratory Laboratory Certification No.165 Page 1 Contact: Natalie L. Stennis Report Date: 9/6/2019 Client: ABB-Industrial Conn & Sol 6801 Industrial Dr. Project: GE/ABB Mebane, NC 27302 Date Sample Rcvd: 8/26/2019 Meritech Work Order# 08261904 Sample: SDO.1Grab 8/24/19 7:50 parameters Copper, total Results lts Analysis Date 0.008 mg/L 8/30/19 Analyst ED Reporting Limit 0.002 mg/L Method EPA 200.7 Lead, total <0.010 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Zinc, total 0.057 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Meritech Work Order # O8261905 Sample: SDO-2 Grab 8/24/19 8:25 Parameters Results Analysis Date Analyst Reporting Limit Method Total Suspended Solids 5 mg/L 8/27/19 BF 2.5 mg/L SM 2540 D Copper, total 0.009 mg/L 8/30/19 ED 0.002 mg/L EPA 200.7 Lead, total <0.010 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Zinc, total 0.035 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Oil & Grease (SGT/HEM) <5 mg/L 8/27/19 BF 5 mg/L EPA 1664 B Meritech Work Order # 08261906 Sample: SDO-3 Grab 8/24/19 8:15 Parameters Total Suspended Solids Results <3.4 mg/L Analysis Date 8/27/19 Analy3S BF Reporting 3.4 Limit mg/L Method SM 2540 D Copper, total 0.008 mg/L 8/30/19 ED 0.002 mg/L EPA 200.7 Lead, total <0.010 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Zinc, total 0.049 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Oil & Grease (SGT/HEM) <5 mg/L 8/27/19 BF 5 mg/L EPA 1664 B Meritech Work Order # 08261907 Sample: SDO-5 Grab 8/24/19 8:00 Parameters Total Suspended Solids Results 7 mg/L Analysis Date 8/27/19 Analys BF Reporting 2.5 Limit mg/L Method SM 2540 D Copper, total 0.007 mg/L 8/30/19 ED 0.002 mg/L EPA 200.7 Lead, total <0.010 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Zinc, total 0.042 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Oil & Grease (SGT/HEM) <5 mg/L 8/27/19 BF 5 mg/L EPA 1664 B 642 Tamco Road, Reidsville, North Carolina 27320 tel.(336)342-4748 fax.(336)342.1522 .'n)' .�� i ._t � � "i' � , �,. 1, i �:� � � .. i � � �� , , � t .' .. Meritech, Inc. Environmental Laboratory Laboratory Certification No.165 Contact: Natalie L Stennis Client: ABB-Industrial Conn & Sol 6801 Industrial Dr. Mebane, NC 27302 Meritech Work Order # 08261908 Sample: SDO-6 Grab Parameters Results Analysis Date Analyst Page 2 Report Date: 9/6/2019 Project: GE/ABB Date Sample Rcvd: 8/26/2019 8/24/19 7:40 .,,rMa u• 1� Total Suspended Solids 25 mg/L 8/27/19 BF 2.5 mg/L SM 2540 D Copper, total <0.002 mg/L 8/30/19 ED 0.002 mg/L EPA 200.7 Lead, total <0.010 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Zinc, total 0.017 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Oil & Grease (SGT/HEM) <5 mg/L 8/27/19 BF 5 mg/L EPA 1664 B Metitech Work Order# 08261909 Sample: SDO-7Grab 8/24/19 7:45 Copper, total 0.006 mg/L 8/30/19 ED 0.002 mg/L EPA 200.7 Lead, total <0.010 mg/L 8/30/19 ED 0.010 mg/L EPA 2003 Zinc, total <0.010 mg/L 8/30/19 ED 0.010 mg/L EPA 200.7 Oil & Grease (SGT/HEM) 7 mg/L 8/27/19 BF 5 mg/L EPA 1664 B I hereby certify that] have reviewed and approve these data. . Se6 ,y H (]��_ Laboratory Representative 642 Tamco Road, Reidsville, North Carolina 27320 tel.(336)342-4748 fax.(336)342.1522 1 � � �mror Chain of Custody Record (COC) NPDES#: Client:_ABB- IndustrialConn and Sol Phone:_207-376-6368 Address: 6801 Industrial Drive Fax: 919-563-7224 Mebane, NC 27302 Email:_ natalie.rtennnipis@us.abb.com Project:_ G elif P P.O.#: _ Natalie L. Stennis ?.rrneAroeeds rime - Attention: ' RUSH workk nes prior approval. How would you like your report sent? Circle all that app y: Email I St lOda s)iQaKs ZzHr s (prefe red), Fax, Mail MERITECH INC. 1 ENVIRONMENTAL LABORATORIES " 642 Tamco Rd. Phone: 336-342-4748 Reidsville NC 27320 Fax: 336-342-1522 Email: info@meritech-labs.com www.meritech-labs.com Sample Location and r ID # Sampling Dates & Times Person Taking Sample(Slgn/Print): J t Aa o Lab aM Us m� Start End comp? Grab? #of Cont. Test Re reo� \ "llNp„„g Ice? �jpK CIjOK? Date Time Date Time SDO-1 Ol2{ hi ��% G Ir; Total Cu, Pb, Zn;4"lgd SDO-2 76 �zM B dS' G 3 TSS; Total Cu, Pb, Zn; Oil and Grease (HEM) 0 �I � � -"` i SDO-3 72.1 8 � G 3 TSS; Total Cu, Pb, Zn; Oil and Grease (HEM) x���. �� , ,Wj �fjU/��•' l"-'q 3. a - �•±� {y�� J��n�. - �'� SDO-S r], 4 p 0 G 3 TSS; Total Cu, Pb, Zn; Oil and Grease (HEM) Uw f ,v SDO-6 G, 2 n 7 0 G 3 c✓ TSS; Total Cu, Pb, Zn; Oil and Grease (HEM) O b itn , „, £: WHEN, r HEN, SDO-7 6.111 S G 1� , Total Cu, Pb, Zn; Oil and Grease (HEM) £ •1''s Method of ""• Dechlorination <0.5 m of Ammonia, Cyanide, Phenol and TKN samples must be done in the field prior to preservation.'•' ^Tempereture Upuu Shipment:UPS Compiisnor`# Fed Ex Are these results for regulatory purposes? Yes No ❑ Re rt results in: mg/L mg/ g ug/L Hand Delivery Relinquished by: 44a + � L)� � � Received Dx Time: ;/ 6 Other ReII + e _ Received by D te: 1 Time: Relinquished by: Date: Time: rued by (y- t : rme: _ September 3, 2019 Ms. Natalie Stennis Industrial Connections & Solutions LLC / ABB 6801 Industrial Drive Mebane, North Carolina 27302 Subject: Report of Stormwater Inspection and Sampling - August 2019 Industrial Connections & Solutions / ABB 6801 Industrial Drive, Mebane, North Carolina Dear Ms. Stennis As authorized by acceptance of our proposal dated September 2016 and your requests to continue sampling, Blue Ridge Geological Services, Inc. (Blue Ridge) personnel performed additional environmental services at the subject site. The work was performed in general accordance with the Stormwater Pollution Prevention Plan (SWPPP) prepared for the subject site as well as the requirements of NCDEQ NPDES General Permit. On August 24, 2019 Blue Ridge personnel performed a stormwater inspection and sampling event at the subject site during a measureable rainfall event. Rainfall data was obtained from a nearby weather station. According to the website, the area in the vicinity of the subject site received approximately 0.08 inches of rain during the storm event. Blue Ridge personnel observed the stormwater discharge at outfalls SDO-1 through SDO-7 and completed stormwater discharge outfall (SDO) qualitative monitoring report forms for each of the outfalls. The SDO forms are attached. The pH of the samples was measured in the field using an Oakton pH meter and recorded on the SDO forms. No environmental issues were observed at the outfalls during this inspection. Field personnel collected samples from each of the stormwater outfalls, placed the samples into labeled containers, completed a chain of custody (COC) form, and submitted the samples and COC form to Meritech personnel. Since there was only minor flow and/or puddles at Outfalls SDO-1 and SDO-7, we only collected sample bottles for metals analysis (SDO-1 and SDO-7) and oil and grease (SDO-7) at these locations. This inspection report and the SDO forms should be placed in the SWPP Plan or a file on site and they do not need to be submitted to the NCDEQ. We will attempt to perform the next stormwater inspection/sampling event at the site before September 30, 2019. We appreciate the opportunity to continue to assist you on this project. Please contact the undersigned at if you have any questions regarding this report or if you need additional assistance. Sincerely, Jeffrey L. Gerlock, L.G. Attachments — SDO Report Forms Blue Ridge Geological Services, Inc. • 7356 Belmont Drive, Trinity, NC 27370 " Phone: 336-382-6849 raaw>mnv Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report ForguNmp mp/Ivrg me title fore, pleme vide htlpsJfdcq.ec.goNa6aWdivirimts/cnerp-mineral-Imdrraaoa✓ np&,%crmwarm-gpo Permit No.: N/C(. / / /, / / / / or CerGficateofCovmge No.: N/C/G/0/3/0/0/ 6(3 / Facility Name: Industrial Comtectiom and Solutions / ABB Cowry: _mange Pbone No. _919.563-5561 Inspector. _JeRGerlock Dateoflospection: r Timeofhniroction: Tool Event Precipitation (inches): D e D a Ali permits require qualitative monitoring to be performed during a tmasmable Bann event" A "measurable our n event" is a semen mat that results in m actual discharge from the permitted site wtfall. The previous measurable storm event most base been, Ines 72 horn prim. The 72-hour atom interval does not apply if the pemittee is able to document that a shover imesval is representative for local stem evens timing the sampling period, and the paminee obtains approval foam the local DEMLR Lt�pmud Office. By this aigm uon% I unify that this report is sauna and compete to the best of Imowl my edge: (Sigmnne of Peminoo ) 1. Oathll Description: OutfaB No. SDOA Structure (pipe, ditch, ee.): Diteh below eulven Recoiving StrumuRBw Creek Describe the mdutrial achvioes that ones within the outfae drainage sues: decks. AST. mnsli mee mrkina Page 1 oft S W U�NI, ran medliel oaq I/1011 P3 2. Colon Describe the 99�o1oorr of the (light, mem, diudauyas dc"ptmy_ colon (red, brown, him, etc.) and tint 3. Odor: Describe any distinct odors that the discharge may ban (i.e.. smells strongly of oil, weals chlorine odor, etc.): --1710t e. Clarity: Choose the number beat describes the clarity of den discharge, wbese 1 isclear and 5 isvery cloudy: 1 2 3 4 5 5. Floating Solkb: Choose the number which best describes the amount of floating solids in the aeumwater discharge, where 1 is co solids aM 5 is the surface covered with floating solids: 0 2 3 e 5 4 Suspended Solids: Choose the number which beat describes the amount of suspended solids in the stmmuaw discharge, where 1 is no solids and 5 is extremely muddy. 0 2 3 a 5 7. Is there any foam in the mercurous discharge? o Yes, $ No. re 8. Is thean oil sbeen in the summonses discharge? OYes / So- 9. h there evidence of erosion or deposidon or the outfall? O Yes $ No. 10. Other Obvious Indicators /ooffsSturmwater Pollution; List and describe Nora: law clarity, high solids, and/or the prerena offenses, on shoo, or mcniloddeposition may be Indicative of pollutant exposure. These conditions warrant further investigation. SWLLiQ, met coifed MLIUMI Page 2 cf2 PC rmawnnel a"^rr Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report F>gvidaas on/llwi, me dhfora Per M ft WpuJ/degnc.goer/sbwtldisisims/eovgy mvmr4` -_-.-' Pemdt No.: N/G ( /, / / / / / or CertifmneofCoverage No.: N/CIG/0/3/0/0/,6/3 / Facility Name: Industrial Connections and Solubms / Alto County: Omen Pham No. 919-563-5561 Inspector: leffae lock Dateofbopwrion: 2 _/ Time of inspection: Total Event Pteeipimtim Coach=): (.: ua All permits regtdre qualimtiw monitoring to be performed during a'Liaaumble steno event." A "measurable Dorm "at" is a storm event that results in an setoal discharge fiom the permitted site outfall. The previous memorable stern erect most have ben at least 72 home prior. The 724 mu swan intmai does not apply if the permittee is able to document that a shorter interval is representative for local rum evens during the sampling period, and the permomm obuiw approve] from the local DEMI.R Regional Office. By this sismune, lcertify thatthisreport is woman, and complete tonow the best ofmy kledge: <Z f Ad,(Sigwture of ig 1. Omtfall Description: say � �f(+�//��� Outfall No. SDO-2 Structure (pipe, diorb, em): Culvert w �{ Receiving Stmm:Bew Creek Describe: the bdusufal 2MM64 that occur within the autfall drainage am: 2. Cabal. (fight medium, the alol of the discharge wing basic comm (red, brown, bloc, cm) and tint 3. Odor: Describe my distinct odors that the discharge my hew (i.e.. smells ctmogly ofoit week chlorine odor. etc.): �421— I. Clarity: Choose the number which beet describes the claniry of the discharge, where 1 is clear and 5 is wry cloudy. 1 f2 J 3 4 5 S. Flosting Solids: Choose the number rwwhich best describes the amount offlwting solids in the «mnwater dischage, where I is no solids seal 5 is the surface covered with Boating solids: 0 2 3 4 5 6. Snspemded Solids: Charen the number which beat describes the amount of suspcidded solids in the emrmrseur discharge, where 1 is no solids and 5 is cannot ly muddy. 2 3 4 5 7. is them my foam in the sUmo w ocer discharge? Q Yes xNo. S. Is there an ail shes o in the stamwater discharge? GYes XNo. 9. Is them evidence aferaabn ordepodthm at the oudali? QYa j6 No. 10. Other ObAow Indicators of rmwater Pollutions: /� Listanddeaeribe ear` None: Law elulty, high made, and/or the presence of foam, as sbeem, or eredeo/deposiden nary be bdcadw of polludm exposure. Them anditbos warrant further immudgatbo. Page 1 of 2 sWU-x4 LiumeAfhYo6el/xalr SWm.Li, I�gmWifiedaaaVS011 Page 2 of2 IC rmmwmu"w gorse Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report FwgaNmaonfillM oe, shisfam.p/eme Wsu bnpsl/deq.oc.gov/abmWdivWmVen .mw=Warldrtmw vpdes•wmmwehs-Spa Permit No.: N/C/, / / / 1. / / / or CenificnnufCoverage No.: N/C(G/0/3/0/0/, 61.3 / Facility Name: Industrial Connections and Solution / ADS County: Orsnse Phon No, 919-563-5561 Inspector: feffGerbek Dawoflnspection: Time oflmpection: /�sr 9 Total Event Precipitation (inches$ ✓ • O AD permits require gsdimtiw monitoring to be performed during a'measumble sort, evens" A "measurable Nam event" is a Norm event that results in an actual discharge from the permitted site outfall. The previous meammble soon event mart haw ban at least 72 hours prior. The 72-ham wren mirrod does not apply if the pemiince is able to document that a shmrer interval is representative for loml room events during the sampling pmiod, and the permittee obtains approval from the local DEMLR Regional OB-os. __.. By this signstme, II certify that ^/this report is amaate and complete o the beat ofmy knowledge: C; / `�tz� (Sigaatme ofpcsau is=) 1. On" Description: Outfall No. SDO-3 Snocmre (pipe, dioh, eoJ: Culvert Receiving Sm, m:HawC Describe the industrial activities that omen within the outfall drainage ones: truck /toiler pgfking mmolcm ASToutside stonge pN- 2 i 2. Color-, Describe the color of the di-"usin bash orlon (red, brown, b , eoJ and tint (bgh4 medism4 dark) as descriptors: i 4f �'f" 3. Odor. Describe any distinct odors that the discharge may hew (i.e., smells strongly ofod, weak chlorine odor, ear.): jel" ii— 4. Clarity: Choose the number which beat describes the clarity ofthe discharge, where l iselear end 5 is wry cloudy: to 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stommater discharge, wham 1 is nooy/p�)lids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the numbcr which best describes the amount of suspended solids in the roommates discharge, whee l isTp solids and 5 is extremely muddy: n 2 3 4 5 7. 1s them any foam in the stmmwater discharge? G Yes XNo. S. Is there an all sheen in the aoomwrter discharge? OYm XNo. 9. Is them evidence oferoden ar deposition at the outfall? GYe Iy No. 10. Other Obvbm Indicator, of Saww water pollution: s List and describe Note: Low clarity, high wlMs, and/or the presemx of foam, 00 sheen, or erorloddspoddou may be Indicative of pollutant exposure. These condition warrant further fovestlgatioo. Page I of 2 awU-N; iad moe�rof oso Vlata swum; t.o,maJwa OawVteit Page 2 of2 .. � � �i' o„aex.aar soon Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Fmgaidaae.fWvgaa Ab/orw.,ek. vlrh hops!/degac.gov/aboWd,--red—V mineral lsoclaunes/ mpdesstormwarer-gpa Permit No.: M/C/ / / / / / / / or CertirmcofCovcsap No.: N/C/GN/310/0/,6/3 / Faeilhy Name: Industrial Connections and Solutions / ABB County: Ounce Phone No. 919-563-5561 Inspector. kffGerlock �+ Dam mf ofIn Inspection: .2 / Time oflmpection: O c Total Ew nt Precipitation (mcha): V . ✓ fT Ali permits require qualitative monitoring to be pallommd during a'tmasunblostmtm event" A an curable norm event^ is a snorer event that results in an actual discharge from the pertnined site outfnll. The penioa measurable storm event mat have been at least 72 hour prior. The 72-hour storm interval does not apply ifthe pc mh¢m is able to docunuat tint a shorter interval is reprrxnudw for local scum tan during the sampling period, and the permittee obtains approval floor the local DEMLR Regional OfimeOdme. Bythis signature, I eeai^^fy that this report is accurate and camW lete tothe hurt ofmy knowledge: 4 41( (Shgnstae of Pemhi ) 1. Out&U Description: Outfdl No. SDO-4 Sttucoue (pipe, ditch, em): Ditch Receiving Sueam:Haw Creek Describe the udustrid activities Nat oceurwabin the mdall dnimge ern: mridne. ASTL tores. mML outside emraee 2. Color. Describe the color of the discharge using basic colon (red, brown, blue, etc.) and tint (light memimr, dart) m descriptors: 3. odor: Des chlorine odor. =): 4. Clarity: Choose the number which bat desc and 5 is very cloudy: 1 2 3 S. Floating Solids: Choose the number which storvtwater discharge. when 1 is no solids and 5 is t of oil, weak the clarity of the discharge, where 1 is clear 14 5 covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Chroae the number which det ribes the omr the sto mwanr discharge, where 1 is no solids and 5 is a ly muddy: 1 2 3 4 5 7. Is there any foam in the stortmvaw di O Ya O No. L Is there an oil than in it.awmwarer d' 7 OYes O Na 9. Is there evmk= of erosion or depe itign at the mtfall7 O Yes ONO 10. Other Obvlomladleafis. f term .Potation: List and describe of suspended solid in Note: f.aw dartry, high wlWa, and/or the presence of foam, all aheea, or erodoo/depoddeu may be Indleative of pollataot esyosurc Thm modidem warnot furtber Ines igatioa. Page 102 Page 2 of2 swu.vr, w scooters oanvmt s Be 4m.'reacl Q+aftry Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Fuee."ance oa%d/lag or rhb/ona pkuse vYY huprl/dear.guar/abam/divbim✓emp-mioenLlm6rnmm/ opdcratoawata -spa Permit No.: N/d / / / / /, / / or Cadficate of Coverage No.: NlOgIO/3/0/0/ 6/3 / Facility Name: Industrial Connections and Solutions / ABB County: Orange Phone No. 919-563.3561 hupeetu,: Pert Gedoek C Data oflnspection:— ,f1 It a� Timeoflmpection: _ O Qy Total Event precipitation (inches):y d All permits require qualitative monitoring as be performed during a 1lmsmahle atom eves." A "mwnrsble Whom evmN is a storm evem that results in am actual discharge from the permitted site oufail. The poevio a tncenuable atom event must have been at least 72 noun prior. The 724our amen interval does not apply if the permitter is able to document that a shorter interval is representative for local storm events during the sampling period, and the permimee obtains approval fion the local DEMLR Ragiuma Offeee. By this signature, i certify that this report is accurate and complete b the been ofmry k.M=I . (Sigaame of r egvee) 1. outran Description: Outfall No, SD0.5 Structure (pipe, ditch, etc.,. Receiving Smwu,Haw Creek Describe the ladiustrial activities dust occur within the outrali drainage area: emkim trash cotrna= outside Bumse, Page I oft 6wUxq nu mosna osnvmn pa- 2 ¢i 2. Color: Describe the color of (light medium, dark) m deseripmrs: _ ruing basic colon (red, brown, blue, arc.) and tint 3. Oder. Describe aoydi that the dishem ge my how (i.e., sells strongly ofoi4 weak chlorine odor, cut. 4. Clarity: Choose the F.bcst dcamhes the clarity of the discharge, where 1 isclear ad 5 is wry cloudy: 3 4 5 S. Floating Sofids: Choose the number which best describes the amount of floating solids in the stmmwater discharge, where 1 is Diu's and 5 is she surface covered with Boating solids: 2 3 4 5 6. Suspended Solids: Chcom the number which best describes the amount of suspended solids in the smrmwater discharge, where I is no solids and 5 is mtnmely muddy. C, 2 3 4 5,/ 7. Is these any foam ion the stormw// ate discharge? O Yea a No. S. Is den an o11 shams in the stor mustw discharge'. Oyes XNa. 9. la then evidence of erasion or deposition at the eutfall7 O YcsX No. 10. Other Obvious Indicator, of Storsmvater Pollution: list and describe Note: Low clarity, high "IWs, and/or the presence of foam, o0 shem, or masieddepodtio s may be ledlcativeofpollutamespetam TbesecoodldomwarraotNrtherinvadgation. SWLL74L lva m ul l 016C 1M1 e Page 2 of2 I omamm„wa owns Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Fagutilur. onlfllin oat Ab jams. pear vhu h[yelldegac.eov/abut/dlvuiov✓erc�aimaFlrmd.rtsoacey npdesarmvwtler.®a Permit No.: N/C/, / / / / / / / wCarti6raaofCcwrag,No.: N1/GCilO/3/0/0/.6/3 / Facility Name: Industrial Connection cad Solari /ABB Cowry: Onnee Plots No. 919-363-5561 Inspceta: lefrCsedock Danofhupecuon: Tinoofiupection, 0, Total Event precipitation (inches): t� a All permits require qualitative monitoring to be performed during a "measurable storm event.^ A •mnsunble storm Mar is a sum event that cestdts in an anal discharge from the permitted site outfkll. The previom measurable storm event most love been at least 72 hours prior. The 72- our storm interval does not apply if the permimee is able On document that a Matter interval is repmseandw for local roan evema during the sampling period, and the pmmittee obnms approval firm the local DEMLR Re 'owl Offoe. By this signature. I certify that this r/epool moJec/raft and complete to the beat ofmy knowledge: (Signarum of Pen a esignee) 1. Oatfaa Description: OulfeR No. SDO-6 Structure (pipe, ditch, etc.): Culvert Receiving Slam: aw Crock Descrcbe the industrial activities that oars within the omfaR dnhage area: loading docks aamfmrmen dri ( I) /01�-0/1 4te 2. Color. Describe the color of tha discharge using basic colors (red, brown, blue, etc.) and tint (light, medium. dark) as descriptors: i / VM 3. Oda: Describe any distinct odors that tha discharge may hale (i.e.. smelts strongly ofoiL weak are chlorine odor, .): i ��L''3 e 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy. ���'''` /1 j 2 3 4 5 S. Floating Solids: Choose the vnumber which best describes the amount offl Mng solids in the smrmwater discharge, when 1 is no solids and 5 is the surface covered with floating solids: l0 2 3 4 5 6. Suspended Solids: Lboox Elie number which best describes the aauunt ofsuspended solids in the atamwata discharge, where i is on solids and 5 is extremely could), (��v//2 3 4 5, / 7. It them any foam in the atamwmer discharge? O Yes psV/No. a. Is then an OR sbaem in the sramvnter discharge? Oves la No. 9. Is then evidence of emioa er deposition a the outfell? O Y-,; p No. 10. Otber Obviom Indkston of Smrmwa[er POBotbm: ' List and describe Note: Low elarlty, high soBds. and/or that pnaeoceof fwo; oat shmq w ermlon/depodtbu maybe fodia+dw of pollutant expoaom. Theseeoodidoes warrant farther Investigation. Page 1 af2 nuu; W ®4ar<06eVran aWLL2e; � moanleaa6e1201r Page 2 af2 KC rmmwmnmr 9•wG� Stormwater Discharge OutfaU (SDO) Quatitative Monitoring Report For Vki. xm dibfona, pk. vsrr hare!/degxgov/oboes/divifim✓magy-m"vtca4laodaeuurce✓ vibes'atcrmwater-gpa Pecnit No.: N/d / ( ( ( / / / or Certificam of Coverage No.: N/C/GN/3/0/0/ 6/,3 / Facility Name: Industrial Connections and Solutions / ABB County: Oran¢e Phone No. 91M63-5561 Inspector: Jeff Caloc �sd Dateofinspection: �9 Time ofinapectiom Total Event Precipitation (nncha): L� • VO All pemrits require qualitative rnan u sing to be performed during a'Yaamrable smrm evens" A "Measurable storm event" b a storm event that results in an actual discharge from the pe an.md use ! oudiail. The previous awawuabk storm event must have been at kw 72 bows prim. The 724saur storm interval does nrat apply if the permittm is able to document that a shorter interval is representative for loud storm events Ruing the sampling period, ad the permhtee abmms oplmwd from the local DEMLR Regional Office. By this dlpMm+q 1 certify � Complete to the bear ofmy knowledge: (Signature of igrwe) 1. Outf u Oeserfptim: Outfdl No. SDO-7 Structure (pipe, ditch, etc): Rmkv/Pavd Ditch Rceeiving St eam:Naw Creek Describe the indusni.1 activities that incur within the ouVall drainage area: radfine, trwfonmene. sum, at AST transfer and Page 1 of2 2. Collor: Describe (ligbt, northemt dart) as ( m.) and tint 3. Odor: Describe my disGrct oche that the discharge my have (i.a., smells strongly of oil, week chlorine odor, etc):/�� 4. Clarity: Choose the number which best dam'bes the clarity of the diocharge, where 1 is clear and 5 is very cloudy: 0 2 3 4 5 S. Floating Solids: Choose the cumber which best deamba the amount offloeting solids in the smrmwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 6. Suspended Solids: Choose the number which but describes the amount of suspended solids in the stormwater discharge, where 1 is no solids end 5 is extremely muddy: 0 2 3 4 5 7. Is there any fosm in the stormwatm discharge? O Yu W No. g. Is diem an oil sheen in the ummw iter discharge? OYes XNo. 9. Is there evidence oferesim w deposition at the outfall? OYu &No. 10. Otber Obvbus Indicators �of Stcrsawater Pollution: List and describe 7Vc�li.C/ None: haw clarity, high weds, swelter the presence attests, ail abeen, ar erodowtdepositiun may be Instigative of pollutant exposure, Those, conditions warrant further investigation. Sa'WaaLteeoLreraaalRall Page 2 of2