Loading...
HomeMy WebLinkAbout20171170 Ver 1_USACE Correspondence_20200401 Carpenter,Kristi From: Steffens, Thomas A CIV USARMY CESAW (USA) <Thomas.A.Steffens@usace.army.mil> Sent: Wednesday, April 01, 2020 11:00 AM To: Lentine, Sarah F;Ward, Garcy; Lane, Stephen Cc: Beasley, Jason B;Johnson, Jay B Subject: [External] RE: B-5620 Beaufort Bridge#30 over Campbell Creek External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to report.spam@nc.gov The USACE has reviewed your request for relief from the in-water work moratorium to allow in-water work to continue until April 14, 2020 on Bridge No. 30 over Campbell Creek in Beaufort County. After consultation with the appropriate agencies,the Corps finds the request for moratorium relief to have merit. As such,you may consider this transmission to be official approval to proceed with the activities as described in your request of 25 March 2020. Be advised that if the proposed project and plans change from what was originally requested,you are required to contact the Corps to review the new plans and proposal. Thomas A Steffens Regulatory Project Manager US Army Corps of Engineers 2407 West 5th Street Washington, NC 27889 (910)-251-4615 From: Lentine, Sarah F<sflentine@ncdot.gov> Sent:Tuesday, March 31, 2020 8:04 PM To:Ward, Garcy<garcy.ward@ncdenr.gov>; Steffens,Thomas A CIV USARMY CESAW (USA) <Thomas.A.Steffens@usace.army.mil> Cc: Beasley,Jason B<jbbeasley@ncdot.gov>;Johnson,Jay B<jbjohnson@ncdot.gov> Subject: [Non-DoD Source] Fwd: B-5620 Beaufort Bridge#30 over Campbell Creek Garcy&Tom, Now that we have received authorization from CAMA,we need your authorization to allow in water work up until April 14, 2020. Please let us know as soon as possible. Thanks, Sarah F. Lentine, PE Resident Engineer Resident Engineer's Office- Pitt NC Department of Transportation 252 439 2970 office ***New Number*** sflentine@ncdot.gov i 1710 North Memorial Drive P. O. Box 1587 Greenville, NC 27835-1587 NC State Seal Gold Email From: Lentine, Sarah F<sflentine@ncdot.gov> Sent:Tuesday, March 31, 2020 7:42 PM To: Beasley,Jason B; Lane, Heather C Subject: Fwd: B-5620 Beaufort Bridge#30 over Campbell Creek FYI great news Get Outlook for iOS From: Lane, Stephen <stephen.lane@ncdenr.gov> Sent:Tuesday, March 31, 2020 5:36:24 PM To: Lentine, Sarah F<sflentine@ncdot.gov> Cc: Brittingham, Cathy<cathy.brittingham@ncdenr.Rov>; Capehart, Cadmus<ccapehart@ncdot.gov>; Harrison,James A <James.Harrison@ncdenr.gov>;Johnson,Jay B<ibiohnson@ncdot.gov>; Tom Steffens (Thomas.A.Steffens@usace.army.mil) <Thomas.A.Steffens@usace.army.mil>; Swain, William T<wtswain@ncdot.gov>; Ward, Garcy<garcy.ward@ncdenr.gov> Subject: RE: B-5620 Beaufort Bridge#30 over Campbell Creek Hi Sarah, The DCM has reviewed your request for relief from the in-water work moratorium to allow in-water work to continue until April 14, 2020 at the NCDOT's project to replace Bridge No. 30 over Campbell Creek in Beaufort County . In accordance with conditions of the CAMA Major Permit issued for this project, and after consideration of your request and in consultation with the appropriate fisheries resource agencies, DCM has determined that a one-time relaxation of the in-water work moratorium is appropriate at this time. This email shall serve as official notification that in-water work as proposed in the attached email thread, may continue up until April 14, 2020. I have coordinated with the USACE and NCDWR representatives working on this project, and they are generally in agreement with the moratorium relief as requested. However, please note that the USACE and NCDWR also have moratorium conditions in their permits and NCDOT will need to wait receive the formal authorizations from them for relief from the moratorium, prior to beginning any in-water work during the proposed relief period. Please let us know If we may be of any further assistance with this project. Sincerely, Stephen Lane Coastal Management Representative From: Lentine, Sarah F<sflentine@ncdot.gov> Sent: Wednesday, March 25, 2020 4:14 PM To: Lane, Stephen <stephen.lane@ncdenr.gov> Cc: Capehart, Cadmus<ccapehart@ncdot.gov>;Johnson,Jay B<Lbiohnson@ncdot.gov> Subject: B-5620 Beaufort Bridge#30 over Campbell Creek Importance: High 2 Stephen, We would like your consideration in postponing the start of the moratorium on permit 3-18 on the subject project by 14 days to April 14, 2020. Attached is the Contractors planned schedule, the concrete pours are scheduled close together,but they can use high early strength to achieve the needed strength. To drive the interior bent piles for stage II of the bridge they intend on cutting holes through the existing bridge deck to drive them. Then demolishing the rest of the bridge after the moratorium begins. Thanks, Sarah F. Lentine,PE Resident Engineer Resident Engineer's Office - Pitt NC Department of Transportation 252 439 2970 office ***New Number*** sfientine@ncdot.gov 1710 North Memorial Drive P. O. Box 1587 Greenville,NC 27835-1587 11 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties. 3