Loading...
HomeMy WebLinkAbout20200478 Ver 1_Catawba Notification Form_20200413Strickland, Bev From: Greg Wells <greg@willisengineers.com> Sent: Monday, April 13, 2020 2:13 PM To: Perez, Douglas J Subject: [External] RE: 22928 Torrence Chapel Rd. Attachments: Catawba Notification Form.pdf • External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to nc. ov Doug, Thank you for following up on this so quickly. Attached is the executed Catawba Notification Form. Let me know if you have any questions or need additional information from us. G reg Greg J. Wells, PE, BCEE Willis Engineers 10700 Sikes Place, Suite 115 Charlotte, North Carolina 28277 704.377.9844 office 704.338.4662 direct 704.609.4036 cell LN 'I I I'l S N 0 1 N E E R S [will isengineers.coml From: Perez, Douglas J [mailto:doug.perez@ncdenr.gov] Sent: Monday, April 13, 2020 1:32 PM To: Greg Wells <greg@willisengineers.com> Cc: cwilson@ci.charlotte.nc.us; Johnson, Alan <alan.johnson@ncdenr.gov> Subject: 22928 Torrence Chapel Rd. Hello, I am emailing you today about your recent shoreline stabilization project application. One thing that I noticed was that it was missing the Catawba Riparian Buffer Notification Form. I have attached it to this email. If you could fill it out, sign it, and return it, it would be most appreciated. I noticed that there are several trees that will be saved, which is great, however if there are any within the 30' buffer that are 3" or greater diameter at shoulder height, they must also remain. Furthermore, if it is imperative that any trees of such size be removed in order for work to be accomplished, then trees must be planted within the buffer to replace the removed trees. If that is the case, then please let us know and I can provide you with further instructions. Sincerely, Doug Perez DWR DIvIA16n of Water ZC-LO rCtl Doug Perez- Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2162 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Project Nameladdress: Charlote Water Intake Shoreline Stabilize NC 28031 County: Mecklenburg awner: Joseah C. Print ikon, Chai reg J. Well Print 1� IV 22g28 Torrence Chapel Road, Cornelius ignature 5ignat The approval is far the purpose and design described in ,your application, impacts not indicated in the application is a violation of the Buffer RUIe. Site specific work should be provided in the application. [ 02H .0506 and 15A NCAC 02B .0243{8}] 15A NCAC Trees are not allowed to be removed from Zone 1 of the Buffer {within 30 ft of the full pond elevation}, unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243{5}] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 {6}] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are Limitation on size for decks. 115A NCAC 0213 .0243(4) and {6}] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [1.5A NCAC 02H .0502 and 15A NCAC 02B v0243 {4}, (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)j Acknowleafgement of IVotifrcatio» !, Joesph C. Wilson ,hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources {DWR}, is a violation and sub]ect to enforcement, Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan{s}and specification{s}, and other supporting materials. ,,