Loading...
HomeMy WebLinkAbout20200112 Ver 1_R-5740_Wetland Impact Summary Sheet_20200409WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Hand Existing Existing Permanent Temp. Excavation in Excavation Mechanized Clearing in Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In Non -Riparian in Clearing Non -Riparian in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands Wetlands in Wetlands Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1A 22+24 / 23+87 Hand Clearing, Excavation in Wetlands, Temp. Stream Impacts 0.007 0.05 0.004 28 1 B 24+46 / 25+39 Hand Clearing, Excavation in Wetlands 0.001 0.03 Temporary and Permanent Stream Impacts 0.002 0.01 14 31 2A 54+76 / 54+99 2B 54+91 / 55+00 Temporary Stream Impacts 0.002 15 3A 72+02 / 72+89 Hand Clearing and Excavation in Wetlands 0.01 0.02 3B 72+31 / 73+18 Hand Clearing in Wetlands 0.009 Hand Clearing, Excavation and Fill in Wetlands, Temporary and 0.02 0.02 0.06 0.04 0.008 51 14 4A 78+52 / 80+05 Permanent Stream Impacts Hand Clearing, Excavation and Fill in Wetlands, Temporary and 0.01 0.002 0.005 0.04 0.02 48 38 4B 79+39 / 80+05 Permanent Stream Impacts 4C 80+20 / 81+35 Hand Clearing in Wetlands, Excavation and Fill in Wetlands 0.03 0.008 0.04 Hand Clearing in Wetlands 0.08 4D 80+00 / 81+50 Hand Clearing, Excavation and Fill in Wetlands, Temporary Stream 0.02 0.04 0.15 0.04 0.01 44 15 5A 131+29 / 133+02 Impacts Hand Clearing, Excavation and Fill in Wetlands, Temporary Stream 0.02 0.04 0.12 0.03 0.005 51 9 5B 132+45 / 134+94 Impacts TOTALS: 0.100 0.128 0.564 0.152 0.059 208 150 Revised 3/31/05