Loading...
HomeMy WebLinkAbout20200046 Ver 1_More Info Received_20200410Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * r New Project r New Project with Existing ID r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) r Stream or Buffer Appeal Submittal Type:* Modifications New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Project Contact Information Name: Larry Thompson Vft is subrritting the information? Email Address:* Ihompson@ncdot.gov Project Information Existing ID #:* Existing Version:* 202000046 1 20170001(no dashes) Project Name: * Pipe 301 on SR 2608 (SF-120301) Is this a public transportation project?* r Yes r No Is this a DOT project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)?* r Yes r No f Unknown TIPM W13S#: 17BP.10. C.6 (Applies to DOT projects only) County (ies) * Cabarrus Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent 17BP10C6_Permit Package Wetland_20200409.pdf 1.17MB Only pdf or lqm files are accepted. Describe the attachments: Application modifications include changes to temporary impacts (dewatering) and differentiating between permanent bank stabilization and floodplain bench impacts. - Dewatering will be accomplished through staged construction vs. stream channel relocation. Culvert will be built in place and is not a precast structure. This will allow water to be diverted around barrel 1 when under construction and diverted into barrel 1 when barrel 2 is under construction. Impact Summary: - Permanent impacts due to construction of floodplain benches = 51 Linear Feet - Permanent impacts due to bank stabilization = 13 Feet * rJ By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form." Signature.* Submittal Date: Is filled in autorratically once subnitted.