Loading...
HomeMy WebLinkAbout20200429 Ver 1_More Info Received_20200413Strickland, Bev From: Terri Kindley <terrigkind ley@yahoo.com> Sent: Monday, April 13, 2020 10:50 AM To: Perez, Douglas J Subject: [External] Joe Fulk CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report. spam@nc.gov<mailto:report.spam(a)n, c.gov> Sent from my Whone CATAWBA RlPARIAN Bt,IFFER NOTtFI - TION FORM Project Name/addr+ess: /9'� /�•*d�e'w.a�av� �� ��y; /�?�cic%�,, `� Owner. � t�r. Prirrt cona�actorla� 0 1L. =� ; ( C�� . Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application�s a vioiation of the Buffer Rule.Site speci�c work should k�provided in the application.[15A NCAC OZH ASt�and i5A NCAC 02B.0243(8)] Trees are not allowed to be removed from Zone i of the Buffer(within 30 ft of the fuil pond eleva�tion),uniess approved.Exceptjon,those trees that are severely undermir�ed along the immediate st�orel�ne can be removed. Minimal shaping and slopir�along the immediate shoreline is allowed.[i5A NCAC 02B.0243(6�] Benching and gniding in tl�e buffer is not allowed.Excesstve djsturbance of ground torrer.[15A lVCAC 42B.t}243 (6�] Beaches,impervious patios,impervious walkway�,etc.are not alfowed in the buffer untess s�ratiy approved by the Dhrision. There are lim�n on size for decks.(15A NCAC 02B.0243(4}and(6j] - Work to be aonducted from land must indicate an aoce�s and indit�te any trees that are to be removed. The work corridor should be described.The approved access corridor shail be restored.Stagin�spoii,construdion materia(must be outside the buffer.(i5A NCAC 02M.0502 and i5A NCAC 028.0243(4j,(6),(8)] Stormwater canrwt be piped or chartneled f�or direct discharge to the take. All con�structed stormwater discharges must be aR the natural eiev�rtion a�d discharged prior to ernering the buf�er direcied as diffuse or sheet flow at non-erosive vebcities to the lake.[i5A NCAC 02B,Q243�SL(6}1 Acknow�edganent of NadJ+Toartlon 1, �o,E �r. �u t�� ,hereby state that 1 have been informed of the Catawba Riparian Buffer Rule. Any work oondc�cted In the buffer.not specificalfy stated in the applicat�on and approved by the Division of Water Resources(OWR},is a viotation a�d subject to enforcemer�Due diijgence wilt be taken such that the oonst�tion wUt be buiit within wbstarrtia!complianoe and intent of the 401 Water Quai'�ty Certification and euffer Rules,the approved plan(s)and spedfiration(s),and oti�er supportiing materials. Signature�o�wnerj: w Z------ Date: iV��3-Ze2�