HomeMy WebLinkAbout20021539 Ver 1_COMPLETE FILE_20020924MEMORANDUM
TO: John Dorney Regional Contact: Noelle Lutheran
Non-Discharge Branch WO Supervisor: R Shiver
Date:
SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS
Facility Name Hap Alexander County Pender
Project Number 02 1539 County2
Recvd From DCM Region Wilmington
Received Date 9/24/02 Recvd By Region
Project Type (8) slip commercial dock
Certificates Stream Stream Impacts (ft.)
Permit Wetland Wetland Wetland Stream Class Acres Feet ME
Type Type Impact Score Index Prim. Supp. Basin Req. Req.
TA-MA Waters O1' OO N F_ 18-87-10 SA F 30,624. 0.04 F- F__-F-
o7 Mitigation Wetland s
MitigationType Type Acres Feet
Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N
Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N
Is Mitigation required? 0 Y O N Recommendation: Q Issue 0 Issue/fond 0 Deny
Provided by Region: Latitude (ddmmss) Longitude (ddmmss)
Comments:
a 401 Certification is not required for this eject. This office has no objection to the project as
proDosed,,nrovided turbidity levels do not exceed 25 NTU's outside of the project area.
cc: Regional Office
Central Office Page Number 1
A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
September 23, 2002
ell
MEMORANDUM 15 3
TO: Mr. John R. Dorney
Division of Water Quality.
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: Hap Alexander
Project Location: 806 Roland Avenue, Surf City, NC
Proposed Project: To construct an eight (8) slip commercial dock.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
October 17, 2002. If you have any questions regarding the proposed project, please contact Jim Gregson at
910-395-3900. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are incorporated.
See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE
127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845
Phone: 910-395-3900\Fax: 910-350-2004 \ Internet: http://dcm2.enr. state. nc. us
An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \10% Post Consumer Paper
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
l._ APPLICANT'S NAME: Hap Alexander for Howard Batts / Sears Landing Project
2. LOCATION OF PROJECT SITE: 806 Roland Avenue (NC Highway 50/210) at Thomas' Tackle Shop, near the
Surf City Swing Bridge, adjacent to Topsail Sound, within the Town of Surf City, Pender County
Photo Index - 2000: 25-330 D8 1995: 25-313 C3 1989: 172-12 D-F 8
State Plane Coordinates - X: 2436904 Y: 251967 Rover File: S092020B
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 08/15/02 06/18/02
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received - 09/13/02
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Surf City
Land Classification From LUP - Limited Transition / Conservation
(B) AEC(s) Involved: EW PT
(C) Water Dependent: Yes
(D) Intended Use: Commercial
(E) Wastewater Treatment: Existing - Surf City Sewer
Planned - N/A
(F) Type of Structures: Existing - Tackle Shop, Bulkhead, Pier
Planned - Eight slip commercial dock
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION: [AREA]
T)RF.I)CTF1) FTT.T .Fly (1TNFR
(A) Vegetated Wetlands
(B) Non-Vegetated Wetlands 1,746 sq. ft.
(open water) incorporated
(C) Other
(high ground disturbance)
(D) Total Area Disturbed: 1,746 sq. ft.
(E) Primary Nursery Area: Yes
(F) Water Classification: SA Open: Yes
8. PROJECT SUMMARY: The applicant proposes to construct an eight (8) slip commercial dock.
Hap Alexander for Howard Batts / Sears Landing Project
Page Two
9. PROJECT DESCRIPTION:
The applicant's project is located at an existing commercial development known as Thomas' Seafood and Tackle
Shop. This property is located along the northwest side of the NC Highway 50/210 Swing Bridge crossing the
AIWW at Surf City, in Pender County. The entrance to the property is on the north.side of the causeway, just to the
east of Harbor Pointe Subdivision.
The Existing business is located on a 0.41 acre parcel of land situated along a small boat basin adjacent to a tributary
of Topsail Sound. This basin area is connected to the AIWW by a small channel which extends past the Harbor
Pointe development. Near the basin the channel makes a bend to the north and continues behind a series of dredge
spoil islands which separate the channel from the AIWW. The proposed dredging of a portion of this channel is the
subject of an earlier CAMA Major Permit Application by Homeco Builders, Inc. and is described in a Field
Investigation Report dated July 15, 2002. The property has approximately 179 feet of shoreline along the boat basin.
The property is bordered on the south by the community boat ramp at Harbor Pointe Subdivision and on the north
by an existing commercial ramp located at property currently owned by Homeco Builders, Inc.
Existing development at the project site includes: a one story, commercial, cinder block structure used currently as
a tackle, bait and seafood business; a parking lot; a concrete pad on the waterward side of the building, which
extends to an existing failing bulkhead; and a haphazard arrangement of docks and pilings primarily used for the
mooring of commercial fishing vessels. A CAMA General Permit was issued to Hap Alexander on August 1, 2002
for the reconfiguration of these docks into a floating dock. Based on the existing configuration of the docks and
pilings, it was determined that there was existing docking space for six vessels. As of the date of this Report, the
construction of the floating docks under this General Permit has not begun, however, much of the old dock structure
has been removed. A CAMA General Permit was also issued to authorize the replacement of a portion of the existing
failing bulkhead on the property.
The Town of Surf City Land Classification Map classifies the upland areas of the project site as Limited Transition,
however, the Land Use Plan includes all Areas of Environmental Concern , as well as spoil islands in the
Conservation class. The waters of the AIWW and Topsail Sound are Classified SA by the Division of Water Quality.
The area is designated as a Primary Nursery Area by the Division of Marine Fisheries and is open to the taking of
shellfish.
The applicant is proposing to increase the number of slips at the property by the construction of a floating dock
system, at which the applicant is proposing eight (8) slips. Including the structures authorized under the CAMA
General Permit, the entire structure would consist of a 6 feet wide by 102 feet long floating dock located directly
adjacent to the bulkhead. Near the southern property boundary, the dock would turn 90 degrees and extend into the
basin for approximately 110 feet. At the end of the structure the applicant is proposing a 6 feet wide by 26 feet long
finger pier. On the remaining portion of the dock the applicant is proposing three additional finger piers. Starting
at the eastern end of the main floating dock, these fingers would measure: 6 feet by 18 feet; 6 feet by 24 feet; and
6 feet by 16 feet, respectively. The finger piers would be spaced approximately 30 feet apart. Water depths at the
waterward end of the structure would average approximately -4 feet at mean low water (MLW). The docking
facility would provide leased slips as well provide temporary tie-up for patrons.
Hap Alexander for Howard Batts / Sears Landing Project
Page Three
10. ANTICIPATED IMPACTS:
Construction of the proposed floating docks would result in the incorporation of approximately 1,746 sq. ft. of public
trust area. Localized increases in turbidity can be expected during piling placement.
It should be noted that an application is currently in process for the adjacent properties to the north and south which
includes the construction of an additional ten (10) slips in the vicinity of this basin (See Harbour Pointe Field
investigation Report Revision, dated September 4, 2002. The cumulative effect of multiple docking facilities along
this shoreline could potentially impact the shellfish closure status of this body of water. The applicant and the
adjacent property owners have reached an agreement on separation distances from each ofthe proposed docks as well
as setbacks from the common areas of riparian access.
Submitted by: Jim Gregson Date: September 20, 2002 Office: Wilmington
Recommendations for State Permit - Hap Alexander for Howard Batts / Sears Landing Project
Construction of floating dock system could potentially provide more docking space than the eight (8) slips that the
applicant is proposing. Docking at the outside areas of the southern dock and northern finger pier could be discouraged by
not installing mooring devises in these areas and by the construction of handrails and/or the posting of signs. Conversations
with Shellfish Sanitation indicate that if adequate distances are not maintained between adjacent docking structures the slip
total may count cumulatively in making a closure recommendation. It appears that the applicant has reached an agreement
with the adjacent property owners in this respect (See attached dock location agreement signed by Jimmy Pierce on September
19, 2002 and by the President of Sunset Cove Development, Inc. on September 18, 2002.) If the proposes dock configuration
and slip numbers at this project, as well as at the adjacent Homeco Builders, Inc. project, do not result in a closure
recommendation by the Shellfish Sanitation Section, it is recommended that a permit issued with following conditions:
This permit authorizes only the docks, piers, and other structures and uses located in or over the
water that are expressly and specifically set forth in the permit application. No other structures,
whether floating or stationary, may become a permanent part of the structure without permit
modification. No non-water dependent uses of structures may be conducted on, in, or over public
trust waters without permit modification.
2. The permitted docking facility shall provide docking space for no more than eight (8) vessels. At
no time shall more than eight vessels be moored or located at the facility. This restriction shall apply
to all marine vessel types, including but not limited to motor boats, sailing vessels and personal
watercraft.
3. At no time shall vessels be moored at the facility in such a manner which would block or impede the
use of the existing community boat ramp located at the Harbor Pointe Subdivision.
4. No attempt will be made by the permittee to prevent the full and free use by the public of all
navigable waters at or adjacent to the authorized work.
5. The authorized structure and associated activity must not cause an unacceptable interference with
navigation.
6. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by
the U.S. Coast Guard, through regulations or otherwise, on authorized facilities.
7. In order to protect water quality, runoff from the construction must not visibly increase the amount
of suspended sediments in adjacent waters.
8. The permittee will maintain the authorized work in good condition and in conformance with the
terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons
the project without having the permit transferred to a third-parry.
Form DCM-M -1
APPLICATION
(To be completed by all applicants)
1. APPLICANT
a. Landowner:
Name Al fl -3*77-S o ?
Address-/?--'? S AAJS?5 -4-dW))jA [ ,Q 7
City S J P- F C i State j C
Zip 122::?J 4-T- Day Phone 3 7-'-'e-' C)S Z?
Fax
b. Authorized Agent:
Name L?l`tlo /l?r?_
Address PA g 35??
City ? '/G &- state -A-1c -
L-
Zip Day Phone*RqaS3E K
Fax 3128 /349179
c. Project name (if any) S6 WS 4411r-
NOM Permit will be issued in name of landowner(s), andlor
project ram.
b. City, town community or landmark
AJ?
c. Street address or secondary road number
p 6 Rol
_ _ A vL5.
d. Is proposed work within 'city limits or planning
jurisdiction? _V_ yes No
e. Name of body of w=roject (e.g, river,
creek, sound, bay) A-r
5 VWS l-4-N?nl rr-
3. DESCRIPTION AND PLANNED USE
. OF PROPOSED PROJECT
a. List all development activities you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities.
- D c2 5,A- 125
b. Is the proposed activity maintenance of an existing
project, new work, or both? P?QJR
c. Will the project be for public, private or commercial
use? ` 'r)MXL-?,C /A'L
d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If mores ace is needed, please attach
additional pages. space h3c-k
_!Q V15-LA-0 f *7J T /'-% I5 IM )n
_t S
Z. LOCATION OF PROPOSED
PROJECT
a. County VLV b8-VI
? Ire' 'i iJ" I?r
;r
COASTAL 'MAO AGEMENT
Revised 03195
- '
Form DCM-MP-1 lJ ' - ? 2002 ,
. J' .?
DIViS1QI? Or
COAS fai_ IV114N auEMENT
_ m. Describe existing wastewater treatment facilities.
4. LAND AND WATER PJ SLI(' S?-,y4F7Ce ? VJ
CHARACTERISTICS - S-0-12 F C 1 rZi
a. Size of entire tract ' ?? LZCCQS dry lard n.. Describe location and type of discharges to waters
of the state. (For example, surface runoff, sanitary
b. Size of individual lot(s) I ac S r? )RA d wastewater, industrial/commercial effluent, "wash
own" and residential discharges.)
c. Approximate elevation of tract above MHW or :5:04 FACg- jPj j/V aFF
NWL A Ye- . 3 . ?'? /}Sa? m )i- W
d. Soil type(s) and texture(s) of tract
SAM D
e. Vegetation on tract I.I?Z?L7)S
f.
ADDITIONAL INFORMATION
o. Describe existing drinking water sup?I s?rce
PO RL .
C ?
-rVLVAI
e
Man-made features now on tract C
g. What is the CAMA Land Use Plan land
classification of the site? (con:uu the local land use pzmq
- Conservation Transitional
V Developed Community
Rural Other.
h. How is the tract zoned by local government?
- C-
i. Is the proposed roject consistent with the applicable
zoning? V- Yes No
(Atmch zoning cbrnvlionce oenifi=-, if -Ppa-bw
j. Has a professional archaeological assesm ent been
done for the tract? Yes ? No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or a igible property?
Yes or
No
1. Are there wetlands on the site? ?Yes _ No
Coastal (marsh) ? Other
If yes, has a delineation been conducted? VeS
(Mach doa -=don, if available) /
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims tide
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 71.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies"will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
Revised 03/35
Form D04-W_4
STRUCT.U.RES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application which relate to
this proposed project.
a. Dock(s) pd/or Pier(s)
(1) Commercial Community _ Private
(2) Number DAI F
(3) Length V '
(4) Width 6.
(5) Finger Piers ? Yes No
(i) Number C&Ls V" J
(ii) Length Q'
(iii) Width
(6) Platform(s) _V Yes No
(i) Number _ & IT-
(ii) Length -357/
(iii) Width 6'
(7) Number of slips proposed _ 53
(8) Proximity of structure to adjacent riparian
propertyIines 1.5le
(9) Width of water body 49401")
?-
(10) Water depth at waterward end of pier at
MLW or NWL 6r
b. Boathouse (including covered lifts) JJ a >>L5,
(1) Commercial Private
(2) Length
(3) Width
c. Groin (e.g. wood, sheetpile, etc.)
(1) Number
(2) Length(s)
d. Breakwater (e.g. wood, sheetpile, etc.)0 01? 6
(1) Length
(2) Average distance from MHW, NWL or
wetlands
(3) Maximum distance beyond MHW, NWL or
wetlands
f
7 7, y ..
r r' /
DIVISION Or
COASTAL MANAGEMENT
e. Mooring buoys &a lob
(1) Commercial -Community - Private
(2) Number
(3) Description of buoy
(Color, inscription, size, anchor, etc.)
(4)
(5) Width of water body
Distance buoy(s) to be placed beyond
shoreline
f. Mooring cture (boatli moor pings etc.)
(1) Commercial ,-Community - Private
(2) Number
(3)
(4) Length
Widthc?
g. Other (Give conplete description)
Applic3ut )(r Project
e-Al -D Z'
Date
Revised 03195
I
Form DCM-N&-1
site. Include- highway or secondary road (SR)
numbers, landmarks, and the like.
• A Stormwater Certification, if one is necessary.
6. CERTIFICATION AND PERMISSION
TO ENTER ON LAND
• A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name
Address
Phone
Name
Address
Phone
Name
Address
Phone
• A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
/,J ,?I • ?t? ?,2 ?//fib z
'Ah. 3-' T
O
• A check for t made payable to the Department of
Environment, Health, and Natural Resources.
(DEHNR) to cover the costs of processing the
application.
A signed AEC hazard notice for projects in
oceanfront and inlet areas.
I understand that any permit issued in response to this
application will allow only the development described in
the application. The project will be subject to conditions
and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North CaroIina's
approved Coastal. Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project-
I further certify that the information provided in this
application is truthful to the best of my knowledge.
f
This is the day of
Print Name A
Signature
weer o set wrized.t
Please indicate attachments pertaining to your proposed
project.
DCM MT -2 Excavation and Fill Information
DCM MP-3 Upland Development
'?DCM MP-4 Structures Information
- DCM MP -5 Bridges and Culverts
_. DCM MP-6 Marina Development
• A statement of compliance with the N.C. NOTE. Please sign and date each atrachment iri; the
Environmental Policy Act (N.C.G.S. 113A - 1 to space provided at the bottom of ra- f i7n. \
10) If the project involves the expenditure of publics
funds or use of public land's, attach a statement documenting compliance with the North Carolina \t
Environmental Policy Act.
Revised 03/95
C
ilk-
DIVISION! OF
CORD, SAL P%4A,'q `GEM`{?T
I
i
rd
-Tj = --- 9
r,----? ----,
C d
d
QA
€? \ ,?
I, CHARLES FRctir~ RI rC PROFESSIONAL LAND
SURVEYOR, DO HEREBY CERTIFY THAT I HAVE SURVEYED THE PROPERTY AS SHOWN HEREON IN
ACCORDANCE WITH THE STANDARDS OF PRACTICE
FOR LAND SURVEYING IN NORTH CAROLINA, THAT THE RATIO OF PRECISION AS CALCULAT BY 4 N.C,S.R. 158
LATITUDES AND DEPARTURES IS: ~ 1538 N~C•S'R'
Z
~y"' S30'44'0 " ~ p n .Z
135.00 4•~• -
G• CHANNEL OF TOPSAIL SOUND
~ ~ ~ :'1a ~ ~ ~ ~ o
~ ~ w oD l
~ vi THIS IS TO CERTIFY THAT THE SUBJECT PROPERTY 4' Wp~RWpY
IS LOCATED IN FLOOD ZONE "VE" EL=11 WHICH W
IS A SPECIAL FLOOD HAZARD AREA AS J J DETERMINED BY THE DEPARTMENT OF HOUSING AND ~ ~ BRIDGE ~pGOpSSp~ IN
URBAN DEVELOPMENT, COMMUNITY PANEL NUMBER ° 0
370186 0005E JANUARY 22 1998 J PROPOSED DOCK & PILINGS N
O ~ VICINITY SKETCH
J ~ i J N NOT TO SCALE
EIR - - •
- I. i -a - • '<<
_ T ~ \
a -
EXISTING DOCKS TO BE REMOVED ~ o •
i
• ~ I
I I I' ~9 G',~
-I i~ • APP - - R0X41ATE MEAN f~
HIGN WATER UNE - - _
_ _ C NNEL OF _8
~ wloaD Doacs ALONG wES,<ERN APPRO)OMATE MEAN HIGH WA1ER UN , T SAIL SOUN ti
AS PER MAP "HOM E ECO BUILDERS, INC"
JOHN L. PIERCE, P.L.S. ,k1NE 4 2002 EIR ~ ~ ' _ I -
I ~4
S2T16' i I 08 W ~~i 2o.os l~ I- `6
~ - - EI
I I_ •
m
~ ~ ~ U+ °o. i ,A
' ~ ~ APPRO%IMATE MEAN RICH WATER LINE
C~~ ` 26, ~ ~ B' ~ R , d~b~. ti,. ti. O 2
• i 0'
•
~ S23'56'04" ois ~ ~ ~~~~'r..>, n~ "i'a'
W PROPOSED DOCK ; ~ & PILINGS ~ 30.52' IR N
1
I 6' ~ 1 N~uN~,• S32'03 55 W ° i e F ~N~~ o ~ F IN~•
' 17.58
;N ~
~ SO 6'
EIR ~ 6' CONC ETE k
FETAL WALL ~I ~ ~ • 6+ ~ ry c 3 J J I 3e
I LIGHT I
POST i ~
¦ ~0
ON k "
I WELL ~ 0
N ' ~ • ~ wA ~ OW OR FORMERLY E' ~ ~ : z
BOLLARD ~ POWER • ~ ~wELL : ~ ,6a,~5 . • N( NOW OR FORMERLY
D.B. 1130, P. 129 HART HARBOR POINT R i EVISED
ON E I fit? ~I `f 5 ~ ~ . M.B. 33, P. 65
~ . ~ . .
,p. Comwanl ~R~
I ~ N tV ~ ~ j / . r~ •04
frl ti 9.9 / i j'/i i
N .7 ~ I O m ;,~d
p a ONE STORY CONCRETE q o. ON CONCRETE SLAB ~ ~ ,rl
v N N I ~ i,
r____ _ _ _ _ ~
1 ip
d ~ / ~/~7---EDGE OF ASPHALT
t ~ ~ ~ '
qST 6,32' ~ ~,~SPH C' ~%1i-' f/ /i EIP S31'04'24"E 184.72' of ~ GR y~i I ~ , , , C i
R EI R~~ 128. A 64 1 /j ,
N 0,4 ~ ~ , 3 1 40-,W 14:96 - ~ I~tRi;; i , N31'0213"W 175.75' EIR N31'07'38"W 56.56' EIR
R/W ~i,'';,
MoD ~ ~ (~MAt~H~i / ~ ~ MA~~ /Y : ; , FlRE
r of C -.-rr-- ~ ~I ~ 00 ~ ~ i f~ 77,7~~'~' ~i' ' ~i HYDRANT ~i~;:/
i ; ~i ~i i ~ 'i i~ ,
EDGE OFASPH i, ~ ~~~'/i N ~ i ~ i,./; ALT i~ !i~ ~ ~ ,
~ j i ~ ~i~'. ANY APPROXIMATE WETLAND D
EPK 'i, ~ ~ ~ i ~ ~i APPROXIMATE MEA ELINEATION OR N HIGH WATER LINE SHOWN IS NOT CERTIFlED AND IS SUBJECT TO BOTH
SMN N31'15'41"W 134.43' - - - - - _ _ N31ti4'05'W 698.04' EPK REVIEW & FINAL APPROVAL BY CAMA AND
EPK c/~ wmwECTwN av - - _ _ _ THE U.S. ARMY CORPS OF ENGINEERS.
• so/~o N. _ _ _ C. HIGHWAY 50 & 210 - NoRtNwts't END OF BRIDGE OVER
100' R W ASPHAL - I I ( T PUBLIC) INTRACOASTAL WATERWAY
I
i D C-2
R I /W ~ I ZONING SFT ACKS Q~.~
FRONT = _ - 25 LEROY 0. BATTS, Jr, &
RAN REAR - 20' JAMES HOWARD BATTS CC =CONTROL CORNER SIDE = 7.5' ECM =EXISTING CONCRETE MONUMENT
pp~L IMIN~Y pL ~r EIR = EXISTING I (FOUND) RON ROD (FOUND)
NOS' ~Op p~COpn ~11'ION, R F R N. S EIP =EXISTING IRON PIPE (FOUND
CONI/~Y~1NC~ Op D.B. 36 EMN = EXIS ) 2, P. 15 T1NG MAGNETIC NAIL (FOUND) D.B. 362, P. 126 EPK =EXISTING PARKER-KALON NAIL (FOUND)
5~~5 I j D.B. 362, P, 507 ERRS =EXISTING RAILROAD SPIKE (FOUND)
D.B. 367, P. 619 SCM =SET CONCRETE MONUMENT (CONTROL CORNER D.B. 367, P, 621 SIP =SET IRON PIPE )
I D.B. 587, P, 184 SIR =SET IRON ROD
D.B. 655, P. 255 SMN =SET MAGNETIC NAIL (CONTROL CORNER D.B. 675, P. 163 SPK =SET PARK - )
ER KALON NAIL (CONTROL CORNER) D.B. 870, P. 071 MBL =MINIMUM BUILDING LINE
i D.B. 1130, P, 129 R/W =RIGHT OF WAY D.B. 1786, P, 271 ~ =CENTERLINE
I SEP 13 20~
GRAPHIC SCALE
LAND SURV - BOUNDARY & PHYSICAL SURV EYING CONVENTIONA EY & PF L do GLOBAL POSITIONING SYSTEMS, M_ RVEY & PROPOSED DOCKS FOR IVISION 4F ~ D o ~s ~ 80
I LAND PLANNING & COMPU Is -''tiilP~~+~~'y"~' y' TER MAPPING , RE _ a,~.=„~r~t4n~°!(1':~! TAT ETA ~?nIT Tl A T TAL MANAGEMENT 120 COAS
~ T1 A T LTV A 1~Tnnr~
1I 11 \ A inl~ LL t`il 202 WARLICK STREET ?1QT FOP hLLkj5- Ut'llJf`1 SALES. Ul! t1L1'j1LAlN 11L' n
P.O. 80X 1570 ONVEYAN~-- ( IN FEET )
JACKSONVILLE, N.C. 28541-1570 TELEPHONE: 1 inch = 30 ft.
(910) 455-0877 ACRE TRACT ON N.C. HIGHWA
FACSIMILE:(910) 455-9033 C. HIGHWAY 50 & 210 pa, 'Q DATE: JUNE 11, 2002
E-MAIL: riggsland@bizec.rr.com TOPSAIL TOWNSHIP, PENDER COUNTY R COUNT DRAWN BY: J, Nt~L-MS Y, NORTH CAROLINA
FIELD BOOK: IND PAGE: 7
COMPUTER: WS PRO - 6-07 0 K, w
PROJECT NUMBER: 02-06-07