Loading...
HomeMy WebLinkAbout20021538 Ver 1_COMPLETE FILE_20020923MEMORANDUM TO: John Dorney Regional Contact: Noelle Lutheran Non-Discharge Branch WQ Supervisor: B Shiver Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Joseph R. Lewis County New Hanover Project Number 02 1538 County2 Recvd From APP Region Wilmington Received Date 9/23/02 Recvd By Region Project Type road access Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet - Type Type Impact Score Index Prim. Supp. Basin Req. 'Req. 14 OTH FT-ON F- 18-87-(31) SA ? 30,624. 0.33 ?- ¦ Mitigation Wetland" MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? O Y ON Did you request more info? O Y ON Have Project Changes/Conditions Been Discussed With Applicant? O Y O N Is Mitigation required? O Y O N Recommendation: OQ Issue O Issue/Cond O Deny Provided by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: , This office has no objection to the project as proposed provided sedimentation and erosion control measures are installed and maintained. The 401 Certification was issued on 11 /07/02, cc: Regional Office Central Office Page Number 1 Triage Check List Date: °? ZS bZ Project Name: L e%% >„ DWQ#: OZ 153A County: tJety kAc*-*-4er To: ? ARO Mike Parker ? FRO Ken Averitte ? MRO Mike Parker ? RRO Steve Mitchell ? WaRO ?WiRO ? WSRO Deborah Sawyer J Jennifer Frye ?ke l?lo?a? From: Telephone : (919) 133 - 3S +I °' The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ? Stream length impacted Stream determination y ? ? Wetland determination and distance to blue-line surface waters on USFW topo maps Minimization/avoidanceissues WhH cloes ik- ne.ed 1-0 be SV' w:de? ? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill ? Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Xis the application consistent with pre-application meetings? ?" ? Cumulative impact concern Comments: 002ASO " CHARLIE HOLLIS Regulatory Consultant 138 Green Forest Drive Wilmington, NC 28409 Phone/FAX 910-392-6833 September 22, 2002 Project: Nationwide Permit No. 14 and 401 Certification Access Road for J.R. Lewis, St. Joseph Street Carolina Beach, New Hanover County, N.C. Mr. John Dorney Water Quality Certification Program N.C. Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 Dear Mr. Dorney: .,?FCOPY SEP z 3 jf i '?cc0Up.,.. I am enclosing on behalf of Mr. Joseph R. Lewis, 7 copies of a Pre-Construction Notification for the use of Nationwide Permit 14 by Mr.Lewis for the construction of an access road from St. Joseph Street approximately 300 feet westward across wetlands to his additional high-ground property. This application is also submitted in response to Corps of Engineers Action ID: 200200945 dated 10 July 2002 which addressed Mr. Lewis' unauthorized placement of 0.063 acres of fill into the alignment of this proposed road. Enclosed is my check No. 3402 in the amount of $200 for the WQC Application fee. Please contact me if you have questions or need additional information. 7r , c Charlie o is Encl: PCN Check Office Use Only: USACE Action ID No. No. Form Version October 2001 If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. 7section k all of the approval(s) requested for this project: 404 Permit ? ection 10 Permit [401 1 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: J ?-{ 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information , 1. Owner/Applicant Information Name: ?o-s,c-pt1 (:mow Cs ,Mailing.Address:_-13- (4 'S'-r- tss?c,?l ,??,r_ . Telephone Number: 10 -q5Er - Fax Number: E-mail Address: -- 2. Agent Information (A signed and dated copy of thid"Agent Authorization letter must be attached if the Agent has sign tory authori or the owner/applicant.) Name: tfAt'?t,t E o L? t S Company Affiliation: Mailing Address:. ... 111 $ ':onest. Die tVEr - 1.1.. , . Telephone Number: 9t) - E-mail Address: eti.. {n. Fax Number:- %p c.o wt Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans! If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project:_ Coss 20 N?D 1=CVQ U -.R, R, 2. T.I.P. Project Number or State Project Number (NCDOT Only):_ ,s 3. Property Identification Number (Tax PIN): 4. Location County: /?lEw ?Qotlol/S2 Nearest Town: Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): i./. -.-- - e , Z8-y za- 9 5. Site coordinates, if available (UTM or Lat/Long): (Note - If project is linear, such as a road or utility line, attach a sheet !that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Leto 7. Property size (acres): ox 8. Nearest body of water (stream/river/sound/ocean/lake): VAe wr 1.INA 13&)g cA River Basin:- W (Note - this must be one of North Carolina's seventeen designated m4ior river basins. River Basin map is available at http://h2o.enr state nc us/admin/maus Page 6 of 12 The 10. Describe the purpose of the proposed work: Pie ov (1?E 14 c c E-.55 QO A-D 1= 2 o vn ?-r. ---ue o fl t! CMnsTr- ? n --. . _ .- N - 1. - • • - - - -- 11. List the type of equipment to be used to construct the project: nv cc k ?, ?o raD?zS_, G Y;zA PesYZS -12. Describe the land use in the vicinity of this project:"/ z> 4e7-m t% c_ IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: ONE M-nG/Pog7-6D VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 L Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** ?wp * i.ict each i--+ - - --- wrW »??•? w=u -1-11y Luny-ary unpacts. impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at hht p://www fema ems. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Z , S?9c Total area of wetland impact .proposed:__ O 3 *e- 2. Stream Impacts, including all intermittent and perennial streams IA?onlF Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) List each impact s e aratel d 'd p y an entity temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabiont , etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint folboth the original and relocated streams must be included. k R Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at waves uses eov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com- www.maoqu cr com etc.). Cumulative impacts (linear distance in feet) to all streams on site: Page 8 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. l..,JL cacn unpact separately and idenary temporary impacts. impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. DAN E- 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be, created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: „ Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. - Nr &n qr1n7'z Q cc s i8 L4 ?72dy i4?1 y?- VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9of12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment' are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at htti)://h2o.enr.state.nc.us/ncwetiands/stn-neide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much infonnation as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. c? /2?"a?lr?/?S!//1?G GJ NI?S W/L e T?? G UiVOrsmte&-an 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be.notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. , For additional information regarding the application process for the NCWRP, check the 14CWRP website at httn://h2o.enr,state.nc us/nUdfdex htm. If use of the NCWRP is proposed, please check the appropriate box on 'page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ? No [a/`? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA- fina approval letter.. Yes ? No Ea' X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts 4n. Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Ta -Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Require s), or other. (please identify )? Yes ? No If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* s nImact ape feet Multiplier Required Mitigation l 3 2 1.5 Total c.uac i genus out Su feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Page 11 of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface 'waters and wetlands downstream from the property. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated frgqm the proposed project, or available capacity of the subject facility. /Vo I vy t?+?r?uy- PLwiys &T tS d7`rtE- XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? P19MY1 R c.Ly, , 7q em qz.c.. Ae&, vo= wa7L&N as Yes ED' No ? WAs PR5Vc0vsc..y F'iL4_--0CibTK-e.: 2.75'3 & D Ropy WILL- XIV. Other Circumstances (Optional): TIS Fre OPc-S It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applican gent's Signature (Agent's signature is valid only if authorization letter l c>, ZUa z-- the applicant is provided.) Page 12 of 12 TO WHOM IT MAY CONCERN: This is to authorize Charlie Hollis to act in.my (our) behalf in preparing documents, drawings, forms, and other items as may be necessary to secure Federal and/or state permits for the project identified below. Project Name: ../Q:5...?`'-O..'.4 . ......... .(2 ..(??t s ................... Location:..", 5 t D? o? ??- tm ..............-r-Dt1- 13i? N lk r- , 574- sp .......................... ............ Signe ........ Date:'.. .q.-.?`?....v..? .......................... I N Ci C A N ? yo 1 100 g 1 .00 z c m o ?s C4 z w W U 00 A e) O 'as <V iA r) ? di ? M M rj M 0 Kd M t )1 .t N 0* ?O A M tp ^ M tO ? N M N M N 1 d O N W W CO N K Of M tA ? ?d :-. f? O N ip O Cf t ?F .- I? to CO O apppp 1A O ' ^ n O .- z n O N t ? o ?F t M CCoo o n n n .- CO m 0 Z Z Z Z Z Z Z wn z z z A w J ??yy J M J Jt 2 9 tO J h J 00 J 0f J J J J t2 J NOW ??M / P tic v a ?. Do a4 a??z aAwd d a,s ? o ? M O o w 4 J Q vl