Loading...
HomeMy WebLinkAbout20021490 Ver 1_COMPLETE FILE_20020912WATF Michael F. Easley, Governor \0?0 9QG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources C? rte. Alan W. Klimek, P.E. Director l Division of Water Quality o ? Ronald A. and Mildred B. Brown 87 Chad Loop Belhaven, NC, 27810 APPROVAL of 401 Water Quality Certification with Additional Condition Dear Mr. and Mrs. Brown: October 15, 2002 DWQ# 02-1490 Beaufort County You have our approval, in accordance with the attached conditions, to shade 0.10 acre of vegetated and non-vegetated wetlands in order to construct a pier with a T-head and two boat lifts in an unnamed gut and marsh adjacent to Pungo Creek in Beaufort County, as described in your application received by the Division of Water Quality on September 12, 2002. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Number 3371, which can be downloaded from our web site at hfti):Hh2o.enr.state.nc.us/newetlands. This Certification allows you to use your CAMA Permit when issued by the NC Division of Coastal Management. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge, Water Supply Watershed and U.S. Coast Guard regulations. Also this approval will expire when the accompanying CAMA Permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and the additional condition listed below: 1. You are required to return the attached Certification of Completion form to notify DWQ when all work included in the 401 Certification has been completed. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition conforming to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N:C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Tom Steffens or Deborah Sawyer in our Washington Regional Office at (252) 946-6481 or Cyndi Karoly in our Central Office in Raleigh at (919) 733-9721. AW K/cbk Attachments cc: Corps of Engineers Washington Field Office Washington DWQ Regional Office Central Files File Copy Doug Huggett Sincerely, I Klimek, E. 021490 N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1 800 623-7748 A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary September 9, 2002 MEMORANDUM TO: John Dorney , Division of Water Quality, Wetlands/401 Unit FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA PERMIT APPLICATION REVIEW Applicant: RONALD ALAN & MILDRED BROWN Project Location: ADJ. PUNGO CREEK, OFF SR 1718, BANJO CREEK ESTATES, NEAR BELHAVEN Proposed Project: CONSTRUCT A PIER INTO PUNGO CREEK THAT BRIDGES AN UNNAMED GUT WITH A "T" HEAD AND 2 BOAT LIFTS Please indicate below your agency's position or viewpoint on the proposed project and return this form by September 30, 2002. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 244. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us An Equal Opportunity \ Affirrnative Action Employer- 50% Recycled \ 10% Post Consumer Paper ? t I t 1c ` ..5 M M RAW-7-07' - , .._ 3 ]lt(D? General Water Quaay t CBhFfiCa6on No.= (see at adhed) 5400 a 60% (5240) 0 % (5180) =nn otbe aep5ed: : ?Y?L?al7T11 ?ln vCJ - ?L":- fhe? dJ fi f A 2 . "?• u en a?cava on o mora vne acre of we& nds and/or $ ; . 40°l0 (S]90J oPenwafer arPar ? _ ? ??%? ' ? -.. ? ? ? J '-.`---?`i??,:4 - / Lit / - 1.?( - ? ? •r ati"s DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Ronald Alan and Mildred Brown 2. LOCATION OF PROJECT SITE: Off SR 1718, on an unnamed tributary off Pungo Creek at Banjo Creek Estates near Belhaven in Beaufort County, Notfh-Carolina. Photo Index - 2000: 117-1473 G-17; 1995: 117-1270 G-10; 1989: 2-81-5 G-7; State Plane Coordinates - X: 2,679,580 Y: 644,250 Ransomville Quad. (upper right comer) 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 8/15/02 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received - 8/22/02 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP - Community (uplands) (B) AEC(s) Involved: CW,PTA (D) Water Dependent: YES - (D) Intended Use: Private (E) Wastewater Treatment: Existing - Septic Planned - N/A (F) Type of Structures: Existing - single story residence with boat ramp and dock . Planned - A pier, platform and two boatlifts. (G) Estimated Annual Rate of Erosion: N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (Coastal Wetlands) (2,100 ft2) (Shaded) (B) Non-Vegetated Wetlands (816 ft 2) (Pun go Creek) (Shaded) (C) Other (D) Total Area Disturbed: 0.1 acre or ±2,916 ft2 (E) Primary Nursery Area: No (F) Water Classification: SC NSW Open: NO 8. PROJECT SUMMARY: The applicant proposes to construct a 6' x 448' pier that crosses an unnamed gut and marsh adjacent Pungo Creek and extends 60' waterward of the normal water level to reach 4' of water depth in Pungo Creek. The applicant proposes to construct a 12' x 16' T-head and two boat lifts at the waterward end of the pier. IV Ronald Alan and Mildred Brown Beaufort County Project Setting The project site is located off SR 1718 at Banjo Creek Estates on an unnamed gut off Pungo Creek a tributary to the Pungo River in Beaufort County neaI ? Belhaven, North Carolina. The site consists of two lots (Lot no. 15 and Lot No. 30 at Banjo Creek Estates) situated on either side of the unnamed gut. Lot No. 30 is developed located oni the east side of the gut, approximately 1.27 acres, vegetated with upland grasses and various hardwood trees. There exists a single story residence that was constructed on top of a knob that slopes down toward a coastal wetland/marsh and gut adjacent/offPungo Creek. The shoreline on Lot no. 30 is situated on the gut and has no shoreline that fronts Pungo Creek. A dock and wooden frame boat ramp are located on the gut shoreline. The gut is widest at its confluence With Pungo Creek. The gut is approximately 56' wide in the vicinity of the dock but narrows significantly immediately upstream of the dock. The gut is shallow with water depths 1' or less. The gut had previously been navigable to the dock and boat ramp but has experienced some shoaling over time that now precludes use of the dock and boat ramp.. Widgeon Grass (R pia maritime is growing in the organic soil found in the gut. Across the gut on the west side is thle undeveloped Lot No. 15, approximately .70 acre in size, which consists of uplands some 7' !above the elevation of the adjacent coastal wetland/marsh. Lot No. 15 fronts both Pungo Creek and the unnamed gut. A wide expanse of marsh, approximately 400' wide separates the highground on Lot 15 from the Pungo Creek. The width of the coastal wetland/marsh separating thej highground from the water narrows in the gut. Pungo Creek is classified as SC NSW by the Environmental Management Commission. Pungo Creek, at this location, is classified as Inland Waters by the Division of Marine Fisheries Commission and N.C. Wildlife Commission. Project Description The applicant proposes to construct a 6' wide x 56' long pier/footbridge elevated 6' above the normal water level across a gut to a 6' wide pier that will leave f#om the highground on Lot No. 15 and span the coastal wetlands some 342' to Pungo Creek then another 60' into the creek to a 12' x 16' platform with two boat lifts. The pier/footbridge will have a 10' wide navigational span in the center of the gut. Anticipated Impacts There will be some localized short-term turbidity during the construction activities in the gut and Pungo Creek. The pier and platform will shade 816 ft2 of Pungo Creek bottom. The access will shade t 2,100 ft2 of Coastal wetlands. The pier/footbrid ' e across the gut will limit access upstream (waters less than 1' in depth) to craft less than 6' in eight, and less than 10' in width. Steve Trowell - Washington Regional Office - 30 August 2002 Form DCM-MP-1 APPLICATION (To be completed by all applicants) town, community or landmark 1. APPLICANT C. Street address or secondary road number a. Landowner: ??? 1 I S j P1,C,A?T-L. IJ 'V ` ro sed work within city limits or planning Name 1"4- oken j Isurisdiction? Yes X No Address's 7 CH40 A- l? e. Name of body of water nearest project (e.g. river, City tL ?AA UtAl State I U L° creek, sound, bay) ' PV IUG0 Zip ?l d Day Phone o9`Jobi o46166 Fax 4 " b. Authorized Agent: Name, Address City State 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. -PIZ Z) P&n F? -1-Z> 0 0-( D6 E- ."9 /40 r?05'S?.S u f 2'I ?/ ?r.? ! ?t-T Et2 r til ,i?ilicJ?o C f? 6E K Zip Day Phone Fax c. Project name (if any) R. 0-& J A-) P< IE2 NOTE. Permit will be issued in name of landowner(s), mid/or project name. 2. LOCATION OF PROPOSED PROJECT a. County B eo4 tJ ]en P, t- 0 p b. Is the proposed activity maintenance of an _ existing project, new work, or both? -AJ47&.,1 Gc iC74-k- c. Will the project be for public, private or commercial use? Ply. t (7.4TO- d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. ROPD,-!?AE TD CoA227 txcT 1jaz 14x117 PL AZ"Fo r2.M 11J/ -rOAO t DWT 41 Fr seC7- 4.diL.L- 1?RDtft Ac /-?C'.C'`?J __ TO d/" Cdr- 44-')47-,6,Q- l4 L t.a w l lcl G etii DDS/ Act ra i? AT !5 FO & P>a 1 >r AA LY ti!va-- LE P' ld.Y ice 2r ?j1 j)Eiue C Revised 03/95 Form DCM MP-1 4. LAND AND WATER CHARACTERISTICS I-or a. Size of entire tract L D T 4*- 3 O 1,27W_ b. Size of individual lot(s) /,;Z-i 4&- ! ?DAc, c. Approximate elevation of tract above MHW or NWL 7,'4"' t d. Soil type(s) and texture(s) of tract e. Vegetation on tract ya[_ 4#J V a k 4;5'5Q2 WIa X r2 14A-knA QQZ;k pJNt= /1ll A?'L5?-I f. Man-made features now on tract eT I V6 L..c _F,44Jj1_V RjF3I VZGAJC.=_ A.dT- 3 0 g. What is the CAMA Land Use Plan land classification of the site? Po w& zhe lood land use plain) Conservation Transitional Developed . Community Rural Other h. How is the tract?zoned by local government? L Is the proposed project consistent with the applicable zoning? Yes No /V`/? (Armch zoning mmph-- -rdfi= e, tropp -bkJ j• Has a professional archaeological done for -the tract? Yes - If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes >_ No I. Are there wetlands on the site? )C Yes No Coastal (marsh) )! _ Other If yes, has a delineation been conducted? x-' (Attach domnm Won, :f available) assessment been -,2!L-No- ..-- - m. Describe existing wastewater treatment facilities. F DT I L' T4 oO k. - i-a -r 3 _ /-? s4.5 r? ? ? /r.7 ? ppit2fJt1? D n. Describe location and type. of discharges to waters of the state..,.(For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" -and residential discharges.) -sue ?.? r+ - in, y icJ 4916=1q' o: Describe existing driEkizi water supply .source. e f-0 0 Al 'r'V J LJ* A rE L;AL L ?PnQ A-!27 a O-1 1;5- 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of thel deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copyi of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 'S 1/2" by 11" white paper. (Refer to _.. Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the adjacent ''waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on 'the proposed project to the Division of Coastal Management. Upon signing this form, the.applicant further certifies that such notice has been provided. TO ENTER ON LAND I understand that any permit. issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with' the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. Name A-0-L - u? I certify that I am authorized to grant, and do in fact, Address -q"7 Cho Q-?as4g D grant permission to representatives of state and federal Phone t; r] 1 a review agencies to enter on the aforementioned lands in connection with evaluating information related to this Name c? permit application and. follow-up monitoring of the Address ? - H tt? r??[ bt?uc=?l project. Phone jd Name I further certify that the information provided in this A-7 J Address r_ L_? application is truthful to the best of my knowledge. -T-7? 13a Q?. --arrla/D Phone • 5C- ,C 6?-g4A.S E :5,;,o E- - - ,, This is the day of 1J U ?'?3-_,?Oa? A list of previous state or federal permits issued for work on the project tract.. Include permit numbers, permittee, and issuing dates. • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the app iWon. A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Print Name Signature Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development r/'DCM MP-4 Structures Information >/DCM MP -5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. 400 copies of this public document were printed at a total cost of $52.48 or $.13 per copy. Revised 03195 Form DCM-MP-4 STRUCTURES (Construction within Public Trust Areas) _ Attach this form to Joint Application for CAMA Major e. Permit, Form DCM-MP-1. Be sure to complete all other sections. of the Joint Application which relate to this proposed project. a. Dock(s) and/or ier(s) (1) Commercial -Community X Private (2) Number • 1 (3) Length q q -9 (4) Width b/ (5) Finger Piers Yes _,X, No (i) Number (ii) Length f (iii) Width (6) Platform(s) _ CY Yes No (i) Number (ii) Length /z (iii) Width &P (7) Number of slips proposed 2 .4/P- _5 g• (8) Proximity of structure to adjacent riparian property lines !4E14Q657 - 120s:-2v4f 14- (9) Width of water body Pogg,* CQEEk - * rd +t r (10) Water depth at waterward end of pier at MLW or6D Gf b. Boathouse (including covered lifts) Ji/A (1) Commercial Private (2) Length (3) Width c. Groin (e.g. wood, sheetpile, etc.) ?JIA (1) Number (2) Length(s) G d. Breakwater (e.g. wood, sheetpile, etc.) ?JIA (1) Length (2) Average distance from NEW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands Mooring buoys IQ lA (1) Commercial -Community Private (2) Number (3) Description of buoy (Color, inscription, size, anchor, etc.) (4) Width of water body (5) Distance buoy(s) to be placed beyond shoreline! Mooring structure oatlift mooring pilings, etc.) (1) -Con =1 5 Community _ Private (2) Number _ 2- (3) Length -114 (4) Width 1 Other (Give compkie description) v A. 17Aozo,) or F?p6ject Name Date Revised 03195 Form DCM-MP-5 BRIDGES AND CULVERTS- Attach-this form to Joint Application for CAMA Major Permit, Form .DCM-MP-1 Be sure to complete all other sections of the Joint Application that relate to this proposed project. (4). Will all, or a part of, the existing culvert be . removed? (Explain) 1. BRIDGES a. Public Private b. Type of bridge (construction material) -rizeATE P Li-9 M0 2 c. Water body to be crossed by bridge -- 0 A7 s4 At E-0 G U T d. Water depth at the proposed crossing at MLW or i e. Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge. (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) £ Will proposed bridge replace an existing culvert(s)? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or N`.VL g. Length of proposed bridger? 'L! h. Width of proposed bridge !o i. Height of proposed bridge above wetlands 3 j. Will the proposed bridge affect existing water flow? Yes No If yes, explain k. . Navigation clearance underneath prPosed bridge .Al 'Pa=r%J Ye AIUPL' /10 C eA-$ TFi Q ?J PA4xJ 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes -No If yes, explain m. Will the proposed bridge. cross wetlands containing no navigable waters? ?C Yes No If yes, explain f3 k 1 O&E t._J //_T & V r o a., M A-25 N -rzt P? E-2 ?3v t[..-r d?v t o i ?S n. Have you contacted the U.S. Coast Guard concerning their app oval9 Yes No If yes, please provide record of their action. Revised 03/95 Form DCM-Ml'-5 2. CULVERTS N/g a. Water body in which culvert is to be plarO b. Number of culverts proposed c. Type of culvert (construction. material, style) d. Will proposed culvert replace an existing bridge? Yes No If Yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) e. Will proposed culvert replace an existing culvert? Yes No If Yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the NU-1W or NWL C4) Will all, or a part of, the existing culvert be removed? (Explain) --------------- f_ Length of proposed culvert g. Width of proposed culvert h.' Height of the top of the proposed culvert above the MHW or NWL i. Will the proposed culvert affect existing water flow? Yes No if yes, explain j. Will the proposed culvert affect existing navigation potential? Yes No If yes, explain. ------------ .3. EXCAVA-n0NAND FILL $• Will the.placement of the proposed bridge or culvert require any excavation below the MHW or NWL? Yes No if yes, (1) Length of "area to be excavated (2) Width of area to be excavated (3) Depth of area to be excavated' (4) Amount of material to be excavated in cubic yards i b. Will the placement of the proposed bridge or culvert require any excavation within: Coastal Wetlands _:., SAVs _ Other Wetlands If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards c. Will the placement of the proposed bridge or culvert require any highground excavation? Yes_ No If yes, - (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards d. If the placementi of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area (2) Dimensions of spoil disposal area (3) Do you claim title to the disposal area? ------ Yes No If no, attach a letter granting permission from the owner: Revised 03195 Form DCM-MP-S (4) Will the disposal area be available. for future b. Will the proposed project require the relocation of maintenance? Yes No any existing utility lines? Yes No (5) Does the disposal area include any coastal If yes, explain in detail wetlands (marsh), SAVs, or other wetlands? Yes No If yes, give dimensions if different from (2) above. c. Will the proposed project require the construction of (6) Does the disposal area include any area below any temporary detour structures? the MHW or NWL? Yes No Yes No If yes, give dimension if different from No. 2 If yes, explain in detail above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material d. Will the proposed project require any work described in Item d. above) to be placed below channels? Yes No >C MHW or NWL? Yes No ,-- - If yes, complete Form DCM-MP-2 If yes, (1) Length of area to be filled e. How will excavated or fill m terial be kept on site (2) Width of area to be filled and erosion controlled? ?- (3) Purpose of fill f. Will the placement of the proposed bridge or culvert f. What type of construction equipment will be used result in any fill (other than excavated material (for example, dragline, backhoe or hydraulic described in Item d. above) to be placed within: dredge)? ?' S' 1A AgL-t- f3 ge-K 14D C - oew t> - Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be filled (2) Width of area to be filled - g. Will wetlands be crossed in transporting equipment (3) Purpose of fill to project site? '-/ Yes No If yes, explain steps that will be taken to lessen environmental impacts. Y-06 'AI)4-T LJJ I LL g. Will the placement of the proposed bridge or culvert 9F J54ff 0 TO C QD'S-f7 LJST[. f4NZ??7 result in any fill (other than excavated material - described in Item d. , above) to be placed on higbground? Yes No h. Will the placement of the proposed bridge or culvert If yes, require any shoreline stabilization? (1) Length of area to be filled Yes , hlf No (2) Width of area to be filled If yes, explain in detail (3) Purpose of fill 4. GENERAL a. Will the proposed p cject involve any mitigation? Yes No If yes, explain in detail C t or Project Name b?s'?L1? ?• ? j,pow.t? Signature _ ad C) Date Revised 03/95 ?y -? i ` f3l L L ?DS S 4 ? fl ? > > ? p Q iL IP Ay L DAY-5 XI-lole-A7eo OA TG t FAIR zn A, Oiwa ov :? i,41 ???i t? F3 x /-, ,c OPn o r tcA 5 . I t° ? y Irw ., 9 r 1 J bo C ? (? w ? ?? a Q a ? an a w q? Q ? v 24 ?D Permit # _S s y Beaufort County Health Department P. O. Box 579 Construction Washington, N rth Carolina 27889. ? R`xir (91 ? Existing System IM PRO 6 y Improvements Permit subject to rcvoc atic,if the site places or in changes or site alterations occur 0ex ?„r `v We- Owner or Contract 2c Si l.? Phoric Subdivision• ` Lot Number: PIN; • • ?'• s? l State Road Num' Directions. Property Size: •? 7 a ae _ Type Structure: i-109-SA-1- No. Bedrooms: No. People: _ •Z - - WatcrSupply. _? (? • - ' (MaHitain 2nlnrmirnl feet • • , • ' . • • . • • • • a ? Separation from any of septic System and repair area' Classification rtabk , / - - ? Provisionally Suitable (3 PS with fit[ -I Additiorwl Drair"im r • Seasonal Wetness Conditi6n: Soil Type ._.?-jib- ??? • Septic Tank- (C e a gal. Pump.Ta nk • • • • . Nitrification Field: a r, . • • • • • • • : p p O COrrlnlentS:c - square fed Gtr?? ^ d -- ' 12 Q O • •• ~ • ! - Additional for all systems: Iandscape'system area for sdface water runoff and G3 • • . • • • . grass. Do not place drive orairy building over the System area orrepairw= Observe . . all Proles setbacks (10 NCAC 10A.1950). Do not work soil or install system in wet condition. Do not be on site during installation and inspection. Environmental Health S `. ' pecialist: Date: 3 F AUTHORIZED FOR WASTEWATER SYSTEM CONSTRUCTION ^ (Authorization For Wastewater System.. Construction is valid for five years from date of issuance (] or date of permit ? ). Owner or Contractor, Phone: Address: _ - Subdivision: Lot Number. - - - State Road Number. Directions: Property Size: Type Structure: Environmental Health Specialist. Date: 33 .? N? p 33'4 White - Owner/Contractor Yellow- Health Department Pink -- Building Inspection MEMORANDUM TO: John Dorney Regional Contact: tom steffens Non-Discharge Branch WQ Supervisor: Rn3Pr Thorpe Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Ronald Alan & Mildred Brown County Beaufort Project Number 02 1490 County2; Recvd From DCM Region Washington Received Date 9/12/02 Recvd By Region Project Type construct a pier Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet BE Type Type Impact Score Index Prim. Supp. Basin Req. Req. CAIt4 R OTH O Y _0N F 29-'?4-35 sc Nsw 30: X07. 0.10 F_-F_ F_ Mitigation Wetland MitigationType Type Acres Feet I F_ I F__ Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y 0 N Recommendation: 0 Issue 0 Issue/Cond 0 Deny Provided by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: Issue n/c cc: Regional Office Page Number 1 Central Office