Loading...
HomeMy WebLinkAboutNCC201400_NOI Application_20200409Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 4/7/2020 3:29:01 PM (NCG01 NOI Submission) Approve by Clark, Paul 4/8/2020 9:36:03 AM (Review- Construction NOI 24098) • The task was assigned to Clark, Paul by round robin distribution 4/7/2020 3:29 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 9, 2020 5:00 PM. The priority is: High 4/7/2020 3:29 PM Submit by McCoy, Suzanne 4/9/2020 7:48:50 AM (Payment Verification for NCC201400) * Sanu Odugbesan • McCoy, Suzanne assigned the task to McCoy, Suzanne 4/9/2020 7:48 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: May 20, 2020 5:00 PM. The priority is: High 4/8/2020 9:36 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information la. Project Name * PNG Line 243 receiver 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 2. County* Carteret 3. Highway or Street US Hwy 70 Address* Street name only is acceptable if no address nunber assigned yet 4. CityorTownship* Newport 5. State * NC 6. Zip Code* 28557 7. Latitude* Enter the latitude in decinal degrees 34.7547 8. Longitude * Enter the longitude in decinal degrees (MJSTbe negative) -76.8472 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 04/08/2020 Estimated Construction Project Start Date 10. Date to End* 07/31/2020 Estinated Construction Project End Date 11. SIC (Primary) * Other (0000) Standard Industrial C]assification for Development 12. Acres to be 3.17 disturbed* (including off -site borrow and waste areas) 13. Total site area 5.68 (acres)* 14. Post- 1.10 construction (Estimated) impervious area (acres) * NCC Project NCC-CARTE-2020-PNG Line 243 receiver Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Hull Swamp Wate rbody* Nacre of waterbody into which storrrwater runoff w ill discharge 15b. Waterbody 21-15 Index No. * NC Waterbody Index Minter Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Responsible Entity Name * Piedmont Natural Gas, Inc. It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * Sanu If Corporation, enter Registered Agent First %rre 3. Last Name* Odugbesan It Corporation, enter F;bgistered Agent Last %ne 3b. Title Project Manager 4. Permitee E-mail sanu.odugbesan@duke-energy.com Address* 5. Permittee 704-731-4153 Telephone No.* 6. Permittee Mailing Street Address Address* 4720 Piedmont Row Dr Address Line 2 City State / Rovince / F;bgion Charlotte NC Fbstal / Zip Code Country 28210 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 4720 Piedmont Row Drive Address Line 2 City State / Frovince / Region Charlotte NC Fbstal / Zip Code Country 28210 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Wade Contact - First Name * 2. Primary Site Kennedy Contact - Last Name * 3. Title Superintendent 4. Site Contact E- wkennedy@troyconstruction.com mail Address* 5. Site Contact 903-244-7346 Telephone No. 6. Organization Troy Construction Name 7. Site Contact Street Address Mailing Address* 3375 Maysville Road Address Line 2 city Commerce Fbstal / Zip Code 30529-1375 8. Consultant Name (Optional) Dan Jester First and Last nacre 9. Consultant E-mail djester@stimmelpa.com This person will be copied on all correspondence. 10. Consultant 336-723-1067 Telephone No. State / Rovince / Region Ga. Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 03/16/2020 Approved * 2. E&SC Plan Project CARTE-2020-018 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Wilmington (WiRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan CARTE-2020-018 Approval 3-16-2020.pdf 301.57KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) PNG-C-026-0001184-O.pdf 1.51 MB Mast be RDF format. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification Receiver.pdf 245.7KB Form Wst be RDFfornat This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Sanu Odugbesan Title Project Manager Organization Legally Responsible Entity Piedmont Natural Gas Company Date * 04/07/2020 F. Tracking and COC Info NOI Tracking No. 24098 NC Reference No. NCG01-2020-1400 Uses 'count number' variable (incremrented by SP) Certificate of NCC201400 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 1400 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)