McDowell County
DWQ Project #: 02-1372
Approval of 401 Quality Certification with
Additional Conditions and Catawba River Buffer Rules
Joseph J. Balich
10611 S. Maplewood Avenue
Chicago, IL 60655
Dear Mr. Balich:
You have our approval, in accordance with the attached conditions, to impact 240 square feet of
waters for the purpose of shoreline stabilization at Lakeview Shores, Lot # 1 on Lake James as you
described in your application dated August 20, 2002. After reviewing your application, we have
decided that this fill is covered by General Water Quality Certification Number 3373, which may be
viewed on our website at http://h2o.enr.state.nc.us/ncwetlands. This certification allows you to use
General Permit Number 198200030 when the Corps of Engineers issues it. This approval is also valid
for the Catawba River buffer rules (15A NCAC 2B .0243). In addition, you should get any other
federal, state or local permits before you go ahead with your project including (but not limited to)
Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed
regulations. This approval will expire when the accompanying 404 or CAMA permit expires
unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application
except as modified below. If you change your project, you must notify us and you may be required to
send us a new application. If the property is sold, the new owner must be given a copy of this
Certification and approval letter and is thereby responsible for complying with all conditions. If total
wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be
required as described in 15A NCAC 2H.0506 (h) (6) and (7). This approval shall expire when the
corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this
approval to be valid, you must follow the conditions listed in the attached certification and any
additional conditions listed below.
1. Stormwater shall be directed as diffuse flow at non-erosive velocities across the entire
protected stream buffers
2. No trees shall be removed from Zone 1 of the Catawba Buffer unless they are directly within
the construction access corridor. If trees are removed, at least two species of native forested
vegetation shall be re-established within the construction access or other temporary impact area
occurring in the protected buffer zone within the next growing season following construction
of the project;
This project is for the installation of a interlocking block wall to prevent further erosion of the
property due to wave action. The use of mechanical equipment on the beach must be
minimized;
AM
N. C. Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
(919) 733-1786 (phone), 919-733-6893 (fax), (http://h2o.enr.state.nc.us/ncwetlands
4. Equipment and materials may be offloaded to the beach at the bulkhead site, but steps must be
taken to keep all equipment out of the reservoir;
5. Any disturbance within 50 feet of the shoreline must be done in compliance with the Catawba
River buffer rules;
6. Upon completion of the project, the applicant shall complete and return the enclosed
"Certification of Completion Form" to notify DWQ that all the work included in the 401
Certification has been completed. The responsible party shall complete the attached form and
return it to the 401/Wetlands Unit of the Division of Water Quality.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send
a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone John Dorney at 919-733-1786 or Mike Parker at
our Asheville Regional Office at 828-251-6208.
Sincerely,
JRD/bs
Attachments
cc: Corps of Engineers Asheville Field Office
Asheville DWQ Regional Office
File copy
Central Files
Sue Harmon, Permits, Etc.
V
021372
0 0
I JO At 7 2002
The following is an abbreviated application form for those applying for a 401 Wated__
Quality Certification to impact FERC (Federal Energy Regulatory Commission) l,r,n
regulated lake shore or bottom under the U.S. Army Corps of Engineers Permif-
GP30. This Application cannot be used for wetland or stream impacts. Please
provide seven (7) copies of this application and supporting information as well as a
non-refundable application fee to the Division of Water Quality of $200.00 for
impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom
of greater or equal to 1 acre.
Applications should be sent to:
Division of Water Quality Wetlands Unit "J
1650 Mail Service Center
Raleigh, NC 27699-1650
Applicant Information
1. Owner/Applicant Information
Name:
Mailing Address:
Telephone Number: 713-44S-91L13 Fax Number:
E-mail Address:
Agent Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affiliation: PFRMITS, ETG
Mailing Address: S IF HARMON
P.O. BOX 234
BOILING SPRINGS, NC 28017
Telephone Number: '704 434 - 0JU, Fax Number:704 - 434- 7101)
E-mail Address: °,r ief-(- b r. 0-b m
II. Project Information
Attach a vicinity map clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads. Also provide a detailed site
plan showing property boundaries and development plans in relation to
surrounding properties. You may use the diagram below to make a hand sketch of
` i i
your project. Also, see the example below for guidance. Both the vicinity map and
site plan must include a scale and north arrow. The footprints of all buildings,
impervious surfaces, or other facilities must be included.
1. Location
County: Mc- F)yLJJ Nearest Town: Ne?
Subdivision name or site address (include phase/lot number): Lake view) C'?hofe.s
Directions to site please include road numbers, landmarks, etc. (This is not
necessary if an adequate vicinity map is included): N la.(? G to 17Y1G1_10f 1Jr'
Describe the
2 existing land use or condition of the site at the time of this
.
application: Vacant pri va k. re si de nha.l lake/ Al W illi free-,
i
3. Property size (acres): 5), i.C. re 5 rr --
4. Nearest body of water (stream/river/sound/ocean/lake): Lake. - C Ines
5. Describe the purpose of the proposed work: I
+-he ui he r 5 0e? of-' propei-Iti I ; ne' .
List the e of equipment to be used to construct the project: Track hoe, and
hancr+pok -
7. Amount of impact (including all excavation,
etc.) below the normal pool l`a?ke level in s(Q?uai
'7i v t?l), ? fan ? ieo-
backfill, rip rap, retaining walls,
feet or acres:
a. Amount of impact (including all clearing, back fill, excavation, rip rap,
retaining walls, etc.) above the normal pool lake level d 50 feet land-ward in
square feet or acres: !o X I U f X 0
.,? ?1nnI _ t l'1n
b. Please describe vegetation above the normal pool lake level and 50 feet land-
ward to be impacted (number of trees for instance): jSnmP frf? i . ) i l l I?(I - f - f)z,
brdi nanUb u.lcl) u;? f I 1 h?? b? app) ?edJfD di5furbera area .
V
APP44aiwAgent's Signature ' 'J Date '
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
S5,01 '[?(z.l Jh
Lake (Full Pond)
Full Pond L ~_
Shoreline- -J
. c?
R
? +erlCiK?'?u ? • b 1++iall LI "6 ock-+
? vvc? I i
tea.
Arm C red A
A-bo& Normal Pcc)i
50'
Please approximately sketch the following information on this plan
(please provide dimensions for each item, such as 10 ft. x 100 ft):
1) All proposed vegetation clearing (provide dimensions)
2) Location of rip rap or fill to be placed above the "Normal Pool" elevation
3) Location of rip rap or fill to be placed below the "Normal Pool" elevation
d) The location of any proposed structures such as buildings, retaining
walls. docks, etc.
5) The location of any excavation or dredging below the "Normal Pool"
elevation.
6) Location of construction access corridors.
T:nfcdoc,kovt blob lone and
0
P(?rox1 mcc+?I C? ? n h??? v
y
Joseph J. Ballch
10611 S. Maplewood Avenue
Chicago, IL 60655
August 10, 2002
To Whom it May Concern:
I hereby authorize Ms. Sue Harmon of PERMITS, ETC. to act as my agent and sign on my
behalf all applications for Shoreline Stabilization on my property at Lakeview Shores - Lot#1
Magnolia Drive on Lake James, NC.
Joseph J. Balich - property owner
dated /6 D L
N c crw Nar+n 1,a..a on v•wna / BEARING TABLE FOR w
ao•ncr ona mrormalian nnol•a
n vlar Bo°L 4 or Pav• 323 CENTER OF 30' R/ -W
All o,sronc•s no.n N•rron are
0 nr91 alr""7,. I'-
1 b.axiny
N 81.5036'•W diet.
15.36'
Na N.c.c. s. m nu..•ntanon
f 2 N 04.20 30 W 46. 14'
at .°el«1 rro
...... z,ooo a. 3 N 58. 56' 56" W 62.56'
Arra+ h coordlno[• 4 N 76.22 56"W 16.74'
comnal ar io n+. 5 S 7'52258"W 44.72'
N 6 S 63.30 02" W
" 53.68'
'
7 S 55' 17'06
W 117. 17
8 S 55. 17'06•:W 33.66'
9 S 49-02'57 W 28.60'
10
11 S 43. 18:36•:W
S 4 1. 2647 W 30.97:
76.06'
12 S 23.0755•'W 36.06'
13 S OB• 45 32" W
" 13.21;
14 S 01.09 58
W 12.85,
15 S OT 12 53 E 87.78 TOT
16 S 46. 12 58;' W 28.38'
'
17 S 63*40'05'W 39.73
18 S 58. 2 1' 16•' W 11. 19
19
S 5T 52, 24,; W
'
:
29. 17
20 S 39' I5, 54„W 40.1 I;
21 S 39' 15 54 W 40.00
22 S 27. 15' 37" W I 1 1.64;TOT
23 S 27.09 19" W 38.77
24 S 21' 12,42W 51.71;
25 S I O' 16, 12„ W
• 41. 23,
26
27 S 10
165: 12„ W
SOI.5352
W 8.72,
54.09
NN/ (] ?? 5) 28
29 „
S O 1' 53 52,' W
S 2 I. 07. 43 W 9.72'
47.60
30 S 13. 50 04" W 40.78'
31 S 13.5004W
" 6.49;
32 S 0t'4Y26
E
" 90.60,
'
33 S 0343'04
W 21.98
BEARI NG TABLE FOR COMMON BOUNDARY
WITH COKE POWER COMPANY l
9ro„nQ 31
34
35 N 19.5131"W
N 00.05 14'W 19.84
53.60'
36 N 04'01 09' E 37.99'
37 N 17.47 .47" 'E
. 70.10; Total
36 19 W
N 03. 11 53.16 Total L AK£V/EW
39 N 11. 19' 4 1" W 60.00'
40 N 07123' 315'W 30.04'
41 N07.21'06"E 41.15'
42 N 16.5fi09'E 32.80 TON
43 N 38'08'34' E :
117.99' Total
44 N 42.25' 07" E 1 13.80' Total
45 N 24.22' 53 E 26.70' -?
46
47 N 41. 19'0 I" E
'51'•E
N IS-44 92.95'
55.78' Total
M12
T
[
46 '
N 83.15 09' E 28.99' 6 r
49 N 31.40 14•E 152.54' Total
50 N W42
13
E 122.05 Total
51 :
N 58.20' 00' E
: :
58.67'
52 N 73.43 IB" E 66.90' Total
53 N 85.58'39•'E 24.59'
54 N 44.14' 24 E 57.19' Vj
55 S 76.51' IS'E
' 20.33'
' C7A,
56
N 56'39' 31;
E
45.83 /
57 N52.29'OB'E 23.57' MAP
58 S 89.10 Ir'E 17.52' .
59 N 6 1. 42' 44' E 29.40
60 N 55.45'56'E 81.01'
y? INSET Bobai1 Ptp160l/Ne
scale l'=100' eo; gl 1
N.C.GR10 NnrM r? e6
(oo+rd cn P.6.4 ,P9.325
?/?`/ and PQ 327) :Q'
V ? 79,
ra
P 7%j
/ J 7?1 \ I8
T41.69 Ac, h6ti/
73"';-v I:.
P .
t 1 0 /\2
1
10 f aow-d
^O .
Ko
C I I, V., toy,
I o !\? X69 [ \
P 8.6Fi? o W a J? ?Q
of ^. 1 s, "k7. G\
vs AO
a 7)
A, 1,44
?C1-/ 0.82 AC. (^ wN mZ,o?.
16 1
4rcl
3o R/W1 a Pt •T 5 64° 10.4e' W- 222.
Crescenl Lond Q Timber Co. Properly
0,8 206 , PV 870 (portioh of -8R- 26)
I
r; 0.52 Ac
/ /•F L
PERM r \ \ \ I
\ x
E4SEMENTT?•'! I [: ?. \ ,)x
I E atto et'6x )tss 3,_ ` N \? •y:. /i]%
I us[°LNr / /
iu[•e .•r•)rs9 )z.
\\ ` LIK
1 `
' ? 10
2L
JIL
11
sO 1
0
w? I c. d? 5
O
?b o0;7/
LIP
:an a9 1. tv r•
(THE FOLLOWING TABLES ARE RS SHOWN ON PLAT P.C:OK 4, FACE '27I
BEARING TABLE FOR CENTENLINE OF BEARING TABLE FOR STATE NORTfi
TEMPORARY CONSTRUCTION EASEMENT CENTER OF 50'R/ W ter 1°.r9o,na cr 0.,
N•(• 0i3: Noro,x PvaliC lo,
y CISr_ :arrr: rn01A 1,
_- tlE4_' 1'!S!, lL. •[4N llr:[
u )c• K+_ut .-_`t. I u 49•x! s) „ Cp7u 3 35 5 ,7.. w 20 73
_ r[•xtI?r ]a 6i' i[ N ]f•?•ILS- _I]•)_I_ F: N }7"0} 18, W 'ti l,:
C 0] t 14 j4 N t6•) i N 4T 17 V,- 41 77
)i oo > )i S. _99 • )i 1 I re r3? I. J 411 •. 7
4,-jj_2L L?.>r' 7 S Lt•H V.J 4?9 ! 1 } 1 (
I ti?. .c [ r .
)5 eI ) (•?% 369•5r-[ • t- t I L } 4. hrS•?•• `f
4t 6 `3y,3l I TL tlx_• v t] ( I i7..[ - L 90 [1,
_r_••n u( ]' ). Nts•I• z4 [_.n_w_ rl tiZ,3' 56 UJ
xr n•nL O4191n Nr4•)•aL 7.i: cr SFe°37 051 5.) ')'
1;-]LSt'=F w vs . oz•):' 1,' _SO e) 1.1 Nou° f,4 l 1; •:
14 rte[ 41 ' )• a 12. 1]' r6 it"% .l. •12•r• \[: JC L !7 "
=)Z!iv q( ]9 3! V. h(-i:"55 II N 3, B}
_N ]4• N ]i [ )I.L)' N Iln ?5 1 G M' v7 51
Page 1 of I
MAPBLAST!
Everyune needs a little direction in life
Nebo, NC
t AFULAST!
w'W
r 4 K'9gthc 2 T? ?V rY
? i
1
q.,
k 3"??'F far;t
-?t
• x?.+4+
Y.
i r-
r
ok
I
?.'ZYJ 71 (t'lF?ir i u?y ?uV -
r. WNW i,
-_ I 4r r z` ??.
Lake James
Lie 011
kp,
? as
53 58 ??'
54
54 J
54 _
154
54
57
126
70
76 58
00002 '?lanity ory,
[ Icon Latitude: 35.7313954, Longitude: -81.915778)
http /iwww.mapblast.com/myblastImPrint.mb?CT=35.7313954`/`3A-81.915778%3A2000... 8/16/2002
Joe Balich
?u ' r R.