Loading...
HomeMy WebLinkAboutNCC201409_ESC Approval Submitted_20200408ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality April 1, 2020 LETTER OF APPROVAL WITH MODIFICATIONS SACR Development, LLC ATTN: Mr. Charles Blackwell PO Box 427 Mamers, NC 27552 RE: Project Name: St. Andrews Acres Approved: 19.6 Project ID: LEE-2020-031 County: Lee City: Sanford Address: St. Andrews Church Road River Basin: Cape Fear Stream Classification: Other Submitted By: Hilliard Engineering, ATTN: Jarrod E. Hilliard, PE Date Received by LQS: March 2, 2020 Plan Type: New — Residential Dear Mr. Blackwell: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.Lucas2ncdenr.gov or Paul Clark at Paul. Clarkgncdenr. ov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, a D E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources -," Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609 NORTH Nn 919191.4200 Letter of Approval with Modifications SACR Development, LLC April 1, 2020 Page 2 of 4 $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.l(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Letter of Approval with Modifications SACR Development, LLC April 1, 2020 Page 3 of 4 Your cooperation is appreciated. Sincerely, 0 �- &r[�- Dylan Reinhardt Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Hilliard Engineering, ATTN: Jarrod E. Hilliard, PE (jilliardghilliarden ineering.com) Regional Office file Letter of Approval with Modifications SACR Development, LLC April 1, 2020 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: St. Andrews Project ID: LEE-2020-031 County: Lee 1. Add to the construction sequence to contact the DEMLR Raleigh Regional Office at least 48 hours prior to commencing the land -disturbing activity. The contact number is (919) 791-4200. (15A NCAC 04B .106(b)) 2. Add the following statement to the construction sequence, "When the project is complete, the permittee shall contact DEMLR to close out the E&SC Plan. After DEMLR informs the permittee of the project close out, via inspection report, the permittee shall visit deq.nc.gov/NCGO1 to submit an electronic Notice of Termination (e-NOT). A $100 annual general permit fee will be charged until the e-NOT has been filled out." The construction sequence must coordinate the timing of land -disturbing activities with the installation and removal of all proposed erosion and sedimentation control measures. (i.e. include the basins, diversions, etc. not just the SFO's) 4. Ensure that the phase construction sequences shown on sheet 4, 5, & 6 match the cumulative sequence shown on sheet 7. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities