Loading...
HomeMy WebLinkAbout20200419 Ver 1_WRC Comments_20200408 North Carolina Wildlife Resources Commission Gordon Myers, Executive Director April 8, 2020 Ms. Amanda Fuemmeler U.S. Army Corps of Engineers, Regulatory Branch 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 SUBJECT: Dye-Fisher Project North Fork New River, Ashe County Dear Ms. Fuemmeler: Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed an application to stabilize 580 ft of the North Fork New River in Ashe County. Our comments on this application are offered for your consideration under provisions of the Clean Water Act of 1977 (33 U.S.C. 466 et. seq.) and Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d). Project activities should not impact wild trout and do not need to be avoided during the trout moratorium. However, the North Fork New River is recognized by the NC Natural Heritage Program as the North Fork New River Aquatic Habitat, rated Very High for the richness of rare species it contains. Rare and listed species found in the river in the vicinity of the project include Seep Mudalia \[Leptoxis dilatata, US Federal Species of Concern (FSC), NC Special Concern (SC)\], Eastern Hellbender (Cryptobranchus alleganiensis, US FSC, NC SC), Kanawha Minnow (Phenacobius teretulus, NC SC), Kanawha Darter \[Etheostoma kanawhae, NC Significantly Rare (SR)\], Tongue-tied Minnow (Exoglossum laurae, NC SR), and Kanawha Rosyface Shiner (Notropis sp., NC SR). It is very possible that hellbenders are found within the project reach. These species are especially sensitive to sedimentation, and good erosion and sediment control measure for this project are essential to protect these species. The application proposes to stabilize an eroding reach of bank on the North Fork New River through sloping the bank, planting native woody and herbaceous vegetation, and installing two in-stream rock vanes. Most work will be done from the bank, but some instream access may be necessary for proper installation of the rock vane. Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 Dye-Fisher Project Page 2 April 8, 2020 North Fork New River, Ashe County We offer the following recommendations to minimize impacts to the aquatic community: 1.In-channel work should be accomplished as quickly as possible and vigilance used in sediment and erosion control during site preparation, construction, and clean up. Disturbed areas should be seeded, mulched and/or matted as soon as possible, preferably at the end of each work day. 2.Any erosion control matting used should be free of nylon or plastic mesh, as this type of mesh netting frequently entangles wildlife and is slow to degrade, resulting in a hazard that may last for years. 3.Work should be performed during low flows.For the rock vane installation, we recommend diverting flows around the work area especially at the bank tie in location to reduce the risk of fine sediment liberation and loss. 4.The project manager should reach out to Luke Etchison (luke.etchison@ncwildlife.org) and Lori Williams (lori.williams@ncwildlife.org ) at least three weeks before construction begins so that the area of impact can be surveyed for hellbenders and mussels, and animals relocated if found. 5.Shelter rocks potentially used by hellbenders should be left undisturbed during construction activities. Shelter rocks are typically large flat rocks at least a foot in diameter. If animals are disturbed during construction, they should be captured in a bucket and moved away from the area of disturbance. Please notify Lori Williams if hellbenders are found. 6.We recommend that a woody buffer of at least 30 feet be planted on the stream banks as infrastructure allows in order to ensure project success. Thank you for the opportunity to review and comment on this project. Please contact me at (828) 400-4223 if you have any questions about these comments. Sincerely, Andrea Leslie Mountain Region Coordinator, Habitat Conservation Program ec: Glen Sullivan, Foggy Mountain Nursery Sue Homewood, NC Division of Water Resources Byron Hamstead, US Fish and Wildlife Service Luke Etchison and Lori Williams, NCWRC