HomeMy WebLinkAbout20021318 Ver 1_COMPLETE FILE_20020819OF W A T, R ?O p r? r p "< October 8, 2002 DWQ# 02-1318 Dare County Lt. Col. Michael J. Coats 4 CES/CC 1095 Peterson Avenue Seymour Johnson AFB, NC 27531- APPROVAL of 401 Water Quality Certification with Additional Condition Dear Lt. Col. Coats: You have our approval, in accordance with the attached conditions, to install a new culvert under Alligator Road at the US Air Force Dare County Bombing Range in order to restore wetland hydrology to adjacent wetlands in Dare County, as you described in your application received by the Division of Water Quality on August 19, 2002 (dated August 12, 2002). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3376, which can be viewed on our web site at http://h2o.enr.state.nc.us/ncwetlands . This Certification allows you to use Nationwide Permit Number 3 when issued by the U.S. Army Corps of Engineers. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and the additional condition listed below: 1. You are required to return the attached Certification of Completion form to notify DWQ when all work included in the 401 Certification has been completed. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Tom Steffens in our Washington Regional Office at 252-946-6481 or John Dorney in our Central Office at 919-733-9646. AW K/jrd Attachments cc: Corps of Engineers Washington Regulatory Field Office Washington DWQ Regional Office Central Files File Copy N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality 11318 Customer Service 4 Onn Ono -l AO Lt Col Michael J. Coats 021318 1 2 AUG 2002 DEPARTMENT OF THE AIR FORCE 4TH FIGHTER WING (ACC) SEYMOUR JOHNSON AIR FORCE BASE NC Commander, 4th Civil Engineer Squadron 1095 Peterson Avenue Seymour Johnson AFB NC 27531-2355 Mr. John Dorney Division of Water Quality 401 Wetlands Unit 2321 Crabtree Blvd Raleigh, NC 27604-2260 Dear Mr. Dorney ??, 1100 ?F Please find attached the seven required copies of the Pre-Construction Notification (PICK Application Form for installation of a culvert under Alligator Road at the US Air Force Dare County Bomb Range. The corrugated aluminum culvert will measure 40 feet long and 72 inches in diameter and will be installed under Alligator Road just east of the intersection with Dry Ridge (see maps attached to the application package). This action will restore the natural hydrological regime to approximately 2,500 acres of wetland and will enhance the growth of the indigenous tree species. Alligator Road functions currently as a dam. The free flow of water was interrupted by the historical construction of this road and the forest on both sides of the road is stressed under the current unnatural hydrological conditions. The culvert will ensure water flow between the two sides of the road and a control structure will allow for manipulating the flow during drought conditions or during fire fighting events. Approximately 1,000 acres of the affected wetland are located north of Alligator Road and 800 acres of this area are located in the neighboring US Fish and Wildlife Service's Alligator River National Wildlife Refuge. Coordination with the refuge manager on this issue has been conducted. The North Wetland Area will receive increased hydrology. Approximately 1,500 acres of the affected wetland are located south of Alligator Road and the South Wetland Area will receive decreased hydrology. We expect a significant increase in tree seedling survival and growth rate of the forest after the hydrology has been restored. This action is exempt from US Army Corps of Engineer Permit requirements due to the silviculture exemption regulation (Section 404(f) of the Clean Water Act). yr , Q 4( The required check in the amount of $475.00 for the Section 401 water quality certification is attached to the front of this package. If you need further information, please do not hesitate to call Dr. Johanna E. Arnold in the Environmental Management Office at (919) 722-5168. Sincerely MICHAEL J. COATS, Lt Col, USAF Attachment: PCN Application Package (7) cc: Mike Bryant, Alligator River National Wildlife Refuge Caroline Bellis, NC Division of Coastal Management Office Use Only: Form Version October 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. t r r 1. Processing ,1. Check all of the approval(s) requested for this project: ? Section 404 Permit ; ? Section 10 Permit x 401 Water Quality Certification Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: none, silviculture exemption 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: LtCol Michael J. Coats Mailing Address: 4 CES/CC 1095 Peterson Avenue Seymour Johnson AFB, NC 27531-2355 Telephone Number: (919) 722-5168 Fax Number: (919) 722-5179 E-mail Address: michael.coats@seymourjohnson.af.mil 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17- inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Install Culvert under Alligator Road to restore natural hydrology 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: Dare Nearest Town: Engelhard Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Hwy 264 East from Engelhard 15 Miles to Air Force Stomper Road Site coordinates, if available (UTM or Lat/Long): (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Buffer zone between USAF and Navy Impact areas; general forest management and timber harvest. 7. Property size (acres): Dare County Bomb Range is 46,624 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): Stumpy Point Bay and Alligator River 9. River Basin: Pasquotank (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/mal)s/.) Page 6 of 12 10. Describe the purpose of the proposed work: This project will restore the natural hydrology of approximately 2,500 acres of wetlands. The culvert will have a control structure attached to regulate the flow of water. 11. List the type of equipment to be used to construct the project: Dumptruck, sackhoe; one 40' aluminum culvert (72" diameter) with flow-control devices will be installed under Alligator Road just east of intersection with Dry Ridge South as shown on the attached map. 12. Describe the land use in the vicinity of this project: General forest and wildlife management (timber harvest and huntinq). IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Section 404 permit not required: silviculture exemption. Prior hydrology restoration culverts project: Nationwide Permit 27 (USACE Action ID: 199911227, DWQ Project Number: 02-0858) V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: The intention is to restore the altered hydrology of the area. Culverts have been installed in the past in conjunction with the Alligator River National Wildlife Refuge. This is a very complex project and the exact outcome of this culvert installation on the hydrology will be assessed. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to cbtermine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** North increase Hydrology 1,000.00 Yes 18000 Forested Wetland South decrease Hydrology 1,500.00 Yes 18000 Forested Wetland I * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, d itching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online athttl2://www.fema.Lov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Approximately 46,600 Total area of wetland impact proposed: 2500 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both stricture and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1.800-358-9616, or online at www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.tonozone.com www.manyuest coin etc.). Cumulative impacts (linear distance in feet) to all streams on site: None Page 8 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): None Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmj;ide.htil-il. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. ThiGTnrn'art is an nn-qnOn? hV rirningV rPStnratinn prniPrt unriPrtnkan with Allinatnr Ci inioV nnrl NC' StatA i inlyPrClty 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wro/index,htm If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of' public (federal/state/local) land? Yes Q No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation Yes ? No El If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. 7_one* Impact (square feet Multiplier Required Mitigation l 3 2 1.5 Total Gone t ex[ enus out su teet perpenuicutar from near oanK of enannei; Lone L excenus an additional 20 feet from the edge of Zone 1. Page I 1 of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213.0242 or .0260. X1. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. X1II. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No ? Is this an after-the- fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 29-Jul-2002 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 Albernarl a S GN ound N Devil Hills Nags C' Head Manteo r.; Mann , US H?Ny Harbo 64 1? j ; t . Wanchese ITI Dare Stumpy Range • Point I Dare County Range Location Map • Towns Dare Range Transportation US Highway State Highway Ferry NC Counties 2 0 2 4 8 8 10 Miles Bob Hesellon 4 CES / CEV 22 Sept 2000 Engelhard Cape va966 ` Hatteras ifg ?n? ? .1.. F s 4 Cn D 2 -C N a` *?i N ?E U_ S_ AIR FORCE BOMBING RANGE Office Use Only: Form Version October 2001 USACE Action ID No. DWQ No. 0,2 O If any particular item is not applicable to this project, please enter "Not Applicable" "N/A" rather than leaving the space blank. 1. Processing ter,%f % 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ?x 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: none, silviculture exemption 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: LtCol Michael J. Coats Mailing Address: 4 CES/CC 1095 Peterson Avenue Seymour Johnson AFB, NC 27531-2355 Telephone Number: (919) 722-5168 Fax Number: (919) 722-5179 E-mail Address: michael.coats@seymourjohnson.af.mil 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Install Culvert under Alligator Road to restore natural hydrology 2. T.I.P. Project Number or State Project Number (NCDOT Only 3. Property Identification Number (Tax PIN): 4. Location County: Dare Nearest Town: Engelhard Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Hwy 264 East from Engelhard 15 Miles to Air Force Stomper Road 5. Site coordinates, if available (UTM or Lat/Long): (Note - if project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Buffer zone between USAF and Navy Impact areas; general forest management and timber harvest. 7. Property size (acres): Dare County Bomb Range is 46,624 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): Stumpy Point Bay and Alligator River 9. River Basin: Pasquotank (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 6 of 12 10. Describe the purpose of the proposed work: This project will restore the natural hydrology of approximately 2,500 acres of wetlands. The culvert will have a control structure attached to regulate the flow of water. 11. List the type of equipment to be used to construct the project: Dumptruck, Backhoe; one 40' aluminum culvert (72" diameter) with flow-control devices will be installed under Alligator Road just east of intersection with Dry Ridge South as shown on the attached map. 12. Describe the land use in the vicinity of this project: General forest and wildlife management (timber harvest and hunting). 1V. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Section 404 permit not required: silviculture exemption. Prior hydrology restoration culverts project: Nationwide Permit 27 (USACE Action ID: 199911227, DWQ Project Number: 02-0858) V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: The intention is to restore the altered hydrology of the area. Culverts have been installed in the past in conjunction with the Alligator River National Wildlife Refuge. This is a very complex project and the exact outcome of this culvert installation on the hvdroloav will be assessed. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to &termine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** North increase Hydrology 1,000.00 Yes 18000 Forested Wetland South decrease Hydrology 1,500.00 Yes 18000 Forested Wetland * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, d itching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online athttl2:Hwww.fema.cov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Approximately 46,600 Total area of wetland impact proposed: 2500 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1.800-358-9616, or online at www.uses.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.egM www.manauest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: None Page 8 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): None Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.htiiil. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. ThicT13rnjart is an nn-pnincl hV rirnlnq rPCtnratinn plnePrt iindPrtakPn with Allinatnr -SurVPV and tir^ 5;tMP I InoyiometV 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at httn://h2o.enr.state.nc.tis/wrn/index,litm If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres):, Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation Yes ? No EJ If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII- above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No EJ if you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total Zone I extends out .ill feet perpendicular from near banK of cnannet; tone z exfenus an additional 20 feet from the edge of Zone 1. Page I l of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (DWQ Only) Describe impervious acreage Discuss stormwater controls downstream from the property. (both existing and proposed) versus total acreage on the site. proposed in order to protect surface waters and wetlands XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XII1. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No ? Is this an after-the- fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 29-Jul-2002 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Pagc 12 of 12 Albemarle S N? Co mbia G Sound N Devil ty Hills T P Nags Head f Manteo Mann: US HWY 64 Harbo Wanchese Dare Stumpy Range • Point i. ! Dare County Range Location Map • Towns Dare Range Transportation ?V, US Highway State Highway Ferry NC Counties 2 0 2 4 8 8 10 Mlles Bob Heselton 4 CES / CEV 22 Sept 2000 Engelhard N. Cape Hatteras (x_45 \a ?.,, t ? A h ?. 9. : ,o CD n N N U_ S_ AIR FORCE BOMBING RANGE Office Use Only: Form Version October 2001 USACE Action ID No. DWQ No. - l 2 2 ? n If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ?x 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: LtCol Michael J. Coats Mailing Address: 4 CES/CC 1095 Peterson Avenue Seymour Johnson AFB, NC 27531-2355 Telephone Number: (919) 722-5168 Fax Number: (919) 722-5179 E-mail Address: michael.coats@seymourjohnson.af.mil 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address:_ Telephone Number: Fax Number: E-mail Address: Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USsACE requires information to be submitted on sheets no larger than 11 by 17-inch format; Mwever, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Install Culvert under Alligator Road to restore natural hydrology 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: Dare Nearest Town: Engelhard Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Hwy 264 East from Engelhard 15 Miles to Air Force Stomper Road 5. Site coordinates, if available (UTM or Lat/Long): (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Buffer zone between USAF and Navy Impact areas; general forest management and timber harvest. 7. Property size (acres): Dare County Bomb Range is 46,624 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): Stumpy Point Bay and Alligator River 9. River Basin: Pasquotank (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 6 of 12 10. Describe the purpose of the proposed work: This project will restore the natural hydrology of approximately 2,500 acres of wetlands. The culvert will have a control structure attached to regulate the flow of water. 11. List the type of equipment to be used to construct the project: Dumptruck, sackhoe; one 40' aluminum culvert (72" diameter) with flow-control devices will be installed under Alligator Road just east of intersection with Dry Ridge South as shown on the attached map. 12. Describe the land use in the vicinity of this project: General forest and wildlife management (timber harvest and hunting). IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Section 404 permit not required: silviculture exemption. Prior hydrology restoration culverts project: Nationwide Permit 27 (USACE Action ID: 199911227, DWQ Project Number: 02-0858) V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: The intention is to restore the altered hydrology of the area. Culverts have been installed in the past in conjunction with the Alligator River National Wildlife Refuge. This is a very complex project and the exact outcome of this culvert installation on the hydrology will be assessed. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** North Increase Hydrology 1,000.00 Yes 18000 Forested Wetland South decrease Hydrology 1,500.00 Yes 18000 Forested Wetland * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, nu, excavation, flooding, d itching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year tloodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online athttp://www.fema,uov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Approximately 46,600 Total area of wetland impact proposed: 2500 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1,800-358-9616, or online at www.uses. ,oovv. Several internet sites also allow direct download and printing of USGS maps (e.g., www,topozone.com www.manguest.com etc.). Cumulative impacts (linear distance in feet) to all streams on site: None Page 8 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation if construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): None Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. This p ert is an nn-nninn hV rdrningV rPStnrntinn nrniPrt iinr1PrdakPn with Allinatnr -RoveiN?tinnalVVeldivi?Re-filg.e -loent partners also the I IS Geologic Si irvpV and Nr' StntP l InivPrSitV- 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http:Hh2o.enr.state.nc.tis/wrp/index.htm If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ?Q No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation Yes ? No El If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation I 3 2 1.5 Total Lone t ext enus out sv teet perpenaicuiar from near nanK or cnannei; cone / extenus an additional 20 feet from the edge of Zone 1. Page 1 I of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. X1. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIIl. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 429-Jul-2002 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 G Albemarle Sound Irx N Devil Hills ` '?,• Nags Ct Head S N r?> ~' Manteo Co mbia Mann . US HWy 64 Harbo , Wanchese Dare Range Stumpy Point 'D J ? t Kt'J???tt?aiktt Engelhard rv Dare County Range Location Map • Towns = Dare Range Transportation I US Highway N State Highway Ferry NC Counties 2 0 2 4 6 8 10 Mlles Bob Hesellon 4 CES / CEV 22 Sept 2000 Cape Hatteras N E e 1 1 AIR FC` Pr-.F ROMRItiC= RdAIC=l= Office Use Only: rr^?? Form Version October 2001 USACE Action ID No. DWQ No. U 3 g 1 8 If any particular item is not applicable to this project, please enter "Not Applicable" or ':&A" rather than leaving the space blank. 0,\ 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit 19 , ? Section 10 Permit ??:?Tlq <090 Q 401 Water Quality Certification??? ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: none, silviculture exemption 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: LtCol Michael J. Coats Mailing Address: 4 CES/CC 1095 Peterson Avenue Seymour Johnson AFB, NC 27531-2355 Telephone Number: (919) 722-5168 Fax Number: (919) 722-5179 E-mail Address: michael.coats@seymourjohnson.af.mil 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than I1 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Install Culvert under Alligator Road to restore natural hydrology 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: Dare Nearest Town: Engelhard Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Hwy 264 East from Engelhard 15 Miles to Air Force Stomper Road Site coordinates, if available (UTM or Lat/Long): (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Buffer zone between USAF and Navy Impact areas; general forest management and timber harvest. 7. Property size (acres): Dare County Bomb Range is 46,624 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): Stumpy Point Bay and Alligator River 9. River Basin: Pasquotank (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 6 of 12 10. Describe the purpose of the proposed work: This project will restore the natural hydrology of approximately 2,500 acres of wetlands. The culvert will have a control structure attached to regulate the flow of water. 11. List the type of equipment to be used to construct the project: Dumptruck. Backhoe: one 40' aluminum culvert (72" diameter) with flow-control devices will be installed under Alligator Road just east of intersection with Dry Ridge South as shown on the attached map. 12. Describe the land use in the vicinity of this project: General forest and wildlife management (timber harvest and hunting). 1V. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Section 404 permit not required: silviculture exemption. Prior hydrology restoration culverts project: Nationwide Permit 27 (USACE Action ID: 199911227, DWQ Project Number: 02-0858) V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: The intention is to restore the altered hydrology of the area. Culverts have been installed in the past in conjunction with the Alligator River National Wildlife Refuge. This is a very complex project and the exact outcome of this culvert installation on the hydrology will be assessed. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** North increase Hydrology 1,000.00 Yes 18000 Forested Wetland South decrease Hydrology 1,500.00 Yes 18000 Forested Wetland * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, rut, excavation, flooding, d itching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year tloodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at t]?p://www.fema.aov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Approximately 46,600 Total area of wetland impact proposed: 2500 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.us *s.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone,cotry www.mapguest.cotn etc.). Cumulative impacts (linear distance in feet) to all streams on site: None Page 8of12 Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): None Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.htm]. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. This T rniert is an nn-gninq hyTrnlnq rastnratinn prn*Pnt unrlartakPn with Allinat? nr P Joint partners als I;i irvpv and NC State l lnivPrSitV 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http;//h2o.enr.state.m.us/wrp/index.litm If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes F No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)'? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation Yes ? No M If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No M If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Miti ation l 3 2 1.5 Total Zone I extends out su teet perpenatcuiar from near oanK of cnannei; Lone L exrenus an additional 20 feet from the edge of Zone 1. Page 1 l of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. X1. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ?29-Jul-2002 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 Albs arleo bia OUnd ME 64 Ha Dare Range Dare County Range Location Map • Towns Dare Range Transportation US Highway State Highway Ferry NC Counties 2 0 2 4 B 8 10 Mlles ONNOR Bob Heseltan 4 CES / CEV 22 Sept 2a00 GN Devil Hills `?. }VC/ N Nags t? Head Manteo %nchese Stumpy • Point FERRO Cape Hatteras CO D n? 2 N Engelhard e? N II S LAIR FORCE ROMRING RANGE Form Veersion October 2001 Office Use Only: 021318 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or!'N/A" rather than leaving the space blank. ss' 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit Q 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: none, silviculture exemption 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: LtCol Michael J. Coats Mailing Address: 4 CES/CC 1095 Peterson Avenue Seymour Johnson AFB, NC 27531-2355 Telephone Number: (919) 722-5168 Fax Number: (919) 722-5179 E-mail Address: michael.coats@seymourjohnson.af.mil 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Install Culvert under Alligator Road to restore natural hydrology 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: Dare Nearest Town: Engelhard Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Hwy 264 East from Engelhard 15 Miles to Air Force Stomper Road 5. Site coordinates, if available (UTM or Lat/Long): (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Buffer zone between USAF and Navy Impact areas; general forest management and timber harvest. 7. Property size (acres): Dare County Bomb Range is 46,624 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): Stumpy Point Bay and Alligator River 9. River Basin: Pasquotank (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 6 of 12 10. Describe the purpose of the proposed work: This project will restore the natural hydrology of approximately 2,500 acres of wetlands. The culvert will have a control structure attached to regulate the flow of water. 11. List the type of equipment to be used to construct the project: Dumptruck, Backhoe; one 40' aluminum culvert (72" diameter) with flow-control devices will be installed under Alligator Road just east of intersection with Dry Ridge South as shown on the attached map. 12. Describe the land use in the vicinity of this project: General forest and wildlife management (timber harvest and hunting). IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Section 404 permit not required: silviculture exemption. Prior hydrology restoration culverts project: Nationwide Permit 27 (USACE Action ID: 199911227, DWQ Project Number: 02-0858) V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: The intention is to restore the altered hydrology of the area. Culverts have been installed in the past in conjunction with the Alligator River National Wildlife Refuge. This is a very complex project and the exact outcome of this culvert installation on the hvdroloov will be assessed. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to cbtermine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** North increase Hydrology 1,000.00 Yes 18000 Forested Wetland South decrease Hydrology 1,500.00 Yes 18000 Forested Wetland * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, d itching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA -approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online athttn://www,fema.Lov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Approximately 46,600 Total area of wetland impact proposed: 2500 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent'? leasespecify) None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both stricture and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1.800-358-9616, or online at www.usgti.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.tonozone.com, www.manauest.com etc.). Cumulative impacts (linear distance in feet) to all streams on site: None Page 8 of 12 Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): None Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Thi-prn*iPrt is an nn-nn iq hvrtrnlnnv ractnratinn nrn*pf t iind@rtakan with Allinatnr Si irvav and NC. Stntp l lnlvtnralty 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at httn://h2o.enr.state.nc.us/wrp/index.htm If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ?x No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation Yes ? No M If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No EJ If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation I 3 2 1.5 Total ' Zone I ext ends out SU teet perpenutcutar from near oanK or atannei; cone z extenus an additional 20 feet from the edge of Zone 1. Page I I of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No ? Is this an after-the- fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 29-Jul-2002 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Pagc 12 of 12 Albemarle I L,_ G Sound N Devil q> Hills Nags Head r? Manteo Mann US HWy 64 Harbo = 5-? 55? Wanchese Dare ; tumpy Range Point Dare County Range Location Map • Towns 0 Dare Range Transportation US Highway State Highway Ferry NC Counties 2 0 2 4 0 B 10 Mlles Bob Hesellon 4 CES I CEV 22 Sept 2000 Engelhard 4 Cape FERRO ?/i Hatteras ?D rt? 2 -C N N 11 AIR FORC`_F ROMRINn RAAInF Office Use Only: r? i Form Version October 2001 USACE Action ID No. DWQ No. 0 C f J L ,L If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: - ? Section 404 Permit ? Section 10 Permit Q 401 Water Quality Certification ?. ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: none, silviculture exemption 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: LtCol Michael J. Coats Mailing Address: 4 CES/CC 1095 Peterson Avenue Seymour Johnson AFB, NC 27531-2355 Telephone Number: (919) 722-5168 Fax Number: (919) 722-5179 E-mail Address: michael.coats@seymourjohnson.af.mil 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than I1 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Install Culvert under Alligator Road to restore natural hydrology 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: Dare Nearest Town: Engelhard Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Hwy 264 East from Engelhard 15 Miles to Air Force Stomper Road 5. Site coordinates, if available (UTM or Lat/Long): (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Buffer zone between USAF and Navy Impact areas; general forest management and timber harvest. 7. Property size (acres): Dare County Bomb Range is 46,624 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): Stumpy Point Bay and Alligator River 9. River Basin: Pasquotank (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 6 of 12 10. Describe the purpose of the proposed work: This project will restore the natural hydrology of approximately 2.500 acres of wetlands. The culvert will have a control structure attached to reaulate the flow of water. 11. List the type of equipment to be used to construct the project: Dumptruck, sackhoe; one 40' aluminum culvert (72" diameter) with flow-control devices will be installed under Alligator Road just east of intersection with Dry Ridge South as shown on the attached map. 12. Describe the land use in the vicinity of this project: General forest and wildlife management (timber harvest and hunting). IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Section 404 permit not required: silviculture exemption. Prior hydrology restoration culverts project: Nationwide Permit 27 (USACE Action ID: 199911227, DWQ Project Number: 02-0858) V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: The intention is to restore the altered hydrology of the area. Culverts have been installed in the past in conjunction with the Alligator River National Wildlife Refuge. This is a very complex project and the exact outcome of this culvert installation on the hydrology will be assessed. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to cbtermine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** North increase Hydrology 1,000.00 Yes 18000 Forested Wetland South decrease Hydrology 1,500.00 Yes 18000 Forested Wetland * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, till, excavation, flooding, d itching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA -approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online athttp://www.fema.Lov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Approximately 46,600 Total area of wetland impact proposed: 2500 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1800-358-9616, or online at www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.minguest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: None Page 8 of 12 Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): None Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal. Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.ne. us/ncwetlands/strmaide.htm1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Thia nrneprt iG an nn-gninn hvrlrnlnnv rpotnratinn prnwp-rt tinrtartakPn with Allinatnr C- uryp and tir State l lnivPrsity 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at htto://h2o.enr.state.tic.us/wrp[index.litm If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ?x No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 "Total ' Zone I extends out JO tcet perpendicular trorn near bank of ctlaRnCl; Gone t extends an additional 20 feet from the edge of Zone 1. Page I l of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213.0242 or .0260. Xl. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater -generated from the proposed project, or available capacity of the subject facility. XII1. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 29-Jul-2002 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 G N A`bernarle Sound N Devil Hills Nags Head S H Co mbia Mann Manteo ti US HWy 64Harbo Q) (' .. Wanchese Dare Range Stumpy • Point 0) y Engelhard Dare County Range Location Map • Towns Dare Range Transportation ^/ US Highway /V State Highway "Ferry NC Counties 2 0 2 4 8 8 10 Mlles Bob Heselton 4 CES / CEV 22 Sept 2000 CX I EeW / Cape Hatteras N --- E L U S SIR FOR?CR ROMRIAIn R KInF Office Use Only: Form Version October 2001 USACE Action ID No. DWQ No. 0,2 13 1 a If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ?x 401 Water Quality Certification ,.r ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: none, silviculture exemption 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: LtCol Michael J. Coats Mailing Address: 4 CES/CC 1095 Peterson Avenue Seymour Johnson AFB, NC 27531-2355 Telephone Number: (919) 722-5168 Fax Number: (919) 722-5179 E-mail Address: michael.coats@seymourjohnson.af.mil 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Page 5 of 12 Fax Number: III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Install Culvert under Alligator Road to restore natural hydrology 2. T.I.P. Project Number or State Project Number (NCDOT Only Property Identification Number (Tax PIN): 4. Location County: Dare Nearest Town: Engelhard Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Hwy 264 East from Engelhard 15 Miles to Air Force Stomper Road 5. Site coordinates, if available (UTM or Lat/Long): (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Buffer zone between USAF and Navy Impact areas; general forest management and timber harvest. 7. Property size (acres): Dare County Bomb Range is 46,624 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): Stumpy Point Bay and Alligator River 9. River Basin: Pasquotank (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/mays/.) Page 6 of 12 10. Describe the purpose of the proposed work: This project will restore the natural hydrology of approximately 2,500 acres of wetlands. The culvert will have a control structure attached to regulate the flow of water. 11. List the type of equipment to be used to construct the project: Dumptruck, Backhoe; one 40' aluminum culvert (72" diameter) with flow-control devices will be installed under Alligator Road just east of intersection with Dry Ridge South as shown on the attached map. 12. Describe the land use in the vicinity of this project: General forest and wildlife management (timber harvest and huntincq). IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Section 404 permit not required: silviculture exemption. Prior hydrology restoration culverts project: Nationwide Permit 27 (USACE Action ID: 199911227, DWQ Project Number: 02-0858) V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: The intention is to restore the altered hydrology of the area. Culverts have been installed in the past in conjunction with the Alligator River National Wildlife Refuge. This is a very complex project and the exact outcome of this culvert installation on the hydrology will be assessed. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to d;termine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** North increase Hydrology 1,000.00 Yes 18000 Forested Wetland South decrease Hydrology 1,500.00 Yes 18000 Forested Wetland * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, till, excavation, flooding, d itching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online athttn://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Approximately 46,600 Total area of wetland impact proposed: 2500 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usg_s.g_o_v. Several internet sites also allow direct download and printing of USGS maps (e.g., www.tooozone.com www.mapguest.coM etc.). Cumulative impacts (linear distance in feet) to all streams on site: None Page 8 of 12 Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): None Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at httl2://h2o.enr.state.nc.us/ncwetlands/strmgide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. The-, nrnipnt ie an nn-nninq hVrJrningV rPCtnrntinn 13rniPrt unriPrtakPn with Alligntnr ii vP anri NC' States I1niyPrsity 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrn/index.htm If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total Gone t extenas our w reef perpenareuiar rrom near uanK or cnannciI c,une c cnwnus an additional 20 feet from the edge of Zone 1. Page 1 I of 12 A '1 ! ili ; If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No ? Is this an after-the- fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 29-Jul-2002 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 Albemarle ,j !Y_ (TS Ci) Dare County Range Location Map • Towns Dare Range Transportation US Highway State Highway Ferry NC Counties 2 0 2 4 8 8 10 Mlles Bob Heselton 4 CES / CEV 22 Sept 2000 G Sound y?? Devil Hills (& Nags C> Head Manteo Mann HWY 64 Harbo Wanchese Dare Stumpy Range • Point OF Engelhard J J. _ i .. FE?R? C / Cape Hatteras rn D 64 2 N N 0 C?= r1?c1, I N --- E 1 L1 S SIR FORCF RC'3MRIAIC; RAKIrF