NORTH CAROLINA
Environmental Quality
June 21, 2019
LETTER OF APPROVAL
RE: Project Name: Longwood Crossing Lots 8-14
Acres Approved. 1.9
Project ID: HOKE-2019-029
County: Hoke City: McLauchlan Twsp.
Address: Rockfish Road
River Basin: Cape Fear
Stream Classification: Other
Submitted By: 4D Site Solutions, Inc.
Date Received by LQS: June 11, 2019
Plan Type: New —Residential
Dear Ms. Mohler:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
and herebyissue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site.
This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been
undertaken, as is required by Title 15A NCAC 413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of
any land disturbing activity on the above -named project. The NOI farm may be accessed at dcg.nc.gov/NCG0 L
Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.goy or Paul Clark at
Paul. clark( ,ncdenr. gov. After you submit a complete and correct NOI Form, a COC will be emailed to you
within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit.
However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
/�-;;A2North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
[r/' D •Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NORTH CAROUNA
910.433.3300
Mohler Homes, Inc.
June 21, 2019
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file
at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO 1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act
of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval. "
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land -disturbance, as called for on the application
plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would
require a revised plan and additional application fee. Any addition in impervious surface, over that already
noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion
control measures and the stormwater retention measures. (GS 113A-54.1(b)). In addition, it would be helpful
if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Timothy L. LaBounty, P.E.
Regional Engineer
DEMLR
Enclosures: North Carolina SPCA Certificate of Approval
cc: 4D Site Solutions, Inc. - via email
Andy Conner, Hoke County - via email
Fayetteville Regional Office — DEMLR file