Loading...
HomeMy WebLinkAboutNCC201227_ESC Approval Submitted_20200408ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director Mohler Homes, Inc. Attn: Lorraine Mohler, President 2148 Rim Road Fayetteville, NC 28314 NORTH CAROLINA Environmental Quality June 21, 2019 LETTER OF APPROVAL RE: Project Name: Longwood Crossing Lots 8-14 Acres Approved. 1.9 Project ID: HOKE-2019-029 County: Hoke City: McLauchlan Twsp. Address: Rockfish Road River Basin: Cape Fear Stream Classification: Other Submitted By: 4D Site Solutions, Inc. Date Received by LQS: June 11, 2019 Plan Type: New —Residential Dear Ms. Mohler: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and herebyissue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI farm may be accessed at dcg.nc.gov/NCG0 L Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.goy or Paul Clark at Paul. clark( ,ncdenr. gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. /�-;;A2North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources [r/' D •Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 NORTH CAROUNA 910.433.3300 Mohler Homes, Inc. June 21, 2019 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. " Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Timothy L. LaBounty, P.E. Regional Engineer DEMLR Enclosures: North Carolina SPCA Certificate of Approval cc: 4D Site Solutions, Inc. - via email Andy Conner, Hoke County - via email Fayetteville Regional Office — DEMLR file