Loading...
HomeMy WebLinkAbout20080182 Ver 2_Certification of Completion_20091119NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue. Coleen H. Sullins Governor Director Natural Resources Dee Freeman Secretary DWQ Project No.: 04b" 01e2 WW2county: wot.ke Applicant: t'tis+ry1 W?Aa??,n 5 Project Name: ?NaktYlut Date of Issuance of 401 Water Quality Certification: Certificate of Completion # r-1- t&[?RQ?rl NVETLANC S ANpWATER ? AL-Ty ?+wA?e??wc>i Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, Kt'i Sttp Owl AA iris , hereby state that, to the best of my abilities, due care and diligence was used in the observation dtihe construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: - ?? Date: ?'? • 09 Agent's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, , as a duly registered Professional y (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Suite 250, Raleigh, North Carolina 27604-2260 One Phone; 919-733-17861 FAX: 919-733-68931 Customer Service; 1.877-623.6748 NorthCarolina Internet: http:/lh2o.enr.state.nc.us/ncwetlands ;Vatulrailff An Equal Opportunity 1 Affirmative Action Employer LETTER OF TRANSMITTAL TOWN OF CARY ENGINEERING DEPARTMENT TO: Ms. Coleen H. Sullins 401 Oversight/Express Review Permitting Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 SUBJECT: Walnut St. Park - Certificate of Completion PROJECT NO.: Town of Cary Project No. PR1084 DWQ Project No. 08-0182, Ver. 2 DATE: November 17, 2009 WE TRANSMIT ? Attached ® As Requested ? Under Separate Cover Via ? FOR YOUR ® Approval ? Review & Comment ? Information ? THE FOLLOWING ? Drawings ® Reproducibles ? Specifications ? Prints COPIES SHEET NO. REVISION DATE DESCRIPTION 1 Certificate of Completion for DWQ Proiect No. 08-0182, Ver. 2 COMMENTS: Please let me know if you have any questions. BY: ?A?` 1 ? Icc?.?.? Kristen Dwiggins, P.E. Transportation Engineering Supervisor Phone: 919-432-3930 Email: kristen.dwiggins@townofcary.org