HomeMy WebLinkAbout20080182 Ver 2_Certification of Completion_20091119NCDENR
North Carolina Department of Environment and
Division of Water Quality
Beverly Eaves Perdue. Coleen H. Sullins
Governor Director
Natural Resources
Dee Freeman
Secretary
DWQ Project No.: 04b" 01e2 WW2county: wot.ke
Applicant: t'tis+ry1 W?Aa??,n 5
Project Name: ?NaktYlut
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
# r-1- t&[?RQ?rl
NVETLANC S ANpWATER ? AL-Ty
?+wA?e??wc>i
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ
by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from
all of these.
Applicant's Certification
1, Kt'i Sttp Owl AA iris , hereby state that, to the best of my abilities, due care and diligence
was used in the observation dtihe construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature: - ?? Date: ?'? • 09
Agent's Certification
1, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
1, , as a duly registered Professional
y (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature Registration No.
Date
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Suite 250, Raleigh, North Carolina 27604-2260 One
Phone; 919-733-17861 FAX: 919-733-68931 Customer Service; 1.877-623.6748 NorthCarolina
Internet: http:/lh2o.enr.state.nc.us/ncwetlands ;Vatulrailff
An Equal Opportunity 1 Affirmative Action Employer
LETTER OF TRANSMITTAL
TOWN OF CARY
ENGINEERING DEPARTMENT
TO: Ms. Coleen H. Sullins
401 Oversight/Express Review Permitting Unit
North Carolina Division of Water Quality
1650 Mail Service Center
Raleigh, NC 27699
SUBJECT: Walnut St. Park - Certificate of Completion
PROJECT NO.: Town of Cary Project No. PR1084
DWQ Project No. 08-0182, Ver. 2
DATE: November 17, 2009
WE TRANSMIT
? Attached
® As Requested
? Under Separate Cover
Via
?
FOR YOUR
® Approval
? Review & Comment
? Information
?
THE FOLLOWING
? Drawings
® Reproducibles
? Specifications
? Prints
COPIES
SHEET
NO. REVISION
DATE
DESCRIPTION
1 Certificate of Completion for DWQ
Proiect No. 08-0182, Ver. 2
COMMENTS: Please let me know if you have any questions.
BY: ?A?` 1 ? Icc?.?.?
Kristen Dwiggins, P.E.
Transportation Engineering Supervisor
Phone: 919-432-3930
Email: kristen.dwiggins@townofcary.org