HomeMy WebLinkAbout330067_Plan of Action_20200228PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES �p��I+
d Z)
cility Number: 3,;11- -
cility Name:
rtified Operator Name: ,_ T. Brewer
County: Edgecombe
Operator #
Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1
.agoon Namelidentifier (ID):
ipillway (Yes or No):
.eves (inches); l
Check all applicable items
Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges_
—X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
. Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to Ugnsfer of
waste to a site not covered In the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
Earliest possible date to begin land application of waste: _Currently Applying_
ereby certify that I have reviewed the information listed above and included within the attached Plan
Action, and to the best of my knowledge and ability, the Information is accurate and correct
Phone. �� - o�� 1 • ��
Facility Owner/Manager (print)
q�7—�' Date:
Facility Owner/Manager (signature)
A Cover Page 2121100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): 3%- 0 gre(,w- -n�
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
l� = V
�
a.
current liquid level according to marker
inches
�
b.
designed 25 yr./24 hr. storm &structural freeboard
o
inches
c.
line b - line a (inches in red zone) W
�
inches
d.
top of dike surface area according to design
ft2
(area at below structural freeboard elevation)
e.
line c x line d x 7.48 allons
gallons
12 ft3
3. Projected volume of waste liquid produced during draw down period
f.
temporary storage period according to structural design
! "
days
35 �61.3
g.
volume of waste produced according to structural design
ft3
h.
actual waste produced = current herd # x line g =
� � s b � • �
ft3
certified herd #
i.
volume of wash water according to structural design
b
ft3
j.
excess rainfall over evaporation according to design
a � ��S •��
ft3
k.
(lines h + i +i) x 7.48 x 30 days =
57
�b3 �. gallons
line f
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2121100 1
1. structure ID: I line m = t/()7 ') � Ib PAN
2.
structure ID:
line m =
lb PAN
3.
structure ID:
line m =
lb PAN
4.
structure ID:
line m =
lb PAN
5.
structure ID:
line m =
lb PAN
6.
structure ID:
line m =
lb PAN
n.
lines 1+2+3+4+5+5 -
�10�-D-b
lb PAN
TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
rtrcwU. uU
NUT 1-154 PILLUS TO WHICH PAN CAN NOT BE APPLIES DURING
THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(lbs•)
column r x s
u.
application
window'
a�1
i3
_
y
09
'State current crOD ending application
date or next crop application
heninninn date fnr availnhlp rprpivinn rmns
during 30 day drawn down period
v. Total PAN available for all fields (sum of column Q _ y . Wlb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (tine n from section 11) = Vo Ib. PAN
PoA (30 Day) 2121100 2
x. Crop's remaining PAN balance (line v from section III) ¢ J9, lb. PAN
y. Overall PAN balance (w - x) lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
PoA (30 Day) 2121100 3