Loading...
HomeMy WebLinkAboutNC0020451_Inspection_20200407ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality April 7, 2020 Mr. Brandon Patrick, Pretreatment Coordinator PO Box 490 West Jefferson, NC 28694 SUBJECT: Pretreatment Compliance Inspection Report Town of West Jefferson NPDES# NCO020451 Ashe County Dear Mr. Patrick: On March 24, 2020, Paul DiMatteo of the Division of Water Resources, Winston-Salem Regional Office conducted a Pretreatment Compliance Inspection at the above referenced wastewater treatment system. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which included: reviewing the files, POTW plant performance, sampling and compliance judgement program, and adherence to the Enforcement Response Plan. Background The Town operates one 0.5 MGD facility and has 1 significant industrial user (SIU). POTW Interview There was one NPDES permit limit violation for copper in October 2019. Mr. Patrick indicated that he was concerned about illegal dumping and noted that there was a hit for the same parameter at the same time the year before. Mr. Powell said he has not had issues implementing the pretreatment program. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted for on February 6, 2019 and approved on March 4, 2019. The next HWA is due on April 1, 2024. The City's last Industrial Waste Survey (IWS) was submitted on March 25, 2019 and was approved on July 11, 2019. The next IWS is due April 1, 2024. The last Short -Term Monitoring Plan (STMP) was submitted on March 25, 2019 and approved on July 11, 2019. D � North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office [ 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 NOh �HCARO UHA ^^ •^ �ku^m I u�•i` r 336.776.9800 The Sewer Use Ordinance (SUO) was approved on January 10, 2013. The ERP was approved on May 26, 2017. STMP Review The STMP is not currently being conducted. Industrial User Permit (IUP) File Review A review of the files for Ashe County Cheese (#0003) revealed that monitoring data was well organized and violations were addressed in a timely manner consistent with the ERP. The slug control plan was in good order. If you have any questions, please contact Paul DiMatteo at (336) 776-9691 or Paul.Dimatteo(&ncdenr.aov; or our office at (336) 776-9800. Sincerely, DocuSigned by: �� z SmJtr 1-"49E225C94EA... Lon T. Snider, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO cc: DWR Laserfiche Files NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Waterkesaurces ENVIRONMENTAL OVAL I TY BACKGROUND INFORMATION 1Comnlete Prior To PCI: Review Program Info Database Sheets 1. Control Authority (POTW) Name: West Jefferson 2. Control Authority Representative(s): _Brandon Patrick 3. Title(s): WWTP ORC/Pretreatment Coordinator 4. Last Inspection Date: 3/12/2019 Inspection Type (Check One): ❑ PCI ® Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ❑ YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO ICIS CODING Main Program Permit Number MM/DD/YY N I C 1 0 1 0 1 2 10 1 4 1 5 1 1 103 124 120 J 7. Current Number Of Significant Industrial Users SIUs ? 1 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Categorical Industrial Users CIUs ? 0 16. Number of CIUs in SNC? 11 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? Concerned about illegal dumping, but Mr. Patrick also noted that there was a hit the same time last year. 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during SNC for either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Pul 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? EYES ❑ NO Copper, 10/2019 ❑ YES ® NO Limits: None Reporting: None dished: N/A None ❑ YES ® NO LTMP/STMP FILE REVIEW: STMP Monitoring is not currently being conducted. 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ❑ YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ❑ YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify yourself! 26. 27. If NO to 23 - 26, list violations Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ®NO NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1 If yes, which ones? Eliminated: Added: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2 28. PRETREATMENT PROGRAM ELEMENTS REVIEW- Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 2/6/2019 ® Yes ❑ No 3/4/2019 ® Yes ❑ No 4/1/2024 Industrial Waste Survey IWS 3/25/2019 ® Yes ❑ No 7/11/2019 ® Yes ❑ No 4/1/2024 Sewer Use Ordinance SUO) 12/19/2012 ® Yes ❑ No 1/10/2013 ® Yes ❑ No Enforcement Response Plan (ERP) 1 3/8/2017 ® Yes ❑ No 5/6/2017 ® Yes ❑ No Long Term Monitoring Plan (LTMP) 1 3/25/2019 ® Yes ❑ No 7/11/2019 ® Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1. Ashe County Cheese 2. 3. 30. IUP Number 0003 31. Does File Contain Current Permit? ® Yes ❑ No ❑ Yes ❑ I❑ Yes ❑ No 32. Permit Expiration Date 6/30/2024 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A N/A 34. Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? ® Yes ❑ No ❑ Yes ❑ No 11 ❑ Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? a. ®Yes []No a. []Yes ❑No a. ❑Yes []No b. If No, is One Needed? (See Inspection Form from POTW) b. ❑Yes ❑No b. ❑Yes ON- b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑Yes❑No[D 71 ❑Yes❑No❑N/A ❑Yes❑No❑N/A Organic Management Plan TOMP ? 38. a. Does File Contain Original Permit Review Letter from the Division? ®Yes ❑No ROYesONoIR a. ❑Yes ❑No a. ❑Yes ❑No b. All Issues Resolved? b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No its Sampling as Required by IUP, including flow? 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Sampling as Required by IUP, including flow? 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A on time? 42a. For categorical IUs with Combined Wastestream Formula (CWF), does ❑Yes❑No[D ❑Yes❑No❑N/A ❑Yes❑No❑N/A file include process/dilution flows as Required by IUP? 42b. For categorical IUs with Production based limits, does file include ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A production rates and/or flows as Required b IUP? 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No All Limits Non -Compliance from Both POTW and SIU Sampling? 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A All Re porting_Non-Compliance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.®Yes❑No❑N/A a.❑Yes❑No❑N/A a.❑Yes❑No❑N/A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? b.®Yes❑No❑N/A b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c. If applicable, Did POTW resample within 30 days of becoming aware c.❑Yes❑No®N/A of SIU limit violations in the POTW's sampling of the SIU? c.❑Yes❑No❑N/A c.❑Yes❑No❑N/A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ® No J1 ❑ Yes ❑ No I ❑ Yes ❑ No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 49. Does The File Contain Proof Of Penalty Collection? ❑Yes❑NoON/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 50. a. Does the File Contain Any Current Enforcement Orders? a.❑Yes❑No®N/A a.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b. Is SIU in Compliance with Order? b.❑Yes❑No[9 b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This ❑ Yes ® No ❑ Yes ❑ No ElYes [_1 No Requested Information For You? NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3 FILE REVIEW COMMENTS: Industry had a silver violation in September, but did extra sampling to stay out of SNC. They don't have any monthly average limits. Files were well organized and readily available. INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number MM/DD/YY 1. Industry Inspected: 2. Industry Address: 3. Type of Industry/Product: 4. Industry Contact: Title: Phone: Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: None. A well run program. Requirements: Recommendations: NOD: ❑ YES ® NO NOV: ❑ YES ® NO QNCR: ❑ YES ® NO POTW Rating: Satisfactory XXXX Marginal UnSatisfactory Docu Signed by: PCI COMPLETED BY: �� DATE: 3/24/2020 F10C7C2E5BB34D4... NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 4