HomeMy WebLinkAbout20200204 Ver 1_CAMA Major Permit No. 36-20_20200402Permit Class
NEW
Permit Number
36-20
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
rrmit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS I I3A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Eugenia B. Esham, PO Box 310, Ocracoke, NC 27960
Authorizing development in Hyde County at adj. to Silver Lake, at 192 Silver Lake Rd.,
known as the Lighthouse Dockhouse, in Ocracoke, as requested in the permittee's application dated 12/2/19,
including attached workplan drawings (8), all dated "Received DCM-WARO 1/10/20".
This permit, issued on April 2, 2020 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Replacement of a Non -Conforming Structure
1) In accordance with 15A NCAC 07J .0211, the enclosed area of the dock house shall not change in
use and shall not be constructed larger than 16ft. 1 Oin. x 1 Oft. 4in. with an 8ft. 4in. x 4ft. Tin. lean-to.
2) This permit authorizes only the replacement of the existing non -conforming structures within the
previously existing footprint. No portion of the replaced non -conforming structure shall be located
outside of the previously existing structure footprint.
3) The Division of Coastal Management shall be notified immediately in the event of any spillage of
any hazardous, toxic, or harmful materials or substances (e.g. paint, stain, fuel, polyurethane) into the
Estuarine Waters or the Public Trust Area.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2023
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
Z_lllew�
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Eugenia B. Esham
ADDITIONAL CONDITIONS
General
Permit No. 36-20
Page 2 of 2
4) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
5) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the
permitted activity without having it transferred to a third party.
6) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW-2020-00235).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4175 and assigned the project DWR Project No. 20-0204.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 946-6481 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.