HomeMy WebLinkAbout20191748 Ver 2_NOV-2019-PC-0726_20200331ROY COOPER
Go: ernar
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
N
CERTIFIED MAIL#7017-
John Welfare)
President, T 'in Rivers POA
7803 NC 1057
Boone, NC 28607
Dear Mr. Welfare,
on October 16, 2019, Kelli Park and Milo
Resources (DWR) of the Winston Salem
the subject site. The visit was prompted
been conducted at the subject property.
be determinjed, however the potentially
findings are summarized below:
CAROLINA
ental Quality
mber 13, 2019
Subject: Disturber! Stream Banks Investigation
Notice of Violation
NOV- 2019-PC-0726
Parcel I D : 188 9 601241000,1889602278000,
1889604303000,1889605430000
Work in State Waters/Stream
Watauga County
Turner, staff personnel of the Division of Water
,egional Office conducted a complaint investigation at
)y a complaint that streambank modifications had
The exact Watauga County GIS parcels were unable to
mpacted parcels are listed above. The investigation
1) Approximately 100 linear feet of streambank and riverbed on the Watauga River, class
B. Tr; HQW, waters, were altered, and river rocks were added.
A file review has indicated that a Pre -construction Notification has not been received by
the Division of Water Resources for this project and that a 401 Water Quality
Certification has not been issued. In accordance with an email from Sue Homewood of
this office to you on June 18, 2019, (attached) the Watau a River is a hi h- uality
water designation, and a 401 certification was required for work that was conducted.
2) A small tributary stream running parallel to the Watauga River was impacted by heavy
machinery being driven throughlit for access to the Watauga River streambank. There
�^.1Q�"L
North Ci Irolina Department of Environmental Quality ; Division of Water Resources
Winston Salem Regional Ofrtce i 450 West Hanes Mill Road, Suite 300 1 Winston-Salem. North Carolina 27105
336.776. I800
were notable tire tracks through l
the n4ural stream function.
3) Based Pon the site observations r
from i he US Army Corps of Engin(
were applicable for authorization
by the US Army Corps of Engineei
Quality General Certification No.
Resources. Accordingly, all work r
the NVP 13 and the GC No. 4314
Accordingly, the following violation is no
1) Title 15A NCAC 02H .0501 requires c
Water Act whenever construction of
navigable waters, including wetland
.0502 states any person desiring isst
general certification required by Sec
shall file ':with the Director of the No
Required Response
sides of the stream's bank which have impacted
ade during this investigation and an email received
!rs, the streambank alteration measures conducted
nder the Nationwide Permit 13 (NWP 13), regulated
and for written authorization under the 401 Water
L34 (GC No. 4134), regulated by the Division of Water
ust comply with all terms/conditions contained within
-tifications pursuant to Section 401 of the Clean
)peration of facilities will result in a discharge into
as described in 33 CFR Part 323. Title 15A NCAC 02H
nce of the State certification or coverage under a
on 401 of the Federal Water Pollution Control Act
h Carolina Division of Water Resources.
1) You are directed to contact Ms. ark via email or phone concerning this letter within 30
calendar days of receipt of this iotice.
2) if yo wish for any stream hank i
the -Fact 401 Water Quality Certi
application describing the strear
required. Note that this applicai
avoidance and minimization pur
Notification form can be found e
npacts to remain in place, you must receive an After -
[cation. To obtain a 401 Water Quality Certification, an
bank and riverbed modifications to the Division is
on will be reviewed for purpose and need along with
want to 15A NCAC 02H .0506. The Pre -Construction
the following link:
documents. Alternatively, you may
submit a written plan/proposal for the area to be
restored of pre -construction co
ditions. Please note that should you choose this option
no activities should commence Lntil
the Division has reviewed and approved a
restoration plan. You may also propose
a combination of permitting/restoration.
3) The (',entire length of streamban i
on the Watauga River that was impacted must be
seeded with native vegetation tensure
stabilization of the loose material. This must be
4) The side stream that was impact
channel should be reconnected i
banks must be reshaped and the
Pursuant to II'G.S. 143-215.6A, the aboi
subject to al civil penalty assessment
violation. Your above -mentioned resp
further process that may occur.
i must be restored to natural shape and function. The
the area impacted by the equipment tracks and the
seeded with native vegetation.
rnentioned violations and any future violations are
up to a maximum of $25,000.00 per day for each
;e to this correspondence will be considered in any
Please contact Kelli Park at 336-776-96or kelli.park@ncdenr.gov regarding your response to
this letter and if you have any questions
Thank you for your attention to this
cc: DWRF-WSRO
Amanda Jones- Fuemeler, USAGE
Andrea Leslie, NCWRC sent via e!
Alfred Jr and Anita Danna (191 C
Ronald Pronyk, Mountain Proper
Richard and Tasse Little (2714 Ta
enc: Previous email correspondence
Sincerely,
ESigned by:
� 5.ujtr
E19E225C94EX-
Lon Snider
Regional Supervisor
Division of Water Resources
Winston-Salem Regional Office
, sent via email
nail
iestnut Flats Ln, Waynesville NC 28786)
ties, LLC (1800 NW 15{ Court, Boca Raton FI 33432)
nglewood Ln, Charlotte NC 28211)