HomeMy WebLinkAboutNCC201350_NOI Application_20200403Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 4/2/2020 11:51:38 AM (NCG01 NOI Submission)
Approve by Clark, Paul 4/2/2020 3:38:26 PM (Review- Construction NOI 23908)
• The task was assigned to Clark, Paul by round robin distribution 4/2/2020 11:52 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 6, 2020 5:00 PM.
The priority is: High 4/2/2020 11:52 AM
Submit by McCoy, Suzanne 4/3/2020 1:21:21 PM (Payment Verification for NCC201350)
* Sanau Odugbesan
• McCoy, Suzanne assigned the task to McCoy, Suzanne 4/3/2020 1:20 PM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: May 14, 2020 5:00 PM. The
priority is: High 4/2/2020 3:38 PM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
la. Project Name * PNG Line 243 Retrofit Launcher
1 b. Specific Lot This field rray be used to list specifc lot nunbers.
Numbers
2. County* Craven
3. Highway or Street Tuscarora Rhems Road
Address* Street name only is acceptable if no address nunber assigned yet
4. City or Township* New Bern
5. State * NC
6. Zip Code* 28562
7. Latitude* Enter the latitude in decimal degrees
35.0836
8. Longitude * Enter the longitude in decirral degrees (MJSTbe negative)
-77.1739
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
04/08/2020
Estimated Construction Project Start Date
10. Date to End*
07/31/2020
Estinated Construction Project End Date
11. SIC (Primary) *
Other (0000)
Standard Industrial C]assification for Development
12. Acres to be
6.68
disturbed*
(including off -site borrow and waste areas)
13. Total site area 55.53
(acres)*
14. Post- 2.18
construction (Estimated)
impervious area
(acres) *
NCC Project NCC-CRAVE-2020-PNG Line 243 Retrofit Launcher
Tracking ID Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Rocky Run
Wate rbody* Barre of waterbody into which storrrwater runoff will discharge
15b. Waterbody 27-101-35-1-
ndex No. * NCWaterbody Index Minter
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Piedmont Natural Gas inc.
Name * If perrrittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
2. First Name* Sanu
It Corporation, enter F;bgistered Agent First Barre
3. Last Name* Odugbesan
If Corporation, enter Registered Agent Last Wre
3b. Title Project Manager
4. Permitee E-mail sanu.odugbesan@duke-energy.com
Address *
5. Permittee 704-731-4246
Telephone No.*
6. Permittee Mailing Street Address
Address* 4720 Piedmont Row Drive
Address Line 2
city State / Ftovince / Region
Charlotte NC
Fbstal / Zip Code Country
28210 United States
Check box if the rJ Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
4720 Piedmont Row Drive
Address Line 2
City
State / Ffovince / Fbgion
Charlotte
NC
Fbstal / Zip Code
Country
28210
United States
8. Type of
Non -Government
Ownership*
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Wade
Contact - First
Name *
2. Primary Site
Kennedy
Contact - Last
Name *
3. Title
Superintendent
4. Site Contact E-
wkennedy@troyconstruction.com
mail Address*
5. Site Contact
9032447346
Telephone No.
6. Organization
Troy Construction
Name
7. Site Contact
Street Address
Mailing Address*
3375 Maysville Road
Address Line 2
City
Commerce
Postal / Zip Code
30529-1375
8. Consultant Name
(Optional)
Dan Jester
First and Last nacre
9. Consultant E-mail
djester@stimmelpa.com
This person will be copied on all correspondence.
10. Consultant
336-723-1067
Telephone No.
State / Rovince / Region
GA
Country
us
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 03/11/2020
Approved *
2. E&SC Plan Project Crane-2020-026
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Washington (WaRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan Crave-2020-026 PNG Line 243 Launcher -
Approval letter or 861.55KB
03112020 (EXP).pdf
Grading Permit
Mast be FDFforrrat
Site Map (Optional) Helpful for linear project review
PNG-C-026-0001001-0. pdf 4.01 MB
Mast be RDFfornat
Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support
the application. Include additional waterbodies for linear projects if necessary.
6. NOI Certification Launcher.pdf 248.24KB
Form Mast be RDFfornat
This is an Express f No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6E (i) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name * Sanu Odugbesan
Title Project Manager
Organization Piedmont Natural Gas Company
Date * 04/02/2020
F. Tracking and COC Info
NOI Tracking No. 23908
NC Reference No. NCG01-2020-1350
Uses 'count number' variable (incremrented by SP)
Certificate of NCC201350
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 1350
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)