Loading...
HomeMy WebLinkAbout20200445 Ver 1_BR-0035_Hyd_prm_wet_Package03312020_20200403Submitted 4/3/2020 Highway North Carolina Department of Transportation ° °t StOCCY1> Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 67035.2.1 TIP No.: BR-0035 County(ies): Moore Page 1 of 1 General Project Information WBS Element: TIP Number: BR-0035 Project Type: Bridge Replacement Date: 9/20/2019 NCDOT Contact: 7Raleigh, Contractor / Desi ner: L.D. Clawson Address:Ridge Drive 27610 Address: 1000 Birch Ridge Drive Raleigh Phone: 919-707-6711 Phone: 919-707-6712 Email: gcgiLl@ncdot.gov Email: Idclawson ncdot. ov City/Town: Carthage Count (ies): Moore River Basin(s): Cape Fear CAMA Coun No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 0.319 mi. Surrounding Land Use: Rural Proposed Project Existing Site Project Built -Upon Area ac. 0.85 ac. 0.84 ac. Typical Cross Section Description: 2 12' lanes 2 11' lanes Annual Avg Daily Traffic (veh/hr/day): Design/Future: 8000 Year: 2040 Existing: 6500 Year: 2018 General Project Narrative: (Description of Minimization of Water Quality Impacts) The project consists of replacing Bridge # 24 on NC 22 over Nick's Creek. The approach work will consist of raising and relining the existing roadway and providing grass shoulders and guardrail. Bridge # 24 existing 1 span structure (20' total length) will be replaced with 3 @ 12' x 9' RCBC. Best Management Practices: -Promotion of sheet flow and infiltration with grass shoulders. -Drainage systems outlet to rip rap pad. Waterbody Information Surface Water Body (1): Nicks Creek NCDWR Stream Index No.: 18-23-3- 3 NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply III WS-III Supplemental Classification: High Quality Waters HQW Other Stream Classification: Impairments: None Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I Submitted 4/3/2020 IFi ")ee ) neer r H r or 1 naex or --) neers See Sheet 1 B For Conventional Symbols )TIP PROJECT 1945 BR-0035 1943 1938 1943 1838 1944 1838 1839 1843 VICINITY AAAP MOORE COUNTY AIRPORT ,,, STATE OF NORTI-4 CAROLINA DIVISION OF HIGHWAYS MOORE..COUNTY LOCATION: BRIDGE NO.24 ON NC 22 OVER NICKS CREEK TYPE OF WORK: GRADING, DRAINAGE, PAVING tG AND C UL VER T BEGIN TIP PROJECT BR-0035 -L- STA. 11 + 80.00 / / /SITE 1 / THIS PROJECT HAS NO CONTROLED—ACCESS. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. GRAPHIC SCALES 50 25 0 50 100 PLANS 1 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2020 = 6650 ADT 2040 = 8000 K = 11 % D = 60 % T = 4 % V = 60 MPH * (TTST =1 % + DUAL = 3%) FUNC CLASS = MINOR ARTERIAL STATEWIDE TIER PROJECT LENGTH LENGTH OF ROADWAY TIP PROJECT BR-0035 LENGTH OF STRUCTURE TIP PROJECT BR-0035 TOTAL LENGTH OF TIP PROJECT BR-0035 = 0.319 MI 0.007 MI = 0.326 MI TER W Z W f W V � I N Z BEGIN CULVERT —L— STA. 22 + 92.67 END CULVERT —L— STA. 23 + 31.33 SITE 2 STATE STATE PROJECT REFERENCE NO. SHEET TOTAI" NO. SHEETS N.C. BR-0035 I STATE PROD. NO. F. A. PROJ. NO. DESCRIPTION 67035.1.1 P. E. 67035.2.1 _ ROW /UTI L 67035.3.1 CONST. -------------------- ------------------- PERMIT DRAWING SHEET 1 OF 11 \ \ \ \ \ \ , S0I END TIP PROJECT BR-0035 -L- STA. 29 +00.00 Prepared in the Office of: DIVISION OF HIGHWAYS 1000 Birch Ridge Dr., Raleigh NC, 27610 2018 STANDARD SPECIFICATIONS RIGHT OF WAY DATE: AUGUST 30, 2019_ LETTING DATE: JULY 21, 2020 TATIA L. WHITE. PE. PLS PIOTR J. STOJDA PROJECT TEAM LEAD HYDRA ULICS ENGINEER P.E. SIGNATURE: ROADWAY DESIGN ENGINEER �SiIGNATURF_r P.E. Submitted 4/3/2020 Submitted 4/3/2020 to z O w / / /�304m / = //� J 3n- // i^y // / // / I/ / 6 / / / I / I ` J l> M � � \\ --\ � \ \ � � \\\ \ \\\ \� \ � \ \m, � � \� 1 � � \ \V\ \\N; � PROJECT REFERENCE NO. SHEET NO. BR -0035 4 co tim\� RAW SHEET NO. �( - 920 / / / � / % / � / 11I m � /1 SS£' 3✓ � � ' f\ \\ \ of I \ •335.0 ' �� ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER r�rnT �T r�rn r�rnT �T f� z 114� �O fA� w� U £4�fr fAff} IT DRAW G - / i 35m/ / 3 / / / J \ a 1 // \\J w �_ � \ \+ I C \) I J ��ro• / ( 1 \\1 1 08\£ T 3 0 F -/ / 376.0 / J I 4`1/ f � � tnG' � � � 1 � � I 'p� / / .3150� /m �374.0� J - -�372.0� /- - -367.0 � 0a �-367.0/ � f -363.0 -366.0 � I 1 -3/65 - � �_ / /� / 3620 -� � / -36m � / / -3y6m 34i50/ / / � � �/ / � / •35�� ��� � I � � � � m� 3gy'0� -361.0 - 351.0 -360.0•���-0 I -3se.m_ _- 9.m ,� -� -� �_ / J / J / / / 3zm.m_ ,35 -- \ -358.0 •350.0 5 /����_ O.Zr£ \ _ / I /34 \ / � X�5- .0 .355.0� w \IfI \ I 7.0 �� 3530 8. �m �q5� I 1 m ��'3250 I w £r£ \ --356.0�� - - - - .355m- - _� .355.0 54.0- � �/ / / 6Y£ -349.0 �\ J `\ � ,/ / �� �/ I l � f // 32�'0 \e• I \� � 6` `\ / � > 354.0 -353.0 -3 / _ 351.m / f / ll \ / / ti 1 \/ / I I / titi // ' 3 /\�� �� \ 0 rze�i�\ 1 �, ✓ \b 0' \ 352.0�- _352.0 53.m / J .350.0- / �/ 0/ / `\// -345• -� 351.0 �311.0 -35e.0- - - - �- -� �_ 35z0 / .345.0� �e \ 1 `✓ M� �m� 310.0 -350.0- / _ _� 3g6m-- % / 3p6m /`) �m/� -339.0 // /35.0� / ;S�' �9rf '0st �\ ` �� 315/�0 /� ��j �/• 349.0- � -350.0 � / �- a B. �nw ,3470 �/ 346.0\ / ✓ 342.0^y / 0/ / ��/ -333.0 _L 8• c' 316.0- \ 1 0'0I£ m•1\L v-m£t/ /� 344.0 33 / / \ -� \ \\ \ /\ •3qS 03 3 65. / / 329 0 J -345: / 3 ' 346.0 m / / 25/ / \ 0g`£ / / �12m \m.ZS �\ \ \ �a \ j =L f �- -323.0� (( c� CoN 0'SS£. �g£ \ \\ \ ec \ / / 342.0 3A1m / // \- �- / �\ '339.0 /// �// / �0 ` '=`am eft 'h / '343.0 \ _� / / ,3�,^� w / \ 320.0 \0'9 mom- N 0 CAf�TH ACE-m•btf_ use -•y4m• -337.0 ��- -- / �� '333m /\/) �'/ / / / 335.m ` � C J � � �315.0- �� _339.0 / -� �� m \/- �f. \ Z ezzf T'- v> WOODED -3311,11 o \ T0� F CARTHAGE Q �m'mbf. J I / ww m 0E££- \ w •� > - _ �_ _ J� £e � m•z D E D � f \ -1- II0'Ib£� / �- 00Z - 6�_ - - 3_ \ \ \ \ \ \ \ £ \ \ \ -�PE�61�Lf�T ITCH\ \ m _ - - \ L E TAI L\sLl- \ \ \ t fsS� Rr RAP \ \\ \ \\\�� �� \\\ \\\ 1 \ \ m'9b£- \ \ \/ m'8E£- ✓ ESQ �CWU CH Of --GOD- \ 17 P c �1 DITC ^OZS£_-0'Lb£ S \mmb E F 1 TOE ROT C ON a' a'zb£ \ \ \ \ \ m zzE- V `1 \ \ \ `C� 1 SEETETAI \ 0 � �H A-R VLE \ [}�� �/ I'I P'�� t L T CRUI �C 0 94 G0�/ / �/ �/ `0•Sb£. /� \ - e ; \ \\ `. \ e \ / 1 9e \ 1 \ \ \ 6S-m'LbE_ !/ /j % R -0'9SE _ ` !c^ \ > e I I •bs � CL B RIP RAP / � \ �f 6N� l l e9f \ £ \ TONS m� r 66£, if 4AL-C-UT-ITLN �- .' CL B IP \ \ ( \ \ / /� WICLASs-B RAP 21 $Y�GEOTEXTILE w''1 �y� - / / SIP �� \ m C YY TEILE\ \ e F_/ / /� \\ SEE \ \ M �\ X \ \ \ I W0 D I( s \ f. � � \ \ mm9 \ � \ \ � � / \ /j � -0 095£- � - -mil' ,�►/ � \ \ I l ` Z � l \ \ \ \ � \ \ WN� OF T RN PI S Bf 1 I \ M\ \eS 09 S / _ - \\ \ f, 0'8Z ei 9£. e�' , �✓�i \ \ \ \ 1 1 \ \ \ \ \ \ £- -CHR� OPHEk,,. Ems? -A T �/ \ ` \ _ £WIFE, AMAN \1 / 0 m 'n WOODE \ \ \� \ , \\\\\ ebz � UE R � /\\\ �0'49E- `��' �i / �' 1J \\\ / I \ 0.6££ fZ 0'IE£Z� \ \eb\ m ] \\ \ / `m 99£_ \ \ E / \ / < \\ J \ 1 \ Sf \ J \\ B \ I! ( f. ww - w� \� \ \`m'0e£. \� \ V. \ \ �- �- � � � \ a' it <9 � � � � �� \ � \ V WILL CH�J AND\�\�. MIREAM HU y\\�e.9E£ V99£' G\\ \�m'E££� \ l I �/ _��\\ m•L£ < �� \ OLEE- \ \ /` IJC F L ec'4 0 / c^. 6f � 9. ��\ / � 36a' � e`9f J � .d' � - > / 0m9�• {/ \� J �- 1 / C �1 � \ � � � � /�0� L\\ \\\0'8E£/ / � f�1111��11�� \ \ £f CC'11��eSMM1 V 16J \ \\ \\\ 1 \\�e•Z / L�� \f f \\05£\\\ e � � \ . !`v �� -tee• 1 � \� \ \0' \�I1 /1V,�/00D�n � \ / L9£- _\ \ I / �, e 0'0 0'69£' / / 0 / \I / \ \ \ I \ 3h SB \ W \�lbF\\ / \ / \ \ SEWS�t B E A T T Y ms9£,�` I M \ � � / / \ /- � 0 \ ✓� \ � \ / // � /J /+1\ ifl � I � 0� e \ � \SbZ.\J •�\\\ \ 0'06£ Ir ro 1 ,m > \ M �J'� ///J / -� \ \ � \ �- % / � /// I //•)!� � I \ 1111 I `` \ e `- ._� \ \ \ � 026£\ \ \ \ my4i• \ of Saf• � des -No /(yJ�) \Q ✓ % m'st£. / - \ •my \ \ \ \ \ \ \ \\I I\\ � f. G A � H I S 5A L Em£�£' � \ \ / 0w > � \ �- OS � ' \'m � l \.`5 / � / I 1 � I � / \ \ \ i\� \ / •3yyp/ °S£ \ \ \ \ \ \ \ \ \0. -� II � \ 9 \ \ 0£g£ \ tg£ ef£• \ \ \ �- \-009E L -',m`9E t mzg£\ -J I W LU LU W N ru Submitted 4/3/2020 CT cr co to z O LU )ED JT DITCH -Al L 6 i% SS i ,oq 41 7011� �AInnnF-l-1 TOWN OF CARTHAGE PERMIT DRAWING SHFFT A OF „ WOODED TOWN OF SOUTHERN PINES PROJECT REFERENCE NO. SHEET NO. R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INC®MPLIE % IE PLANS DO NOT USE FOIE W ACQUISITION DENOTES FILL IN WETLAND WOODED GRAPH �/J SCALE CHRISTOPHER To VAN DE R ET AND WIFE9 AMANDA L. VAN DE RIET CT co Submitted 4/3/2020 SHEET NO. 5 to Z O LU 01 W LU LU LU V) 0 O O O N I J I W Z J Q E M GRAPHIC SCALE Z IMPACTS IN SURFACE WATER DENOTES IMPACTS IN SURFACE WATER • DENOTES MECHANIZED • " CLEARING 0' 10 0' N I 20� PERMIT DRAWING SHEET OF CLASS II RIP RAP 1• w/GEOTEXTILE EXISTING CLASS II RIP RAP w/GEOTEXTILE PROJECT REFERENCE NO. BR -0035 R/W SHEET NO. ROADWAY DESIGN ENGINEER INLET/OUTLET CHANNEL DETAILS (NOT TO SCALE) OUTLET CHANNEL COIR MAT ON BENCH EST 35 SY CLASS II RIP RAP 2 THICK (TYP) EST 95 TONS EST 95 SY GEOTEXTILE !PEST EXCAVATION 250 CY RCBC CLASS II RIP RAP EST 10 TONS INLET CHANNEL COIR MAT ON BENCH . EST 40 SY r ''+rf�Y��li ���R� �� �•���o„(YfrYrr'%' RAP q1 ��� ���! -inn.. �... EST 135 EST 135 GEOTEXTILE t EST EXCAVATION 470 CY 1' SILL INSET 2' SILL INSET • INTO RCBC L CLASS 11 RIP PAP EST 10 TONS FLOW ON C W&NW-5-4 �������V�����0�����������i9iiiy�� DENOTES EXCAVATION (NOT TO SCALE) NOTE: BACKFILL LOW FLOW BARRELS (2) WITH NATIVE BED MATERIAL. BACKFILL HIGH FLOW BARREL (1) WITH CLASS B RIP RAP. CLASS II RIP RAP w/GEOTEXTILE TOTAL QUANTITIES: EST 250 TONS CLASS II RIP RAP EST 230 SY GEOTEXTILE EST 720 CY EXCAVATION EST 75 SY COIR MAT EST 80 TONS CLASS B RIP RAP DETAIL A TOE PROTECTION ( Not to Scale) ,°A, Natural n� \0� S\°pe Ground b �d d = 1.0 Ft. b = 3.0 Ft. Geotextile Type of Liner= B Rip —Rap FROM STA. 21 + 00 TO STA. 22 + 80 -L- RT FROM STA. 23 + 35 TO STA. 24 + 20 -L- RT DETAIL B SPECIAL CUT DITCH ( Not to Scale) Front Ditch Natural g'.\ et Slope Ground 3•) D\° A Min. D=1.5 Ft. FROM STA. 23 + 35 TO STA. 24 +10 -L- LT FROM STA. 24 + 90 TO STA. 27 + 00 -L- LT HYDRAULICS ENGINEER Submitted 4/3/2020 CT cr co to Z O LU W LUU LU LU N J LU Z J 2 U I PROJECT REFERENCE NO. SHEET NO. �� BR -0035 5 RAW SHEET NO. r ROADWAY DESIGN HYDRAULICS PERMIT DRAWING ENGINEER ENGINEER v / 417 _. SH FEET O )j � _0•ZZ\ � - ( \ � I\\ \ \�',7S � \ 3qr 0� � 7 I / ) J / \ I � \3 � \ / w / (// / � r \ � \ � ( 1 - \m .4�� no� •6l (/ � � I m \ � ` I I 1 � //J ( l (/) � d � I J � 1 / m / � e\ 1 \ \ \ \ �323.0-L jT \� l II// �w _320.0- �/ J 0 /£ w 1 wwe� \ II / ( ee ( > w \ I I r 111 \ \ \ Wm 1 J 1/ 318.0- \ 3160 _ 31$ wA I 1 t 1 \1\ wa \ / INLET/ �UTLET CHANNEL" -DETAILS /6� \SCALE) j ((( I \ 7-0 LE-'w �ew% COIR MAT am UTLET CHANNEL q O ON BEN EST 35 SY \\wee L 1\ \ s9\ 3g60� \ \ \ 3 -0'0tE \ D �\ \ �� Z / \ \ \ \ \ 1 \ \ \ i \ 0\ ,,,��V / \ \ ( < 1 \ l l •; I I\ ` \ \ \ \\ ��� CLASS II RIP RAP ��IfYOP R.4P \ �1 ESTH95KT�N5 (\ \ w 1 1 \ 9e wJ6:�OTEXTILE s\ \\\\ \ Vie\ \ \ \ e \ \ 9 EST 95 SY IONGEOTEXTILE250 J 3 EST EXCAVATION 250 CY 0 \ \ \ l \ \ ( \ \ \ \ 0 \ \ \ ✓ \ \ \ e \ \ \ 1' SIL�INS \ 2' SILL9NT \WNBe\ s\ \ \ 3' ML�J INI RCBC \ 3' MIN INTO RCBC �m e I a s. \ \ 1 ?e\ CLASS II RIP RAP w WOODED \� e. \ m \ \ \ \ w ) \ \ fe \ \ \ \ \ ( \ \ \ \ \ \ \393.m. \3e e. \\ \ a9 \ \ \ \ \ \ \ 3g9'0, \ \ INLET HANNEL 9g°0. MAT �e 3a1.0, -� �\ \ \ \\� \ 3 EST 10 TONS \�W Q /rm 1 s \ \ \ �\ \�� \ O BENCH \ (f1vVp S TQ TIC�N 321rE \ \ wp\zNITRB BO .,~ �\ \� \ \ \\� ! \ \ `\ _�379.0\\ \ �T•E �1'-\� 71-1 \ ES w9\ 1 \ 1 CLASS II RIP RAP EST 135 TONS EST 135 -TION- TILE -37s.0..� -� � 'e. w /\ EST EXCAVATIO CY \\ s\ \ \ 2' SIL INSET2� 0 \ I \ \ 342.0_ e 1 s MMM IL WOODyD m ere /r .\ I �ODC� \ \ \ l I 0 \ I I a 1\ \ �373.0_ �\ \ _ \ \ \\ \BS' I 1�191q C C 3'MIN TO SEPT �- \ \ see \ \ \ 1 \/)� �� \\ 11 I \ \ \ agr \ e , CLASS II RIP RAP 397.0 \ CLA P \ \ \ REM I I \ I \ \\ zbE ljI� (\/ ) \ l 1 I I e \ \ �� 37a.m- S \ 3n.0, \ e \\ \ \\w EST 10 TONS \, ,PUE [ - SEE CH' L DET L �\ !� X I L \0 \� \ \ \\ 9N 9e \ V \ \ \ _ a I 1 \ -� - -� \\ \ \ FLO 0 9e w \ I \ \ \wWe ) 339. \ \ 'ZbE 1 m l 1 I wm \-�370.0' / / 8.0- \ \\ �� \ \ \ \ /7 •a \S \ / , �00 \� �� CR m�' e\ \ \ \ I \ \ IP ��'�P \ /� 1 I 0 \ s6 \\ \ �j�- 365.0 \� \ \\ �- 3�,0\ -� 960 J L ` \ 1 I l I ) \ \ m \ EX�4 ATIO A EXI ING BRIDGE TER VAULTS ' \ F w (\l/ 11 \ . - - - - - - , - C /- 30 e. I N�` \ 2ge e \ \ s \' e \� ws ;e \ `\l \ \ e ( \ e \ �_ / // /\36 Q•0.\� \\ mm '`I _- _ 365.0- \ �\ 9e I CLASS II RIP RAP CLASS I R�P R�,P 1 w/GEOTEXTILE 394.0 DI CH \ / E(��E)F1ILE� - ti' ti \ ` Z ,5 GR DIT H B ) \ \ l \ \ -.� 358.0. - --360.0- 359.0GM - -�OT\ gw\' N.�_ 2j \ \ \ \ - - \\ -\� 357.0- \_\ 356 D N TE E CAVAT� N I 1 T SC LE \ ---'TOTAL QU TIES• \ - O -I YRIT RAT \ \ m CBC \ 9e\ \\ s\ 34 \ 351.m_ \\_�3$ 0 \ \ \ ST 250 TAN LASS / .w` - = S \\\ \ \ \ \\�� \ \ ) ) m a 1 T 230 S G OTEXUI & �352yw N�TE: \ \ EST i2g�CY EXC,4V,4TIq / / IL LL� RLS 2) �/IT �3 ST 75 SY COI�_M�CT3�I IApr �tA K�Rj LH�H®'I�S CLASS �RIf�I2AP A REL I H CWS'PP`. \ S \ / '\BBr TOE PRO/11fE Till3g5.0. l ` 3 SEE ETAI A w 311.0- ED3,, - \ \ \ \ \ \�\32s�\33ee, /� °�G �t\\3390\ �341.0 \ �34z\ \ \ \ ` &6: \�j�\\� 34m.0- SEE P / \ \ � - �' ' \% q00 ~ ✓ w I m \ s w \ s50 C \\\�� � 1 I`\ 1f� C \ 1 \ \ \ �a�\30� - \ - - �� \ �T W �� \ \\ / /� 1 \ \ \ \ l w I \ ( we.g E� L r% 381.0 \ \ \�_ UCLA �� m 1\ \ 1 's \\ \\ ` \ ` - / \ ���\O S-\T�OE ^t± SECTION / \ / J W 0 E P(jE 0°ll£ g 312. \ - 316. \\ \ \ � \ \\33�� �\�� \ \ w3, B• wg6\ se � \ \ \ e \� `\ \ 3800. � � J�Q�• / // 0- cit zJ Xj-3L4.0_ - - P9' \ \ \ 3S \ e wS9 \\ \ \ w \ 3 `E\ '7 S0. \ \ I \\Q?\ \4je� \\\ \ e\ \ \ �'636q\\ \ 'Sep - Ft. 3.0 -Ff.- 377.0iGeotek �ITE 2 ti ZJ / m \ - �� 31 . \\ \ \ \ W \a•0, \ �f 3 \\ -TYpe-ef\ Liner -$ Rip={iep / / 312.m 6- e`' e\ 31� \FR03`T:� 2T�0� -$T . 22+�g�L- T/ m\3F�tOM !T//l �Jg O-STD+Z"-- RT ! \+-��-373.0- \ / 4 t AL�&- \ RRAPIP SITE SNI ELD A4 SY�EOT --- EC ECAAm Dm B AL CU q 366.0 3b7.0 / 0 \ ront 362. _itch ur \ Slone / tS F IN %\ / 20' 'Se� '\ - �\ / \ 34j 0 \ 3 \ \\ \ 0 f LAN D \ \_ \ m l✓ - 1 ��-'!<0\wrp \\\ �\ �_ \ �\ \ p ���� \3S �' 319.0 32 \ fir£ 0, � .L 0•Zl£ � / �� � 0 \ 3160 \ \ Ne. � ` www \ / 1 - M 2 + -DENOTES TEMPORARY �ROT�ts£344 EO �"6VP7O�� \ IMPACTS IN SURFAC WATER \� / / 3\ \ \ \ �'�•e\\ \ / / \m 0 w ENOTES CM CTS Id \3230\ / ) URFE WATEf�.0'13,1.m l 7:2 �\ *NOTE MECHANI D�\\ - Zrs \ \ \\\ B\ \\ \ \ a S \ \ I, �Z 3j6-0 - /�314 / \ / / l\® \ \\ NNE\ \ems\ \ \\\\ \ \ e `9`. 1 \ \ \J\ \ \\ \\ \\\\\\ \ wBe. \\ -\�-345.0� 34 6. �- \ e.3430_114.1 3 �334.0 •ems ® / \ \ l \ \ \\\ Ns \ I e, I �w i� �iee � � \ � `� • a \ J / 00 � \ l �% \ � I / � / � \ � � \ l �� , \ � \30\ � � \ \ � 1 >\ \ \ \ \\ \ M \\ \1 `� \ ` 11 � r J (-n� /\ / / \ � -V /C� l m� �Bt�` •e/ / J 1 I / �mm \\ \Sf` 31\ 00. \ 1\ l 1 I l I \ `\\ \{ - \� � � 0 r . e ,� I -� ✓ � � / � �w w 0 � .mw - e- \ � `// m�'`� � \ 1 / � l //I I .m m m - Ilk ,m.m .am ,gym • / �` / Bis �o• \ 'e 1 \ / m m m I I ` m /I / \ ` \ 6N �i^ \\\\ \II�<�• \ 7 •0w / / / 7£ w .eO -310.0' CT cr co to Z O LU `l H W W Mr t/) W W N 0 O O O N J W z J =r Q ►j no CLASS 11 RIP RAP SEE CHANNEL DETAIL CHRISTOPHER To VAN DE RIET AND WIFE9 AMANDA L. VAN DE R ET DENOTES MECHANIZED CLEARING Submitted 4/3/2020 i i i F i I �C JI I FM NI /yF/ F DENOTES FILL IN /// WETLAND DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES IMPACTS IN SURFACE WATER oj 00' GRAPHC SCALE SPECIAL C T DITCH , y SEE DET\ IL B ` Raw 0' WOODED PROJECT REFERENCE NO. RAW SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. HYDRAULICS ENGINEER INC®MPL FPLAN DO NOT USE FOR % W ACQUISITION KEV N A. PREVAT WIFE9 KATHLEEN To f Submitted 4/3/2020 PROJECT REFERENCE NO. SHEET NO. BR -0035 6 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER -E PERMIT DRAWING SHEET s OF 11 3 70 360 ---_1 360 —_ q 64 35n 340 3A0 r• 13,30—_. 30 ti 37 310 310 inn inn 10 11 12 13 14 15 16 17 18 19 20 21 370 370 flAn1 360 350 350 3dn-140 330 330 STA. 23 +12 -L- _ - 3 @ 12'x 9' RCB, W/SILLS --- - 320 SKEW 9 ELEV=3119 -_- 32n LET DITCH 31n--,+----1h�� 1 w- -—J_�---�--- 31n NW =309.0 LUI . RIG LIT DITCh - - nn LEV = 304.8 APE=0.5% 300 21 22 23 24 25 26 27 28 29 30 Submitted 4/3/2020 co N CD fA z CD CD f,4 Y,'�f0 kq *kaf,4 w -0�w �f'p,Q nfaz Cn fQ4w f» fd�cn kR f 0 1 0 1 1 0 110 1 0 0 0 1 1 20 30 50 60 0 5 10 PROJ. REFERENCE NO. SHEET NO. BR-0035 X-6 a,m1 0 0 0 0 0 30 20 0 0 0 0 100 110 1 0 1 0 1,40 1 0 — — ---- — PERMIT DRAWING SHEET 9 OF 11 '--——__——---- —-3—_ _ --- — —_ 315. 7 — 25+00.00 -- — — -- — ---- an 24 + 0.00 24+00.00 00 0.060 an l -3on 23+00.00 WETTLAND 0.0()0 1 0.0610 3� 77 -300 22 + 0.00 ion 1 20 150 1 10 110 1 io 110 100 90 80 70 0 50 10 30 20 1 D 30 AO 10 60 70 80 1 910 100 110 1 1 10 1 0 1 0 150 Submitted 4/3/2020 co N CD fA z CD o k4f,4 Y,'�f0 kq *kaf,4 wow �f'p,Q nfaz Cn fQ4w f» fQl) cn kRY14-64 1 0 1 0 1 1 0 110 1 0 0 0 1 1 20 30 50 60 0 5 10 PROJ. REFERENCE NO. SHEET NO. BR-0035 X-4 0 0 0 0 0 30 20 0 0 0 0 100 110 1 0 1 0 1 0 1 0 PERMIT DRAWING SHEET to OF 11 � 0,060 ;7 )0- • 340 340 W TL D 0,060 TA. 18 + 7 5+/ ) 0.000 — - - — ---- — — ---- — — — — ---- — — — — ---- 0.0 0 0.060 -----510 _— 18 + O.PO 0-0 in V. VOV 0.0 0 0,060 — ---- — .� — — — ---- — — ---- — — -- — — --- — — -- —1 332.52 on ---- 3' — — ---- — — 334.84 20 110 1 0 140 140 110 190 10 1 10 710 0 1 50 10 30 20 1 1p T 1p 30 50 60 0 0 90 Igo 1 io 1 0 140 110 1 0 Submitted 4/3/2020 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 18+75 -L- Fill 0.050 2* 21+75 -L- Fill 0.030 0.010 2 22+55 -L- Fill 0.010 3 23+12 -L- 3@12'X9' RCBC 0.040 61 3 23+12 -L- RULt Bank Stabilization 0.043 0.021 90 45 TOTALS*: 0.09 0.00 0.00 0.01 0.00 0.08 0.02 151 45 0 Rounded totals are sum of actual impacts NOTES: * Total take of would be an additional 0.01ac 2018 Feb