Loading...
HomeMy WebLinkAboutWQ0033513_Application_20081013M ' OF \N A TFRp �F'vR— State of North Carolina O G�Iv Department of Environment and Natural Resources 1, 7 OCT 1 3 200E Division of NVater Quality o wQ COPY FAST -TRACK APPLICATION D' " (FTA 12/07 ) for GRAVITY SE«'ERS, PUMP STATIONS, AND FORCE MAINS (Pressure b; Vacuum seN%er systems are not to be included as part of this application package) INSTRUCTIONS: Indicate that you have included/addressed the following list of required application package items by checking the space provided next to each applicable item. Failure to submit all required items will lead to your application being returned as incomplete. Forms are available from the web site or by calling the Regional Office serving your county: http://h2o. enr, state. nc. us/peres/Collection % 20Systems/CollectionSystemApplications. html X A. Application Form - Submit one original and one copy of the completed and appropriately executed application form. The application should include a project narrative describing the final build -out design (i.e. system and/or pump station to ultimately serve 500 homes, but flow for only 100 homes being requested now). For modifications, clearly explain the reason for the modification (i.e. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information that has already been included in the original permit. Any changes to this form will result in the application being returned. The Division of Water Quality (Division) will only accept application packages that have been fully completed with all applicable items addressed. You do not need to submit detailed plans and specifications unless you respond NO to Item 1303). Separate applications should be made for non-contiguous sewer systems X B. Application Fee - Submit a check in the amount of $480 made payable to: North Carolina Department of Environment and Natural Resources (NCDENR). Checks ;hall be dated within 90 days of application submittal. ❑ C. Certificates of Public Convenience and Necessity — If the application is being submitted in the name of a privately -owned public utility, submit two copies of the Certificate of Public Convenience and Necessity (CPCN) which demonstrates that the public utility is authorized to hold the utility franchise for the area to be served by the sewer extension. If a CPCN has not been issued, provide two copies of a letter from the North Carolina Utilities Commission's Public Staff that states that an application for a franchise has been received, that the service area is contiguous to an existing franchised area, and/or that franchise approval is expected. The project name in the CPCN or letter must match that provided in Item A(2)a of this application. ❑ D. Operational Agreements — Submit one original and two copies of a properly executed operational agreement, as per 15A NCAC 02T .0115, if the application is submitted by a private applicant and will be serving residential or commercial lots (e.g., houses, condominiums, townhomes, outparcels, etc.) that will be sold to another entity. If the applicant is a home or property owner's association, use Form HOA 02/03. If the applicant is a developer, use Form DEV 02/03. EVEN IF THE PROJECT MAY BE TURNED OVER TO A MUNICIPALITY UPON COMPLETION, FORM DEV 02/03 IS REQUIRED. X E. Downstream Sewer, WWTF Capacity and Flow Tracking/Acceptance — FORM FTSE 10/07 (Flow Tracking/Acceptance for Sewer Extension Permit Applications) is required with every application. The applicant (and owners of downstream sewers, pump stations and/or treatment facilities submitting FORM FTSE-10/07) certifies that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving treatment plant, and that the flow from this project will not cause capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving wastewater treatment plant. Where the applicant is not the owner of the downstream sewer, submit two copies of FORM FTSE 10/07 from the owner of the downstream sewer and owner of the WWTF, if different. The flow acceptance indicated in FORM FTSE-10/07 must not expire prior to permit issuance and must be dated less than one year prior to the application date. Submittal of this application and FORM FTSE-10/07 indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a). Intergovernmental agreements or other contracts will not be accepted in lieu of project -specific FTSE 10/07. X F Map — Submit an 8.5-inch by 11-inch COLOR copy of a USGS Topographic Map of sufficient scale to identify the entire project area and the closest surface waters. Each map or maps must show the location of the sewer line and pump stations and be of reproducible quality. Include a street level map showing the downstream connection point, and the permit number for the downstream sewer, if known. FTA 12/07 []iG,. Stream Classifications — Watershed Classification Attachment (Form WSCAS-12/07) If any portion of the • sewer system project is within 100 feet of any surface water or wetlands, the Watershed Classification Attachment may need to be completed. A variance must be requested for encroachment within required setbacks or buffers pursuant to 2T .0305 (f) and be indicated in Item B-13 with supporting documentation/justification provided. ❑ H Environmental Assessments — If this project is subject to an Environmental Assessment (EA) [15A NCAC 01C], this application cannot be used. Send the project application on the most current version of Form PSFMGSA to the Design Management Unit, 1633 Mail Service Center, Raleigh, NC 27699-1633. Applications cannot be accepted until a Finding of No Significant Impact (FONSI) or Environmental Impact Statement (EIS) has been issued. A copy is to be submitted with that permit application. ❑ I. Flow Direction — Many wastewater treatment systems are entering into agreements for regionalization efforts and emergency treatment capacity. Parts of the system are installed so that the wastewater flow can be directed to more than one treatment facility. If this is the case with this project, please indicate in 13(12) and give the permit number of the second treatment facility. X J. Certifications — Section C The application must be certified by both the applicant and the design engineer who is a North Carolina Registered Professional Engineer (PE). The applicant signature must match the signing official listed in Item A(lb). The PE should NOT certify the application if he/she is unfamiliar with 15A NCAC Chapter 2T, the Gravity Sewer Minimum Design Criteria (most recent version) and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (most recent version), as applicable to the project. THE COMPLETED FTA 12/07 APPLICATION PACKAGE, INCLUDING ALL SUPPORTING DOCUMENTS AND $480 FEE, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910) 350-2004 Fax i Winston-Salem Regional Office 585 Waughtown Street Alamance, Alleghany, Ashe, Caswell, Davidson, Winston-Salem, North Carolina 27107 Davie, Forsyth, Guilford, Rockingham, Randolph, (336) 771-5000 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 771-4630 Fax For more information, please visit our web site at.* http://www.ncc-gLnet/EngineeringlSewerlo20Permits.htmi or contact the Regional Office serving your county. FTA 12/07 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application to Number: b Number: be completed ) W00033 513 1. Owner/Permittee: la. Town of Biscoe Full Legal Name (company, municipality, HOA, utility, etc.) Z 1b. James E. Blake Mayor Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing officials!) H Q 1c. The legal entity who will own this system is: ❑ Individual ❑ Federal X Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): O 1 d. P.O. Box 1228 1 e. Biscoe LL Mailing Address City Z 1 f. North Carolina 1 g. 27209 Z State Zip Code 0 1 h. 910-428-2158 1 i. 910-428-3975 QTelephone Facsimile E-mail V 2. Proiect (Facility) Information: J 2a. Biscoe Industrial Park 2b. Montgomery IL Brief Project Name (permit will refer to this name) County Where Project is Located a Q 3. Contact Person: 3a. Thomas K. Goodwin P.E., Hobbs, Upchurch and Associates, P.A. cF« y/o - So 5 2`1 89 Q Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 910-692-5616 3c. tgoodwin@hobbsupchurch.com Phone Number E-mail 1. Project is X New ❑ Modification (of an existing permit) If Modification, Permit No.: 2. Owner is X Public (skip to Item B(3)) ❑ Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one) ❑ Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Public Utility (instruction C) ❑ Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Homeowner Assoc./Developer (Instruction D) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) 3. Town of Biscoe Z Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 0 4a. Town of Biscoe Wastewater Treatment Facility 4b. NPDES NCO021504 QName of WWTF WWTF Permit No. 5a. Town of Biscoe 5b. 12 INCHES X Gravity 5c. Owner of Downstream Sewer Receiving Sewer Size ❑ Force Main Permit # of Downstream Sewer (Instruction E) 0 LL 6. The origin of this wastewater is (check all that apply): ? � % Domestic/Commercial ❑Residential Subdivision El Retail (Stores, shopping centers) ❑ Apartments/Condominiums ❑ Institution % Industrial (attach ❑ Mobile Home Park ❑ Hospital description.) LJ.I ❑ School ❑ Church (RO: contact your Regional Office X Restaurant ❑ Nursing Home a Pretreatment staff) ❑ Office ❑ Other (specify): % Other (specify): 7. Volume of wastewater to be allocated or permitted for this particular project: t4 0 6AP O gallons per day 'Do not include future flows or previously permitted allocations 8. If the permitted flow is zero, indicate why: ❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) FTA 12/07 W M Z Z 0 V Z 0 H Q 0 U. Z H W a 71 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item 13(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item 13(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). Waffle House @ 34 seats/day @ 40 gallons/day =1=W gpd 1360 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 1Y Length (feet) New Gravity or Additional Force Main 249.16 LF Gravity 11. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID Design Flow (MGD) (self chosen - as shown on plans/map for reference) Operational Point Power Reliability Option GPM @TDH I - Permanent generator w/ATS; Force Main Size Force Main Length 2 - portable generator w/MTS Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow Operational Point Power Reliability Option (MGD) GPM @TDH 1 - permanent generator w/ATS; Force Main Size Force Main Length 2 - portable generator w/MTS 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? ❑ Yes X No If Yes, permit number of 2rd treatment facility (RO — if "yes" to B,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? X Yes []No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 12/07 14 Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401 Certification? ❑ Yes [:]No X N/A Sedimentation and Erosion Control Plan? ❑ Yes ❑ No X N/A Stormwater? ❑ Yes ❑ No X N/A 15. Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)) involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: ❑ and provide details 1. Owner/Permittee's Certification: (Signature of Signing Official and Project Name) 1, _James E. Blake, Mayor , attest that this application for The Waffle House has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civ' enalties up to $25,000 p iol io 1 a. gning Official Signature /Dade ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY TO OTHER UTILITIES, DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 Z O Q2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) _V 1, _Thomas K. Goodwin attest that this application for The Waffle House has been tL reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria uJ for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump (,) Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials V under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. Thomas K. Goodwin Professional Engineer Name 2b. Hobbs, Upchurch and Associates, P.A. Engineering Firm 2c. P.O. Box 17737 Mailing Address 2d. Southern Pines City 2g. 910-692-5616 Telephone 2h. 910-692-7342 Facsimile 2e. NC 2f. 28387 State Zip 2i. tgoodwin@hobbsupchurch.com E-mail . I,- NC PE Seal, Signature & Date FTA 12/07 Project Narrative: Waffle House — Biscoe, North Carolina HUA MC0809 This project consists of the installation of new 8" sanitary sewer to serve the Waffle House as part of a larger tract `Biscoe Industrial Park" located in Biscoe, North Carolina. Final build -out design for the project consists of 20 business lots, but flow for 1 lot (Waffle House) is being requested now. O�O�WAT�RpG cisDJJa O � State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE—10/07) Project Applicant Name: _Waffle House Project Name for which flow is being requested: Biscoe Industrial Park More than one FTSE-10107 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: Town of Biscoe Wastewater Treatment Facility NPDES NCO021504 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD .500 MGD NONE .184 MGD 1500 GPD APP. .184 MGD NONE OBLIGATED APP. 40Z II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD III. Certification Statement: I, _James E. Blake, Mayor , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above) Sections I and II for which I am the responsible party. Signature of this form indicates accentance�df this wastewater flower /7 i i�txg Official Signature Instructions for: Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE—10/07) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. The obligated flow not yet tributary plus actual flow will be reconciled annually for systems at less than 60% of permitted flow used. Annual updates shall be submitted to the appropriate Regional Office by January 15 of each year and cover the previous calendar year. Semi -Annual updates shall be required when the percent of permitted flow used reaches 60%. Semi- annual time period are defined as January 1 through June 30 and July 1 through December 31. Semi- annual updates shall be submitted to the appropriate Regional Office by July 15 and January 15 of each year. Quarterly updates shall be required when the percent of permitted flow used reaches 80%. Quarters are defined as Qtrl (Jan -Feb -Mar); Qtr2 (Apr -May -Jun); Qtr3 (Jul -Aug -Sep); Qtr4 (Oct -Nov -Dec). Quarterly updates shall be submitted to the appropriate Regional Office by April 15, July 15, October 15 and January 15 of each year. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + f] h. Percent of permitted flow used: Equals [(g / c)* 100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. The first Form FTSE-10/07 submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f. = 0.015 MGD g. = 3.215 MGD h. = 53.6 % The next Form FTSE-10/07 may be updated like this: c. = 6.0 MGD d.=0.515MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8 % Each subsequent Form FTSE-10/07 will be updated in the same manner. Section II List the name, approximate pump station firm (design) capacity and approximate current average flow (previous 12 months) through the pump station for each pump station that will be impacted by the proposed sewer extension project. Include the proposed flow for this project and other flows that have been approved for the pump station but are not yet tributary. Firm (design) capacity is the design average daily flow of the pump station as calculated by the design engineer or the station capacity with the largest pump out of service as per the Minimum Design Criteria if the design capacity is unknown. Section III Form FTSE-10/07 must be signed by the appropriate official as per 15A NCAC 02T .0106. BISCOE QUADRANGLE NORTH CAROUNA-MONTGOMERY CO, 7.5-MINUTE SERIES (TOPOGRAPHIC) 7` 30' 510 1611 1770000 FE T 613 79045' 35022' 30` FaithfuF. � (5) 3915 591 r2"i i ia7� 590000 FEET [e r nt ,t i 3914 : N s t7u'� fast Win ;� . _ -- « . ... •�} , � -,,—(�!r�;`'".�r�' � . Taps. Btsc r t • �it , a }food � � � • r �rnf�el • Va AQ �--s�outl wo C f ` • j5 ���� •� `G '' (/ �� ti 3912 Ra 87 609 ss 1 ,r.•t. �... fast .� t ,, X er j -r t Hobbs, Upchurch & Associates, P.A. Consulting Engineers TRANSMITTAI P.O. Box 1737 300 S. W. Broad Street Southern Pines, North Carolina 28388 (910) 692-5616 FAX (910) 692-7342 TO: NCDENR — Division of Water Quality HUA PROJECT # MCO V EI V R —1 R " Fayetteville Regional Office �J ' V 225 Green Street, Suite 714 OCT 13 2008 Fayetteville, NC 28301-5094 ry,R j V:tl FROM: Tom Wanko HUA FILE NO. # MC0809 Hobbs, Upchurch & Associates, P.A. DATE: October 10, 2008 RE: Waffle House — Biscoe Industrial Park MESSAGE: Please find the following Enclosed: 1-original Fast -Track Application (FTA 12/07) 1-copy Fast -Track Application (FTA 12/07) 1-copy Project Narrative 1- original Flow Tracking/Acceptance for Sewer Extension Permit App. (FTSE-10/07) 1-copy Color USGS Topographic Map 1- check for $480.00 Please contact our office for any questions or concerns. Thank you h: I mcOW 3W &ansmittal- ncdenr-water qualityfayetteville. doc