Subject: Revised Application for Section 404 Nationwide Permit 23 and 33 for the
replacement of Bridge No. 48 over Big Creek on SR 1851 in Cumberland County.
State Project No. 8.2444201. Federal Aid Project Number BRZ-1851(1). TIP No. B-
4493.
The North Carolina Department of Transportation (NCDOT), Division of Highways, recently
submitted an application fora Section 404 Nationwide Permit 23 for TIP No. B-4493 (dated
November 6, 2009). Subsequent to the submittal of this permit application inaccuracies were
identified in the supplied Pre-Construction Notification (PCN) form and on the wetland permit
impact summary sheet. Provided with this memo are replacement sheets 1, 4 and 7 from the
PCN and the wetland permit impact summary sheet.
Additionally, we are requesting the issuance of a Nationwide Permit 33 for temporary fill due to
the installation of erosion control measures (72 CFR; 11092-11198, March 12, 2007).
The following changes were made to these pages:
PCN - Pg. 1 § A. 1 b. - Addition of Nationwide Permit 33
PCN - Pg. 4 § C. 2h. -- Add statement:
Proposed temporary impacts to wetlands of 0.01 acres of temporary
fill in wetlands in the Hand Clearing areas for the installation of
erosion control measures, including Temporary Silt Fence and/or
Special Sediment Control Fence..
PCN - Pg. 7 § D. 1 b. - Remove:
Design Standards in Sensitive Watersheds and Sedimentation and
erosion control measures.
MAILING ADDRESS: TELEPHONE: 919-431-2000 LOCATION:
NC DEPARTMENT OF TRANSPORTATION FAX: 919-431-2002 4701 ATLANTIC AVENUE
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS SUITE 116
1598 MAIL SERVICE CENTER WEBSITE: WWW NCDOT.ORG RALEIGH NC 27604
RALEIGH NC 27699-1598
PCN - Pg. 7 § D. I b. - Add:
Best Management Practices for the Protection
implemented, of Surftce Waters will be
.
Wetland Impact Summary Sheet 3 of 5 - Note -Add statement:
0.01 acres of Temporary Fill in Wetlands in the Hand Clearing
areas for erosion control measures.
If you have any questions or need additional information, please call or email:
Dr. Lance P. Fontaine at 919-431-6667 or Ipii>ntaineCJncdot Gov.
Sincerel
F'?
Gregory J. Thorpe, Ph.D. Environmental Management Director
Project Development and Environmental Analysis Branch
w/attachment
Mr. Brian Wrenn, NCDWQ (2 Copies)
W/o attachment (see website for attachments):
Dr. David Chang, P.E., Hydraulics
Mr. Greg Perfetti, P.E., Structure Design
,Mr. Victor Barbour, P.E., Project Services Unit
Mr. Mark Staley, Roadside Environmental
Mr. Terry Gibson, RE, Division 6 Engineer
Mr. Jim Rerko, Division 6 Environmental Officer
Mr. Jay Bennett, P.E., Roadway Design
Mr. Majed Alghandour, P. E., Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. Scott McLendon, USACE, Wilmington
Mr. Travis Wilson, NCWRC
Mr. Gary Jordan, USFWS
Ms. Anne Deaton, NCDMF
Mr. Ron Sechler, NMFS
Mr. Tracy Walter, PDEA, Project Planning Engineer
r:
e7h
> r
O '~c
O?eF WATEROG
y T
Office Use Only:
Corps action ID no.
DWQ project no.
-- - - Form Version 1.3 Dec 10 2908 .
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
la. Type(s) of approval sought from the
Corps:
®Section 404 Permit E] Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 23 33 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No
1d. Type(s) of approval sought from the DWQ (check all that apply):
? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
® Yes ? No For the record only for Corps Permit:
? Yes ® No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. ? Yes ® No
1 In. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2.
2a. Project Information
Name of project: B-4493 Replacement of Bridge No. 48 over Big Creek on SR 1851
2b. County: Cumberland
2c. Nearest municipality / town: Stedman
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state
project no: 8-4493
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if
applicable): not applicable
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 431-6667
3g. Fax no.: (919) 431-2002
31h. Email address: Ipfontaine@ncdot.gov
C. Proposed Impacts Inventory
1. Impacts Summary
la. Which sections were completed below for your project (check all that apply):
® Wetlands ? Streams -tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
Site. 1 ? P ? T Perm-nent." ill Riparian . ... Yes
?No` ® Corps „ .....
?DWQ 0:02 -
Site 2 ? P ® T Temporary Fill Riparian ® Yes
? No ® Corps
? DWQ <0.01
Site 3 ? P ? T ? Yes
? No ? Corps
? DWQ
Site 4 ? P ? T ? Yes ? Corps
? No ? DWQ
Site 5 ? P ? T ? Yes
? No ? Corps
? DWQ
Site 6 ? P ? T ? Yes
? No ? Corps
? DWQ
2g. Total wetland impacts 0.02 Permanent
0.00 Temporary
21h. Comments: There will be 0.67 ac of hand clearing. Specifically, 0.59 ac of this work will be performed to allow for
aerial line clearance through wetland areas on the east side of the project. The hand clearing impacts will result in the
cutting down of trees and brush; however, grubbing will not occur. These hand clearing impacts will not result in the
permanent conversion of the currently forested wetland to a persistent emergent herbaceous wetland. Proposed
temporary impacts to wetlands of 0.01 acres of Temporary Fill in Wetlands in the Hand Clearing areas for the installation
of erosion control measures, including Temporary Silt Fence and/or Special Sediment Control Fence.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of Average Impact
number - (PER) or jurisdiction stream length (linear
Permanent (P) or intermittent (Corps - 404, 10 width feel)
Temporary (T) (INT)? DWQ - non-404, (feet)
other)
? PER ? Corps
Site 1 ? P ? T ? INT ? DWQ
? PER ? Corps
Site 2 ? P ? T ? INT ? DWQ
? PER ? Corps
Site 3 ? P ? T ? INT ? DWQ
? PER ? Corps
Site 4 ? P ? T ? INT ? DWQ
3h. Total stream and tributary impacts X Perm
X Temp
3i. Comments: Impacts due to the proposed bents is 14.4 square feet (<0.01 ac.)
4
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The proposed bridge is 38 feet longer than the existing bridge; the proposed bridge will be at approximately the same
grade as the existing structure; an off site detour will be used, 3:1 fill slopes where practicable.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Best management practices for the protection of surface waters will be implemented; top-down construction; off-site
detour will be used.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Goes the project require Compensatory Maigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes FA Nc
If no, explain: Due to the minimal amount of permanent
impacts, NCDOT is not proposing compensatory mitigation.
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c.
If yes, which mitigation option will be used for this
pro
project? ? Mitigation bank
E] Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity .
13c.. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. ,Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
C N
F
F N
? n Y
a
a 3 m
Q
O
O
F 2 O
z
? o ? a+
F z m N
iil ? m r7
N
.- N
K ? ? VI
a ? 3
m
U
Z
s
m
M S• d
_y
t
H
iS
?
+ M
a
?
N
?
?
N 7
?
] N
I
w C) E
0
0 > C N O
N U
m o
0
0
d m
m
? m
= m
N
?
d ?
U
w o
c
N m
c =
m d
? L
'O C
N
O N
?
6
O G
m
2
m
3
5
_o
O LL
°r
I N m
Z
5
?
Q E
E O
12 w
n O
N O
C U
m m
E o
d o "¢
a
W
$
CT) Z
O O
c
?
N N r
m _ N
V] O
Z
N
m ? ? a
Q
y...
'xs o.
E ?
a W U
lY
O) d N
O
? C
Q C m m ?
N m n E v
? L E
wx
-a
U
w
U
Q
N
m y a m
Q
C N
? C U
m ? m U
? E U ? m
F-
U m
a
a N
m
o
?
N ? N
c - U
L N j m.-
a -
N
o
m N U
m
Z K
?
W
H
W N
9
d C C U
3
C N
C
C
C
m _ N ? N
O N
O
E jy y ?? O O
a ?
d d
? F N
7 ? O
N ? m
N
N
N
o O
?
o o
c
o
N w
J
? O J
F
v c
o d
O
F