Loading...
HomeMy WebLinkAboutNCS000532_Email from DWM Superfund RE Monofill Water Pumping_20200330Georgoulias, Bethany From: Mattison, David Sent: Monday, March 30, 2020 12:33 PM To: Georgoulias, Bethany; Lambe, Brian; Sams, Dan Cc: Weaver, Cameron Subject: Fw: [External] water on top of monofill-Wright Chemical superfund site Attachments: 92470703_frc.pdf, Wright Chemical Monofill Report.pdf Importance: High Please see below and the attached. Can this water can be discharged via a general storm water permit? If I have not sent this to the necessary personnel, please let me know so as to expedite this as much as possible. Please feel free to contact me if you have any questions or comments. Thanks, Dave D a<i d B. Slatti son Emivro re �rrl Eng n� , Srpefr�d S�tion fqQ4 Forth CarolinaDepaiment ofEmironmental Quality• 919.707.8336 (Office) °� 919.656.5939 (Mobile) Da<id.liattison axtcdenr.gov Erred carresocndence to and from thus a0dr4°ss rs suZ t[ to 11 North Carnoo Public Reawds Law and may Lt drscbc ed to Ntrrd pa4m. From: Bill Oakley <oakleyb@oak-bark.com> Sent: Monday, March 30, 2020 10:31 AM To: Mattison, David <david.mattison@ncdenr.gov> Subject: [External] water on top of monofill-Wright Chemical superfund site External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov David We want to pump water off the top of the monofill at the Wright Chemical superfund site. We had been instructed by NCDNER not to do so in 2017 when Shield Engineering, doing studies for the USEPA, did some test results on that water and found some extremely high po I I uta nts. Since then the water on top has been diluted by rainfall to the point that the major pollutants have been drastically reduced as shown by the attached analysis which was completed last Friday. But we still have pollutants above the report limit. 1 We would like to go ahead and discharge the water from the top of the monofill onto our property. The major reason is the water level is too high for the earth enclosure at the top of the monofill. If we don't we are fearful there may be a rupture of the monofill at some time in the near future. Our conundrum is we do not have the financial ability to ship water off -site. We have been out of business for over eight years and spent what money was left on the super fund study. Please call if you wish to discuss @ 910-520-6518. From: Amanda Payne [mailto:Amanda.Payne@pacelabs.com] Sent: Friday, March 27, 2020 3:48 PM To: oakleyb@oak-bark.com Subject: Re: Water Analysis, Pace Project #92470703 EM Please find attached final report. If you have any questions please let me know. Thanks! -amanda Amanda Payne Project Manager I Pace Analytical Services 9800 Kincey Ave, Suite 100, Huntersville, NC 28078 Direct: 704.977.0949 1 pacelabs.com [pacelabs.coml NOTICE-- The contents of this email and any attachments may contain confidential, privileged, and/or legally protected information and are for the sole use of the addressee(s). Any review or distribution by others is strictly prohibited. If you are not the intended recipient, please contact the sender immediately and delete any copies. `,A Please consider the environment before printing this email >>> Robin Doepke 3/27/2020 3:42 PM >>> Hello Amanda - This has been processed/approved, please send results once completed. Have a great weekend Order Information Description: Order Number: Customer ID: Billing Information William E Oakley Oak -Bark Corp oakleybkoak-bark.com Payment Information prj 92470703 92-610257 Date/Time: 27-Mar-2020 13:39:21 MDT Transaction ID: 41909720931 Transaction Type: Authorization w/ Auto Capture Transaction Status: Captured/Pending Settlement Authorization Code: 027464 Payment Method: Visa XXXX8976 Robin Doepke Corporate Collections Specialist Pace Analytical Services, LLC P.O. Number: Invoice Number: Shipping Information 92470703 Shipping: 0.00 Tax: 0.00 Total: USD 474.00 3 Direct: (612) 297-9367 Robin.Doepke@pacelabs.com (_111OAna1JNCN 0 > > > Amanda Payne 3/27/2020 2:22 PM > > > Good Afternoon Bill, I wanted to give you an update on your report. Your final report will be ready in the next 30 mins. The total cost of the project with the rush fee markup for a 3 day TAT is $474.00 and I have attached a preliminary invoice. Payment for analyses must be paid prior to report issue. In order to make payment by credit card, please contact Robin Doepke at (612) 656-1114. Thank you, -amanda Amanda Payne Project Manager I Pace Analytical Services 9800 Kincey Ave, Suite 100, Huntersville, NC 28078 Direct: 704.977.0949 1 pacelabs.com fpacelabs.coml iXica1' f avast.coml Virus -free. www.avast.com favast.coml