STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 48827.1.1 TIP No.: BR-0118 County(ies): Northampton Page 1 of 1
General Project Information
WBS Element:
48827.1.1
ITIP Number: BR-0118
Project Type: Bridge Replacement
Date: 12/26/2019
NCDOT Contact:
David Stutts, PE
Contractor / Designer:
Kisinger Campo & Associates
Address:
1000 Birch Ridge Drive
Raleigh, North Carolina 2760
Address:
301 Fayettville St.,
Suite 1500
Raleigh, NC 27604
Phone:
919 707-6400
Phone:
919 882-7839
Email:
dstutts(cDncdot.gov
Email:
nking(aD_kcaeng.com
City/Town:
Pleasant Hill
County(ies):
Northampton
River Basin(s):
Chowan
CAMA County?
No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
913 ft
Surrounding Land Use:
JAgricultural
Proposed Project
Existing Site
Project Built -Upon Area (ac.)
0.5 ac.
0.30 ac.
Typical Cross Section Description:
The proposed typical section on either side of the bridge will be normal crown with cross
slope of 0.025, and consist of two 10' lanes with 3'-11" paved shoulder and 2:1 or flatter
side slopes to existing ground with the exception around the bridge opening and on the
north side where the jurisdictional stream runs parrallel to the roadway. Any slope 1.5:1
or steeper is to be armored with Class II Rip Rap.
Existing roadway is a 13' wide gravel road, with 3' unpaved shoulders.
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 970 Year: 2016
Existing: 970 Year: 2016
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
State project 48827.1.1 will consist of replacing the structurally deficient NCDOT bridge #650093on SR 1203 over Jacks Swamp. The proposed replacement structure is a 1-
span (1 @70') 24" Cored Slab with 2.5' caps with an out -to -out deck width of 30' which will replace the existing single -span (1 @35'). The existing roadway around the bridge is
sorrounded by wetlands with all runoff discharging to the wetlands. Existing roadside ditches near the begin and end project limits transition to overland flow towards the
wetlands before reaching the bridge opening. The Proposed condition will match the existing drainage patters as closely as possible. Stormwater runoff from the proposed
bridge and approach slabs will be collected by traffic bearing grated inlets where they will discharge to rip rap pads and flow overland towards the wetlands.
The Temporary Detour alignment will require temporary fill within the wetland with matting provided underneath.
Waterbody Information
Surface Water Body (1):
Jacks Swamp
NCDWR Stream Index No.:
25-4-2-3
NCDWR Surface Water Classification for Water Body
Primary Classification:
Class C
Supplemental Classification:
Nutrient Sensitive Waters NSW
Other Stream Classification:
Impairments:
None
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
N/A
Buffer Rules in Effect:
N/A
Project Includes Bridge Spanning Water Body?
iYes
Deck Drains Discharge Over Buffer?
INo
Dissipator Pads Provided in Buffer?
INo
Deck Drains Discharge Over Water Body?
INo
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
00
O
I
V
c
0
i_
E
c
0
O
Z
O
I
0]
c
0
c
m,
I
o
O�
O Ll'
x
Oxl
N6.
ON
N�
O' O
aN
I �•
ISO
See Sheet 9A For Index of Sheets
I b
1
1
1
SWAMP
i� PROJECT
LOCATION
I
3
I
1
1
-
1
/P
thaul
�ti a ch
VICINITY MAP
-� DEAD END
BEGIN TIP PROJECT BR-0118
—L— STA.10+35.00
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
NORTHAMPTON COUNTY
LOCATION. BRIDGE 650093 ON SR 1203 (JACK SWAMP RD)
OVER JACK'S SWAMP
TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE
-----------------\
--
-4 SR 7203 (JACK SWAMP RD)
TE- TEMPORARY DETOUR
iEGIN BRIDGE ) ND 1$RIDGE
-LL- STlV13+ .24 �/ 4- STA. 14+28
/ J
i
J
L
�EXD TIP PROJECT BR-0118
.49� —L- STA.19 + 65.61
STAT6
SiATB PROIBCT RBPBBBNCB NQ
SI�B'C
NO.
'ttl'PAL
SHBBTS
Novo
BR-0118
STATe PROI.N0.
.APR0.I.N0.
De6CRDY1'fON
48827.1.1
WA
PE
48827.2.1
WA
RWW, UTILITIES
48827.3.1
2020001
CONSTRUCTION
YW ETlla!]llal D
STREAM IMPACTS
3/31/2020
PERMIT DRAWING
SHEET 1 OF 18
NAc NO 20i\
0 pD
GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
r1c FIRM LICENSE No: C-1506
HYDRAULICS ENGINEER,`ti �ARo`,�
,J
301 Fayettville St.,
KCA
Suite 1500
,;
�� :�oFESSioN99
50 0 50 100
ADT 2020 = 50
LENGTH ROADWAY TIP PROJECT BR-0118 = 0.162 MILES
KISINGER CAMPO Raleigh, NC 27601
; ` SEAL®RT�
ADT 2040 = 50
& ASSOCIATES (919)882-7839
049338
®
V = 30 MPH
LENGTH STRUCTURES TIP PROJECT BR-0118 = 0.014 MILES
2078 STANDARD SPECIFICATIONS
%FPVCINEFP'
PLANS
50 25 0 50 100
T 6 % *
*TTST 3% + DUAL 3%
TOTAL LENGTH TIP PROJECT BR-0118 = 0.176 MILES
JOHN P. MAZERES, PE
P.E���i�
SIGNATURE:
,,�
ROADWAY DESIGN A
PROJECT ENGINEER
LOCAL
P2�P:
ENGINEER
SEAL
PROFILE (HORIZONTAL)
10 5 0 10 20
FUNC CLASS = RURAL
ANDREA B. JENSEN, El
043935 ?
®P
SUB —REGIONAL TIER
NCDOT CONTACT. DAVID STUTTS, PE
SMU PROJECT MANAGER
-, ✓8,"c-1,.1,
,�ipJ'V P••:"�'cc
-- PROJECT DESIGN ENGINEER
PROFILE (VERTICAL)
r.E.
SIGNATURE:
Qo"icori A1919non
mC
�r
r
oFE
oNa
�X]
OAF
pNd
Nr`
aNi
��1
I
1 Iliil
PROJECT REFERENCE NO. SHEET NO.
F DENOTES FILL IN
I I
j I I
I
1' `I
I
BR-0118
4
WETLAND
i s
11
i
IWJ SHEET NO.
DENOTES EXCAVATION
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
IN WETLAND
'�
ICI III
li,ll
I
DENOTES TEMPORARY
_
'�.
i
1
I
I ,
I
�� N CARO p� H CA
� �� •, !/�i� t !r�
?;:OFFS$%p'+9's ?.:OFFS$%p'••-✓'�
IMPACTS IN SURFACE WATER
� a
�A
I
I I
I I
I
�. ��
�•:
�9':
_
�-
/
-
I�
I �'
6
ear jy�
SEAL SEAL `.
DENOTES IMPACTS IN
SURFACE WATER �y
,
Jl ,;"
�/ i/qv
li
',
I
S, 043935 049338
DENOTES MECHANIZED
CLEARING
\` _ 1� i
III
/',,I'
/
n ,' I % / i \ �/ i I
�'„/ �/
a- s / 1%�`••,'I'G
I � ,
EEO'•• �'�..•Pi "'t;('.... E:?'•
PN,�``,`
, �_ •.........•.
, - N
41u1UP�, ��]quruuO�T�
�l I
`�VE*0WS 3 LLC,' ' `,/ I I NA 2 \
'
,
DOCUMENT NOT CONSIDERED
FINAL
DENOTES HAND J1
® N1
CLEARING IN WETLANDS G �
,
- /Y
DB 1030 PG'` GI,/ `�" I' &` AD g3 \ /
!? N \
`�
II
/ ;
6
F
1
UNLESS ALL SIGNATURES COMPLETED
( � � � �
� I
-- \
I
I',
I
PEEPA9E0 IN/^ NG FI9M LICENSE Xe: C-160fi
E OFFICE 9F. R(v 301 Fayett --- bt.,
Ra N NC 02]601
Y
�'
I •Y \
9
1
I
I
K�ISINGER CAMEO gh
ASSOCIATES (919)882-]839
rl SITELr
V
I �/
2
I i
i
I
,
,
PERMIT DRAWING
,+?I I I l I I r 111
,
/rq''-----__
' __• _" __ vs.. —_
II'
1
I
SHEET 2 OF 18
y:w0p05
E
DEAD END'T�
r,lAcl; sw A MP
'_- -
-
_',"--
e
--- - - - - ---_ _ _ --
i(•
- _ -
S 74'I2'20rr£''
_
--y,-=
________ _____
_ ___ _ _ _______ ___ _�______ ______c ___ ____-__
_ � S F6'4sR46.B'E
I
' F —
1 I "
_--__6Y --
F
C
F F �C
a �-
F L
/`F1
POE1571 1
'i
ill
E
E
"A"
HOWELL FAMILY UUC
9 DO Ia
HEIRS
V
o
ELLA AY NORWOOD
TA i� 13+37 RT
' NO REF
g'
-L-
��11,, ?y/
II
VIO = 0.4 fps
I
• &� STA = 14+47 -L- RT
NOTE: CROSS SLOPES AT PROJECT TIE-INS ARE APPROXIMATE.
Q70 = 0.2 cfs
CONTRACTOR TO ENSURE APPROPRIATE CROSS SLOPE TRANSITIONS TO EXISTING CONDITION
VIO = 0.8 S fp
ill
I
BMl°l0
—L— SR 1203 (OVER JACK'S SWAMP)
-
-L— STA17+43.37.29.2' LT
—
—
—
—
—
EL = 98.40
— —
—
R/R SPIKE 24 PINE
---
---
--
-------
--
--
-------
--
---
---
PI — 18+25.00
BEGIN
MILL
RESURFACE
P/ = 13+80.00
EL = 100.77'
VC
-L-
S
A.
0+ 3
5.0
—
PI = //+70.00
—
—
—
PI = 195. 0
-
-
--
_
EL = 94.47'
---
EL = 98J5'
VC = l70
EL = 95.03'
'
VC - l70
59
DS 40 MPH
v
110
VC = 250'
K = 56
K = 4/14
-
--�#zAOrfr4floo-
K = 39
DS > 30 MPH
-
_ DS � 40 MPH
DS > 30 MPH
-
-
ion
AL
I PROFq�4�RADE-,
-
-
-
-
(+)1.75 • - -Jl.
000
-
-
•'
/ R
-- —
_--
__
7—)1.3000`.
_ -I--_----
- Z
---1J
00%
---
----
---
--
/ -JI
---
---
—
---
---
--
-------
--
---
---
(+)
--_—
—
---
_
--
-
.750
-
ROPO
ED DE
IGN
PR
POSED
DESIG
BEGIN DITCH
RT
P
DITCH
RT
ND D
A J
CH R
I .4
L_-
A' p�
ND M
EXISTING
GRO
N
EL£V= 95
' L
E
Ev
`
CLAS
II RIP
RAP
ENC
-L
S
1
+5
-
- S
A.
4+
8,4
BRIDGE HYDRAULIC DATA
9+
pL-
-
-
-
-
-
.
.24
-
_ _
_
_ _
BSERV
N OS-
D WS
8-19
L = 9
.4'_
_ DESIGN DISCHARGE = 700 CFS
DESIGN FREQUENCY 25 YRSDESIGN HW ELEVATION 94.4 FT
BE
_ S
EL
IN DI
CH LTSTA
80
-
-
-
J8
V= 967
-L-
CLASS
[RIP R
P
BASE DISCHARGE = 1252 CFS
IY
_
BASE FREQUENCY = /00 YRS
I
I
--
I
I
--
I
I
1400 lELEVATION = FT
BASE OVERTOPPING
I PING DISCHARGE _ 1400 CFS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I.
-
OVERTOPPING FREQUENCY = 100+ YRS
OVERTOPPING ELEVATION = 95.9 FT70
FOR STRUCTURE PLANS, SEE S—ITHRU
3
S-1AO
I
—
Tz
I
— —
—
I
—
10 11 12 13 14
15 16 17 18 19
20
Qo"icori A1919non
mC
�r
r
oFE
oNa
�X]
o�F
no r
pNd
Nr`
aNi
nor
PROJECT REFERENCE NO. SHEET NO.
DENOTES FILL IN
BR-0118
4
WETLAND
RAN SHEET NO.
DEN E TION
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
INWETLAND
®
�o"HtCARO �' .`ttN CARp'�
M AOCTS IN S RFARY
CE WATER
_�
�C�2��`EESS
DENOTES DENOTES IMPACTS IN�1
/s��
'•��oSEAL�iE.
SEAL
S; 043935 S; 049338
SURFACE WATER
DENOTES MECHANIZED
ay
�,
_
_
\`\ \ \ \ \
F_ MEP?'• • F
', Fr.ul
,, Nn
-EQ`:a,�.
CLEARING
`' J �c
2011 \�
\
I
I
u,,`
I
®DENOTES
HAND
/ J1
Al MEADOWS 3 LLC I
//
g3 NA \
I
DOCUMENT NOT CONSIDERED
FINAL
CLEARING IN WETLANDS
L
DB 1030 PG 661 `\
NAD \/
UNLESS ALL SIGNATURES COMPLETED
P9EPANDCINOF. •�A� NC 301p FayettNev1118
E eFFl E KC♦
St., 506
CCC]]] 1
- Suite
gISINGER CAMPO Ra gh,
1500
INC 27601
Y /
ASSOCIATES (919)582-]839
SITE l
Lr
SITE 2Lr
PERMIT DRAWING
iv
SHEET 3 OF 18
— J *000S
-Wo
E E
III
E%ISi R/W
Wl ENANC� fw•iFYifa - -
- -'
IT----
-� DEAD END
s 74/r2orE'I
__ __
__ ____ SR 203 !JACK SWAMP• 5'GR -
�
___ _______ _R: __---- _ _ ___________
- - - - -
________ _
�T(-
- (C1PS I�ON)
93 2
- ---
EXIST R/W
-
.o
—; — —T— —
1
s'sa
-
F
F---
_--
�j
E• E F C
F F E L - - -
POE
E E
C_ ----- C
- E C E
�k
Vv_
Woo05 1 HOWELL FAMILY LUC
�v �k_ :v
3�
I
__DB 991
ELLA HEIRS Y
NO RORWOOD
i� 3 -L- RT
� y
CdLE
10 0.1
�
1
V1O = 0.4 fps
STA = 4+47 -L- RT
NOTE:
CROSS SLOPES AT PROJECT TIE-INS ARE APPROXIMATE.
0.2 cf
Q70 = .2 s
CONTRACTOR TO ENSURE APPROPRIATE CROSS SLOPE TRANSITIONS TO EXISTING CONDITION
V1O = 0.8 fps
BM1°10
N 1009592 E 2428708
-L- SR 1203 (OVER JACK'S SWAMP)
- -
- -
- -
-
-L- STA17+43.37.29.2' LT
-
-
-
-
-
EL = 98.40
-
-
R/R SPIKE 24 PINE
I
a
---
---
--
-------
--
--
--- ----
--
---
---
Pl - 18+25.00
BEGIN
MILL
RESURFACE
FtFGI
P/ = 13+80.00
EL = 100.7T
KC=
-L-
S
A.
0+ 3
5.0
-
PI = //+70.00
-
-
-
PI = 195. 0
-
-
--
EL = 94.47'
---
EL = 98J5'
VC = /70
EL '
VC - l70
59
DS > 40 MPH110
v
110
VC = 250'
K = 56
K = 4/14
-
-
K = 39
DS > 30 MPH
-
- DS > 40 MPH
DS > 30 MPH
-
-
-
D
800
%
(+
0.76
7%100
PR
-
-
-
-
_
(+)1:7� • - -Jl.
000
-
-
��
—--
7-J1.3000`.
(+1
- Z
---1J
00%
---
---
--
---
---
-
---
---
--
-------
--
---
---
--
-------
��
(+)
_
--_-
-
---
_
--
-
.750
ROPO
ED DE
IGN
PR
POSED
DESIG
BEGIN D
H RT
P
DITCH
RT
ND D
A I
cH R
/ .4
L_-
A' p�
ND rvl
EXISTING
GRID
N
EL£V= 95
' L
E
EV +
00 -L-
`
CLAS
II RIP
RAP
.4'
ENC
-
-
-L
S
1
+5
-
- S
A.
4+
p 1
O "
BRIDGE HYDRAULIC DATA
�9+
#
go
-
-
-
-
-
.
.24
-
4T�l_
_
_
BSERV
N OS-
D WS
8-19
L = 9
.4'_
_ DESIGN DISCHARGE
DESIGN HW ELEVATION
= 700 CFS
94.4 FT
BE
_ S
EL
IN DI
CH LT
ff
-
-
-
-
J8
V= 96
-L-
CLASS
[RIP R
P
BASE DISCHARGE
= 1252 CFS
_
-
_
IRAIY
_
BASE FREQUENCY
= l00 YRS
1
- -
-
1
BASE lNY ELEVATION
OVERTOPPING DISCHARGE
= 95.4 FT
= 1400 CFS
1
1
1
I.
1
1
-
1
1
OVERTOPPING FREQUENCY
= 100+ YRS
1
-
-
-
-
-
OVERTOPPING ELEVATION
= 95.9 FT
70
FOR STRUCTURE PLANS.SEE S-ITHRU
S-13
-
-
- -
-
I
-
10
11 12 13 14 15 16 17 18 19
20
Qo"icori A1919non
DENOTES FILL IN
WETLAND
PROJECT REFERENCE NO. SHEET NO.
BR-04—
SHEET
RNJ SHEET NO.
DENOTES EXCAVATION
IN WETLAND
SITE / 2
ENLARGEMENT
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
DENOTES IMPACTS IN
SURFACE WATER
J,
F..
;
I 1
�IgE1LdMIN RY PLANS
uo Nor vsa PoL CONSTRUCITON
• DENOTES MECHANIZED
• < < + CLEARING
i'
11t I
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PREPARED IN NC FIRM LICENSE No: 1-1506
DENOTES HAND
CLEARING IN WETLANDS
��
1
/ \
1
6
1 ''
;
E OFFICE OF. 301 13' ttev1110 bt.,
KC sgl:e 1600
KKISINGER CAMPO Ra(,igM1, NC 27601
ASSOCIATES 91g)989-]839
_.
/' ---------
11
PERMIT DRAWING
SHEET 6 OF 18
-----------------
------ -- ----- '�
_____---------------�� --- -
- - --- - -- - -
- --
----------
-------
----- _ --
- --
----------- -----------
----------
--------- -------------------- -
- -
-------
- -
-- - - -- ��----------- ------
-- 7--- _- 2===---- —
- ----------------------- -- ---------------------------
--------------------- —-------
------ _-
--------------
------ -_---- -----
'
1.-
1
9�
PDEco
F
-
-C---------j
I
ao�
,
I
I
,
��,�
y
-
SCALEo
1
II
I
I
I
I
Qo"icori A1919non
DENOTES FILL IN
WETLAND
PROJECT REFERENCE NO. SHEET NO.
BR-04—
SHEET
RNJ SHEET NO.
DENOTES EXCAVATION
IN WETLAND
SITE / 2 ENLARGEMENT
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
DENOTES IMPACTS IN
SURFACE WATER
f"
� /
�IgE1LdMIN d8Y PLANS
uo Nor vsa Po CONSTRVCTION
• DENOTES MECHANIZED
CLEARING
�/
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
AND 506
391 FByettev1110 b-1
PEEPA9Eg IN KCA NG F. LICENSE Xo: ...
DENOTES HAND
CLEARING IN WETLANDS
E E R(v
lg)B 1600
KKISINGER CAMPO 9810igM1, NG ]]691
ASSOOIA ES (91s)9b2-]839
\,`/
PERMIT DRAWING
/ SHEET 7 OF 18
OF
PDEK
D�
-�
_ _
------------
4H
----------------------------------
---
- -------- - - - -- -
-- - ----------------------------------- ----------S� 2'-,51,�"----------- - ---------------------------------------------------------------------------------------
E
F
F
F
m PDE
E
SCALEo
/ 20
Qo"icori A1019non
lil
PROJECT REFERENCE NO. SHEET NO.
TEMPORARY DETOUR
�f
� I; GEIN
III
:650093
BR-0118 5
R,W SHEET NO.
I
III
11
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
i/
,,Wp1OPq.... 1""ICPFFr4.
CARO/��i.
�qN CARO/�p�
I�
I
, i
,OQZN
�OYE /py:'9 �. @OYE oy'•.
1 I
bl
I
•: .;
a SEAL 9!'I . a SEAL 9!'.
1
'i 11
I
- -
043935 049338
F01NE Q':'�,J f01NE Q:•
DENOTES TEMPORARY
i/ /
`,\
FILL IN WETLAND
�/
1
s.,l
\
NG GRID
�'
j i
11
,
lg...... rNluuuLlo`
®DENOTES HAND
CLEARING IN WETLANDS
i� -�.
._�___
./ fl
„v i �`,� �& I
ZO\\
$3 NQ
\ / ' I '
II
1
DOCUMENT NOT CONSIDERED FINAL
1,i/per
i L
11
NpD
\/ --•y,' I
II
"1�
I, '
UNLESS ALL SIGNATURES COMPLETED
PREPAEEO IN ^ NC FIRM LICENSE No: C-1506
E OFFICE OF. K( A 301 ........I. St..
v N 1 027601
X
\
^ \ \
T
1
I
K�ISINGER CAMPO E113"i
ASSOCIATES (919)B82-r839
y i
I
PERMIT DRAWING
50.5'
va 42a --
%�8
sli
SHEET 8 OF 18
BLAy1
T.[lANS.-
-
„51 IIII _ JN«0, \"• �C
_ _
/
`\.
S,RLW\I hl 'ENANC - - - - ---- '-� _
- — -- _ __
a
— — _ -- __�
_ '
_ E ANCE
\I \
-
_
�
-_ --
DEAD END -_ 2(�,I(J--�________—_ __
w
---------- ------------------ w--- __- ---
_-_ AT=\ a _________________________ ____ "'-��r-'�
� _
'
_ - ----- ----- _ --_ _
_____ _________�
_� I
I
4
- (GPS MON)
65009_ 2
ERI & 5 �
� �T-93.58'
�I'
i
r
✓'
II 0 —_ - r
IIH
- -
--�__--EkIST �tTAr6V ENAryCE
/
___ —
l
__
/
TA -PR
,II\\IIII p
I �"
T TI
S L\� 1 �\ \I 1
1 I
1
1
.Y `\
'1/l /��
IIIIII1,11'1111
;
\\�\
Ac
•;1 '11','1111111111\\'��, ` `\ \ \\ \`\`, �I'Clc
SITE 4
1
-
w000$
3 SITE 3
�\,
I\ V p _
1\
-TL- ONSITE DETOUR (OVER JACK'S SWAMP)
----------------
------------
PI = 14+00.00
PI
= 11+75.00
Pl = 16+UU.UU
EL = 94.44'
VC = 150'
END
-
-
-
-
110
N
EL = 9424'
VC = 270'
VC = 90'
K = 32
S ) 35
MPH
-
L-
TA.17+
E
9.2
7TA.10+35.00
DS > 30 MPH
E
-
- E
I
E
K = 36
DS � 25 MPH
I�
-
L-
TA.
13
68.59
�
-T
- S
8.5
-100
-
--
--
--- ----
-L'
--
--
---
-
—
�l
TI3a
0%
---
---� F)1
F—
)
- .
pf},
---
---
-H.420
'
—( )`
--
_
—
go-
-
-
-
I
YR
SEL=
4.0'
-
XIS
ING
ROU
wSEL = 90.
'
I
s
-
80
70
I
I
I
I
I
I
I
-
I
I
I
I
I
I I
-
I
I
I
-
I I
-
I
-
I
I
I
I
70
I
I
I
I
4+4
10 11 12
13 14 15
16
17
Qo"icori A1019non
PROJECT REFERENCE NO. SHEET NO.
TEMPORARY DETOUR
I I
IIBR-oll
I�GE
N 650093
5
RNJ SHEET NO. _—
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
p.Pnp. ttpnPPPPq
tCAROjCARp..oN
o�......
Ny�9 �i
, 24�oYSEAL
24�oYSEAL N9`9
� � �
� � / �
� � �
-
043935 049338
��q;'•.�INjEM,.,�,;��r`d�``�' ��'.���� �INE,:'�Q .`�J
DENOTES TEMPORARY FILL IN WETLAND
/
I
GR{o
®DENOTES HAND /
CLEARING IN WETLANDS /
�l I
N�
g3 NQ 2 \ \
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
1/
Y `\,
\
III
P9EPA9EOCINOF. NO3. FayettRev113a bt1,506
E eFFl E KC
\
Suite 1500
K�ISINGER CAMPO MalaigM1, NC 27601
(919)9b2-7839
Y
Y
v
ASSOCIATES
3
�\ i
\
ION *x as.nm
PERMIT DRAWING
so.s'
9c
I
E�E� E 242ajma
-Wo
{
SHEET 9 OF 18
7 R
� - J Woods gMlm m95a2 pZNE
1
\
\
24
I 1
\ �
0' SE TRANS.
-y
P/
INc=20' R
EXIST R/W ' MAI ENANCI
--------
- ..
I
—
5 74/ P .. .. - Hw ..
DEAD END -- ^' o �---- .. .. .. .- -. .. -_
-N
o ------------------------
`-�/
14111 -
650093-2
(GPS MON)
BRIDGE �T=9A.56' — —
o 0 0 o n —
I �r
qGR
—ExlST R/W.. .- . .-
——=---- — — —�� —------�---- _E_%IS_T
w %
R/W 9Y ENANCE
w
_ _
36.5' _
r
TAPER
s Vv
SITE 4
Wood
ITE 3
:v
I
�II
-TL- ONSITE DETOUR (OVER JACK'S SWAMP)
11111111H
#1
#±
- --------
I Ll
----------------
Pl = 14+00.00
VC = 90'
PI = is+0000
TL
ST
.10
35
00
PI = 11+75.0o
110
N
EL = 9424'
VC = 270
K = 32
S) 35 MPH
-
EL = 94.44'
VC = 150'
K = 36
END
-
L-
3WDEaq
TA.17+
9.2
---
t
E
-
DS > 30 MP H
- E
DS 25 MPH
-
L-
TA.
13
-T
- S
A.
4+
8.5
68.59
-�
-
--
--
-------
-�'
--
--
---
-
-
---
—
l
Fl
OL
-
I
--
—
—
---
-
—
—
—
—
-
90
-
-
-
-
-
-
�
�I
I
YR
SEL=
4.0'
—-
-
— -
-
-
-
-=XlSl
ING
ROU
wSEL = 90.
'
I
s
-
4+1
-
-
jjjl
-
-
I-
WR
-
-
I
Ao
10 11 12
13 14 15 16
17
cD
0 2.5 5 PROD. REFERENCE NO. SHEET
BR-0118 X-10
NO.
5
7C
654�
60
55
50
IT
A5
35
30
25
20
15
13
slff3
fl�l
5 20
25
0 35
40 45 50 1 55 60 65 70
5
--
PERMIT D RAW I N G
--
---
-
----
--------
-
14-
SHEETO F 18
IF
-
-
---
---
-
-� -
--
--
--
44
JhLH
Aft
I
----
--
--
--
—
w
o
-
X
Lu
a
Ec
#10.
25
0.
C
a
_
—
—
_
tt
w
/
----
—
9595
/
TFIT
-
-
-
-
-
-
N
c
OMill
W
M
tiLL
-------
-
--
-------
O
---
---
-------
d
O
If�\I
--
--
-- —
L
LLj
41
O'
In
C
O
25
-
--
—
- -
-
U
i
O
-- -
-
---
---
-------
-
-----
---
-
--
LL
m
94
40
a 3
+
0.00
-
-
-
CM
�r
OMU
OXY
X
pNQ
N�
m
%y
mc� [
5
50
5
30
25
20
1
l
1
1 20
2
0 35
0
5
0
5
0
5
0
PROL REFERENCE NO. SHEET NO.
BR-0118 X-11
5
7C
654�
60
55
50
IT
15
35
30
25
20
1
�13
slff
0I 13
fl�l
5 20
25
TF
0 35
40 45 50 1 55 60 65 70 75
-
-
-
-
-
-
-
- PERMIT D RAW I N G
---
--
-
-------
-
---
---
---
----
-
- -- SHEET 15 OF 18
z
Q
�
W
-
�5'
0.08
— ---
----
0.
25
—
—
0.0
----
5
OS
—
—
--
---
-
-
---
---
-------
---
_
--
--
---
---
---
---
-----
-
---
---(35
--
--
---
----
-
------
-
\�
----
ui
---
----
—
—
—
—
--
—
95
-
63
---�
----
-
--
-
-
-
-
.00
ttHill
a
cI
}
O
0
co
m
-----
---
---
---
--
-
-
--
-------
9
9
c
O
i-
-
-
- _
—
W
H
G'
d
U
O
---
---
-
-------
--
--
-------
---
---
c-
0.
25
0
025
_
M
Q'c-
IIIIIIi-
XI
c-
C
O
a
-
-
-
-
-
- -
-
-
-
_
L
W
---
--
---
-
--
---
O]
L
-
-
-
87
00
-
CM
'r
O(nU
OXY
X
pNQ
N�
%y
mo
-
5
- _
50
- _
5
- _
30
- - - - -
25
-
20
- -
-
1
l
1
1
20
25
-
0 35
0
5
0
5
0
5
cD
N
—
0 2.5 5 PROD. REFERENCE NO.
�TT BR-0118
SHEET NO.
X-3
54
5
0
5
50
5
5
30
25
20
1
1
1
tl
20
25
0 35
40 5 50 55 60 65 70
-
-
PERMIT D RAW I N G
---
---
--
---
---
--
---
---
---
-------
--
---- ---
SHEET 16 OF 18
-
-
-
-
-
-
-
-tH-
B
-
-
7##
#Td-
i
r
E
44-�
44
TIL
--- - -----------
--
----------
-7111
-
-
-
-
o
LL
--
-
-------
-
---
---
ITFR
�,
J
w
o
In
--
--
LJ
Inn
-
L
-
-
U
0.
25
--F#:FF
-
—
-
-
-
-LLJ-
-
-
-
a
o—
— —
—
— —
—
— —
— — — —
— —.— -
--
-------
---
---
---
----
—
--
—
m
m
—
—
—
—
—
—
9
GEO
0� i�a
EXTILE
G
—
—
—
—
—
°
—
—
13
+
on
—
—
—
—
— —
—
—
—
—
— —
—
E
O
C
W
H
LU
G
d
1
Q
9
W
Cl)
O
ton
c
n
O
0
R
— —
-
OS
0.
25
i
O
B
—
LU
O]2-2
-
--
IFF�
—
-
-
91
GEO
93 MATTING
EXTIL
-
—
————
— —
—
O]M
�r
O nU
OXY
X
ONQ
^
%y
mc� [
5
50
5
30 -
25
20
1
- l
L�m
1
1 20
25
—
0 35
0
5 -
0
5
0 -
5
0
cD
0 2.5 5 PROD. REFERENCE NO.
BR-0118
SHEET NO.
X-5
54
5
0
5
50
5
5
30
25
20
1
1
1
tl
20
25
0 35
40 5 50 55 60 65 70
5
-
-
PERMIT D RAW I N G
---
---
---
- ---------
SHEET 17 OF 18
---
--
-
-------
-
JMI
ttj
a
z
r-
LU
o
�
WH
LLJ
U-)
c
(::�4
--1
--
---
--
---
---
---
---
-
---
---
-------
-
W
---
� ---
---- Q
(
-
---
---
--
--
--
-------
-
—
--
-
-
-------
---
-
2
-
-
-
-
-
-
—
-
-
-
-
\
\
Lu
a
-
-
-
-
30.8'
-
E
GE_
8//2�� MATTING
TEXTI
E
_
091
ro
m
m
y
-
-
-
—
-
—
-
-
—_
-
-
-
4
Y-
_
-
_
-
—
-
-
-
— -
-
-
-
-
-
-
-
-
—_
N
E
O
C
W
H
_
Ai
-
-
—_ _ —_
—_
—_
—_ _ —_
—_
U
9
ti
O
O
too
-
-Q-
0.(25
-
IoRc
-
-
-
a
E
R
-_
L
i
O
-
-
91,53
77
-
O]
L
CM
�r
, (Xuhit
Y
X
NNQ
;c___
o^
l
L
4-
1
1
20
25
-
0 35
0
--
5
0
5
0 6
70
N
5
50
5
30
25
20
1
%y
mc� [
evise
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
11+47 L / 13+45.4 L
Roadway Crossing
0.03
0.02
< 0.01
1
13+45.4 L / 13+85 L
Proposed Bridge
< 0.01
0.01
< 0.01
< 0.01
53
2
14+00 L / 14+39.4 L
Proposed Bridge
< 0.01
< 0.01
< 0.01
2
14+00 L / 14+70 L
Bank Stabilization
< 0.01
125
2
14+39.4 L / 16+54 L
Roadway Crossing
0.03
< 0.01
3
11+70 TL / 13+77 TL
Temp. Detour Crossing
0.09
0.02
4
14+21 TL / 16+52 TL
Temp. Detour Crossing
0.11
0.03
TOTALS*:
0.07
0.19
0.02
0.03
1 0.05
< 0.01
1 < 0.01
1 125
53
1 0
*Rounded totals are sum of actual impacts
NOTES:
Permanent SW impacts: 375 sq.ft
Temp. SW impacts: 166 sq.ft
There will be <0.01 ac of Temporary Fill in Hand Clearing Areas for Erosion Control Measures
Revised 2018 Feb