Loading...
HomeMy WebLinkAbout20200399 Ver 1_More Information Received_20200402Staff Review Does this application have all the attachments needed to accept it into the review process? C Yes C No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project r New Project w Existing ID r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) r Stream or Buffer Appeal New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Is this supplemental information that needs to be sent to the Corps?* r Yes r No Project Contact Information Name: Gordon Cashin VUio is subaitting the inforrration? Email Address: gcashin@ncdot.gov Project Information Existing ID #: Existing Version: 20200399 1 20170001(no dashes) Project Name: BR-0118 Northampton County Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown TIP#: WBS#: BR-0118 48827.1.1 (Applies to DOT projects only) County (ies) Northampton Please upload all files that need to be submited. Oickthe upload button or drag and drop files here to attach document BR-0118_PERMITS_WETLANDS_20200330.pdf 5.2MB Only pdt or kr17 files are accepted. Describe the attachments: Additional minimization has occurred in the design. Mechanized land clearing associated with the temporary detour has been changed to hand clearing. These changes have been made on the Summary Sheet and drawings in the attachments. Permanent impacts to wetlands have been reduced by 0.052 acre from 0.165 acre to 0.113 acre. The 0.052 acre is now hand clearing. Additionally, there will now be <0.01 ac of temporary fill in hand clearing areas for erosion control measures. The DMS Acceptance Letter will be forwarded as soon as it is available. DMS is having difficulty issuing the letter via teleworking. Sign and Submit V By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form." Signature: h e. 4&wsh ,1fl Submittal Date: 4/2/2020 Is filled in autorratically. Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Revised 4/2/2020 Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 11+47 L / 13+45.4 L Roadway Crossing 0.03 0.02 < 0.01 1 13+45.4 L / 13+85 L Proposed Bridge < 0.01 0.01 < 0.01 < 0.01 53 2 14+00 L / 14+39.4 L Proposed Bridge < 0.01 < 0.01 < 0.01 2 14+00 L / 14+70 L Bank Stabilization < 0.01 125 2 14+39.4 L / 16+54 L Roadway Crossing 0.03 < 0.01 3 11+70 TL / 13+77 TL Temp. Detour Crossing 0.09 0.02 4 14+21 TL / 16+52 TL Temp. Detour Crossing 0.11 0.03 TOTALS*:0.07 0.19 0.02 0.03 0.05 < 0.01 < 0.01 125 53 0 Revised 2018 Feb SHEET 18 OF 18 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS 48827.1.1 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 4/2/2020 Northampton BR-0118 *Rounded totals are sum of actual impacts NOTES: Permanent SW impacts: 375 sq.ft Temp. SW impacts: 166 sq.ft There will be <0.01 ac of Temporary Fill in Hand Clearing Areas for Erosion Control Measures Revised 4/2/2020