HomeMy WebLinkAbout20200399 Ver 1_More Information Received_20200402Staff Review
Does this application have all the attachments needed to accept it into the review process?
C Yes C No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: r
New Project
r
New Project w Existing ID
r
Pre -Application Submittal
r
More Information Response
r
Other Agency Comments
r
For the Record Only (Courtesy Copy)
r
Stream or Buffer Appeal
New Project - Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and
do not have the expectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response - Please check this type if you are responding to a request for information from staff and
you have and ID# and version for this response.
Other Agency Comments - Please check this if you are submitting comments on an existing project.
Is this supplemental information that needs to be sent to the Corps?*
r Yes r No
Project Contact Information
Name: Gordon Cashin
VUio is subaitting the inforrration?
Email Address: gcashin@ncdot.gov
Project Information
Existing ID #: Existing Version:
20200399 1
20170001(no dashes)
Project Name: BR-0118 Northampton County
Is this a public transportation project?
r Yes
r No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
TIP#: WBS#:
BR-0118 48827.1.1
(Applies to DOT projects only)
County (ies)
Northampton
Please upload all files that need to be submited.
Oickthe upload button or drag and drop files here to attach document
BR-0118_PERMITS_WETLANDS_20200330.pdf 5.2MB
Only pdt or kr17 files are accepted.
Describe the attachments:
Additional minimization has occurred in the design. Mechanized land clearing associated with the temporary
detour has been changed to hand clearing. These changes have been made on the Summary Sheet and
drawings in the attachments. Permanent impacts to wetlands have been reduced by 0.052 acre from 0.165
acre to 0.113 acre. The 0.052 acre is now hand clearing. Additionally, there will now be <0.01 ac of temporary
fill in hand clearing areas for erosion control measures.
The DMS Acceptance Letter will be forwarded as soon as it is available. DMS is having difficulty issuing the
letter via teleworking.
Sign and Submit
V By checking the box and signing box below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the
"Uniform Electronic Transactions Act")
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
• I intend to electronically sign and submit the online form."
Signature:
h e. 4&wsh ,1fl
Submittal Date: 4/2/2020
Is filled in autorratically.
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Revised 4/2/2020
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 11+47 L / 13+45.4 L Roadway Crossing 0.03 0.02 < 0.01
1 13+45.4 L / 13+85 L Proposed Bridge < 0.01 0.01 < 0.01 < 0.01 53
2 14+00 L / 14+39.4 L Proposed Bridge < 0.01 < 0.01 < 0.01
2 14+00 L / 14+70 L Bank Stabilization < 0.01 125
2 14+39.4 L / 16+54 L Roadway Crossing 0.03 < 0.01
3 11+70 TL / 13+77 TL Temp. Detour Crossing 0.09 0.02
4 14+21 TL / 16+52 TL Temp. Detour Crossing 0.11 0.03
TOTALS*:0.07 0.19 0.02 0.03 0.05 < 0.01 < 0.01 125 53 0
Revised 2018 Feb SHEET 18 OF 18
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
48827.1.1
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
4/2/2020
Northampton
BR-0118
*Rounded totals are sum of actual impacts
NOTES:
Permanent SW impacts: 375 sq.ft
Temp. SW impacts: 166 sq.ft
There will be <0.01 ac of Temporary Fill in Hand Clearing Areas for Erosion Control Measures
Revised 4/2/2020