HomeMy WebLinkAbout20200192 Ver 1_More Information Received_20200402Staff Review
Does this application have all the attachments needed to accept it into the review process?
r Yes r No
ID#* Version* 1
20200192
Is this project a public transportation project?* r Yes
r No
Is this a DOT r Yes r No
project?*
Reviewer List:* Donna Hood:eads\drhood
Select Reviewing Office:* Mooresville Regional Office - (704) 663-1699
Does this project require a request for payment to be sent?*
r
Yes
r
No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: r
New Project
r
New Project w Existing ID
r
Pre -Application Submittal
r
More Information Response
r
Other Agency Comments
r
For the Record Only (Courtesy Copy)
r
Stream or Buffer Appeal
New Project - Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and
do not have the expectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response - Please check this type if you are responding to a request for information from staff and
you have and ID# and version for this response.
Other Agency Comments - Please check this if you are submitting comments on an existing project.
Is this supplemental information that needs to be sent to the Corps?*
r Yes r No
Project Contact Information
Name: Larry Thompson
Vft is subrritting the inforrration?
Email Address: Ihompson@ncdot.gov
Project Information
Existing ID #: Existing Version:
20200192 1
20170001(no dashes)
Project Name: NC DOT TIP# U-5108 Extension of Northcross Drive to Westmoreland Road
Cornelius and Huntersville
Is this a public transportation project?
r Yes
r No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
TIP#: WBS#:
U-5108 46425.1.1
(Applies to DOT projects only)
County (ies)
Mecklenburg
Please upload all files that need to be submited.
Oickthe upload button or drag and drop files here to attach document
FINAL U-5108 PCN 20200402.pdf 269.89KB
Only pdt or Iv17 files are accepted.
Describe the attachments:
Comments from Ms Donna Hood:
1. Clarification that the 'cold' box checked for mitigation type was a mistake and only the 'warm' box was
supposed to be checked. This is not on the ePCN but on the submitted file for the `compiled PCN'. I am
guessing this was a copy of the entire PCN that was submitted to the Corps. Anyway, an email response
correcting that is fine. I realize it is correct on the ePCN submittal.
Page 6 of the attached revised PCN has been revised to remove the checked 'cold' box.
2. What are the temporary impacts on McDowell Creek? Are they in addition to the permanent impacts or the
same footprint as the permanent impacts?
The temporary impacts on McDowell Creek were requested to provide the contractor 101f upstream and 101f
downstream (201f total each site) to install cofferdams or pumped diversions in order to work in dry conditions
necessary to properly key -in the rip -rap down the bank and into the toe of the channel bed. These are
counted separately from the permanent impacts.
3. On the ePCN the incorrect box is checked on Part G, 3. Cumulative Impacts. An indirect and cumulative
impact study has been done on this project prior to submittal, so all of that question has been answered
incorrectly.
Part G, 3 Indirect and Cumulative Impacts have been revised per your comments in the attached PCN.
Sign and Submit
W By checking the box and signing box below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the
"Uniform Electronic Transactions Act")
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
• I intend to electronically sign and submit the online form."
Signature:
Submittal Date: April 2, 2020
Is filled in autorratically.