HomeMy WebLinkAbout20021045 Ver 1_COMPLETE FILE_20020624NjA Michael F. Easley, Governor
0 RpG William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
?- Alan W. Klimek, P.E. Director
Division of Water Quality
Warren G. Whichard and William H. Whichard, Jr.
511 Baylake Drive
Chocowinity, NC, 27817
APPROVAL of 401 Water Quality Certification
Dear Messrs. Whichard:
July 30, 2002
DWQ# 02-1045
Beaufort County
You have our approval, in accordance with the attached conditions, to place fill in 0.08 acre of non-vegetated wetlands in order
to fill in an existing basin with a bulkhead and backfill the area and replace approximately 82 feet of existing bulkhead on your property in
Beaufort County, as described in your application received by the Division of Water Quality on June 24, 2002. After reviewing your
application, we have determined that this fill is covered by General Water Quality Certification Number 3371, which can be downloaded
from our web site at http://h2o.enr.state.ne.us/ncwetiands . This Certification allows you to use your CAMA Permit when it is issued by
the NC Division of Coastal Management. In addition, you should get any other federal, state or local permits before you go ahead with
your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. Also
this approval will expire when the accompanying CAMA Permit expires unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application. If you change your project, you
must notify us in writing and you may be required to send us a new application for a new certification. If the property is sold, the new
owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total
wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC
2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60
days of the date that you receive this letter. To ask for a hearing, send a written petition conforming to Chapter 150B of the North
Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its.
conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any
questions, please telephone Tom Steffens or Deborah Sawyer in our Washington Regional Office at (252) 946-6481 or Cyndi Karoly in
our Central Office in Raleigh at (919) 733-9721.
Si r
Klimek, E.
AW K/cbk
Attachments
cc: Corps of Engineers Washington Field Office
Washington DWQ Regional Office
Central Files
File Copy
Doug Huggett
Hood Richardson, 110 West Second Street, Washington, NC, 27889
021045
N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015
iJE
Customer Service
1 800 623-7748
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Warren G. Whichard and. William H. Whichard, Jr.
2. LOCATION OF PROJECT SITE: Beaufort County off SR 1166 at Whichards Beach on a manmade
basin and canal off the Pamlico River near Washington, North Carolina
Photo Index - 2000: 100-1140; B-17 1995: 100-1062; C-10
State Plane Coordinates - X: 2,588,000 Y: 644,500
Washington Quad. (Lower right corner)
GPS Rover. File #11060615A
3. INVESTIGATION TYPE: CAMA and D/F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 06/06/02
Was Applicant Present - NO
5. PROCESSING PROCEDURE: Application Received - 06/12/02
Office - Washington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Beaufort County
Land Classification From LUP - Conservation (water, wetlands), Rural (land)
(B) AEC(s) Involved: EW, PTA, ES
(C) Water Dependent: YES
(D) Intended Use: Commercial
(E) Wastewater Treatment: Existing - Septic tanks and drain fields
Planned - N/A
(F) Type of Structures: Existing - Pavilion, campground, bulkhead, boat ramp, and marina
Planned - Bulkhead
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION: [AREA]
Vegetated Wetlands
(B) Non-Vegetated Wetlands I I ±3,698 ft2
Manmade basin bottom
Other
(D) Total Area Disturbed: ±0.08 acres (±3,698 ft2)
(E) Primary Nursery Area: NO
(F) Water Classification: SB-NSW Open: NO
8. PROJECT SUMMARY: The applicant proposes to fill in an existing basin with a bulkhead and
backfill the area and replace ±82' of existing bulkhead.
Warren Whichard
Whichards Beach
Project setting
The project site is located at the end of SR 1166 at Whichards Beach near the Town of
Chocowinity in Beaufort County, North Carolina. Whichard Beach is a commercial campground,
beach and marina complex located on the Pamlico Ri-er and a series of manmade canals. The site
encompasses ±186 acres and is vegetated with lawn grass, hardwoods, pines and ornamental shrubs.
The project area is vegetated with lawn grass and several cypress trees. The property in the vicinity
of the project area is bulkheaded and has various docks and finger piers to create numerous slips for
the existing marina complex. The project area is an existing basin and boat ramp area that is
bulkheaded with an existing 15 inch drain tile which empties into the back of the basin. The project
site is approximately 3' above the normal water level.
The manmade basin and canal connect to the Pamlico River which is classified as SB-NSW
by the Environmental Management Commission. The Pamlico River at the project site is coastal
water but is closed to shell fishing.
Project description
The applicant proposes to close off and fill the existing ±82' by ±27' and ±40' by ±33'
manmade basin by constructing a new 70' bulkhead from corner to corner of the existing bulkhead.
Approximately 3,534 ft2 are proposed to be filled in the manmade basin. The existing 15" culvert
will be extended to the newly installed bulkhead. The applicant also proposes to replace ±82' of
existing bulkhead T waterward of the existing alignment on the downstream side of the basin area.
Anticipated impacts
The project as proposed will result in the filling of +3,698 ft' of a manmade basin and canal
bottom adjacent the Pamlico River. The project as proposed will result in localized turbidity as a
result of the construction activities.
David W. Moye - 12 June 2002
Warren G. Whichard
William H. Whichard, Jr.
Whichards Beach
June 10, 2002
Narrative:
The owner proposes to fill a small boat basin and boat ramp in order to get more efficient
use of this area for boating and fishing. The area to be filled is man-made.
A bulkhead of PVC and/or wood will extend across the mouth of the area to be filled.
Fill will then be placed and the existing culvert extended thru the bulkhead.
Sediment will be controlled by the bulkhead and the planting of grass.
Form DCM-MP-1
APPLICATION
(To be completed by all applicants)
1. APPLICANT
a. Landowner:
.Warren.G. Whichard
.Name William H Whichard Jr
Address 511 B,aylake Drive -?
---------------
City. Chocowinity State NC
Zip 27817 Day Phone 252-946-4727
Fax N/A
b. Authorized Agent:
Name Hood Richardson
Address 110 West Second Street
City Washington, State NC
Zip 27889 Day Phone 252-975-3472
Fax 252-975-3751
Project name (if any) Whichards Beach
NOTE. • Permdt will be issued in manse of kndo*%er(.l, ad/or
project name.
. LOCATION OF PROPOSED
PROJECT
County- Re au f o rt
b. City, town, community or landmark
Between Washington and Chocowinity
at end of Wha.c ar s Beac oa
c. Street address or secondary road number
_,SR 1166
d. Is proposed work within city limits or planning
jurisdiction? Yes X _ No
e. Name of body of water nearest project (e.g. river,
creek, sound, bay) PAmi loo River
3. DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. List all development activities you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or flUing activities.
Fill man-made excavation. Install
about 75 feet of new bulkhead. Remove
old bulkhead and Pilings. Extend
existin culvert to new bulkhea ,
ri l ctu}?9ef et o woo bulRE -ea-ff w i t I
b• ?Spropos activity maintenance of an existin
project, new work, or both? Both g
c. Will the project be for public, private or commercial
use? _Comme rc i -I
d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If more space is needed, please attach
additional pages. Fill existing man-made
boat basin and boat ramp so area can
be more efficiently used Construct
75 feet of new bulkhead-,remove old
bulkhead and pilings. Place fill
head. Re lace 169 feet
of wood bulkhead with vinyl bulkhead.
•:vWd 03/95
0
Form DCM-MP-1
4. LAND AND WATER
CHARACTERISTICS
a. Size of entire tract About 186 acres
b. Size of individual lot(s) N/A
c. Approximate elevation of tract above MHW or
NWL 3 feet
d. Soil type(s) and texture(s) of tract
Sandy silts
e. Vegetation on tract Trees and arass
f. Man-made features now on tract Pavilion,
amusement rides, campers, boat
dock.
g. What is the CAMA Land Use Plan land
classification of the site? (c;pmult.the load land use play.)
Conservation Transitional
Developed Community
_x Rural with Other
services
h. How is the tract zoned by local government?
Not zoned
I. Is the proposed project consistent with the applicable
zoning? Yes N/A No
(Attach zoning conpliance certlfiaue, tf applicable)
j. Has a professional archaeological assessment been
done for the tract? Yes No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes __ x _ No
1. Are there wetlands on the site? Yes _ x No
Coastal (marsh) _____ Other _
If yes, has a delineation been conducted? ?N/A
(Attach documentation, if available)
Revised 03195
in. Describe existing wastewater treatment facilities.
Septic tanks.
U. Describe location and type of discharges to waters
of the state. (For example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down" and residential discharges.) Surface
run off.
o. Describe existing drinking water supply source.
Wells, public water from Beaufort
County Water System is available
5. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims tide
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims tide, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11 " white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
.applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
a
,r
Form DCM-MP-1
site. Include highway or secondary road (SR)
numbers, landmarks, and the like.
• A Stormwater Certification, if one is necessary.
• A list. of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such.landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name Hubert S. Wainwright
Address 279 Portside Drive
Phone Chocowinity, NC 27817
Name Donnon Robert Jefferson
Address 4 4 2 2 Reedy Branch Road
Phone Winterville, NC 28590
Name
Address
Phone
• A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
. _Several Minor permits.
• A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
• A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the project involves the expenditure of public
funds or use of public lands, attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
6. CERTIFICATION AND PERMISSION
TO ENTER ON LAND
I understand that any permit issued in response to this
application will allow only the development described in
the application. The project will be subject to conditions
and restrictions contained is the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
I further certify that the information provided in this
application is truthful to the best of my knowledge.'
This is the _day of? 19'-
Print Name hic
Signature
r or Autho ed Agent ,
Please indicate attachments pertaining to your proposed
project.
Yes DCM MP-2 Excavation and Fill Information
No DCM MP-3 Upland Development
No DCM. MP4 Structures Information
Yes DCM MP-5 Bridges and Culverts
No DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
Revised 03/95 J#
Form DCM-MP-2
Warren G. Whichard
whichards Beach
EXCAVATION
NOTE: Work consist of filling
AND FILL man-made boat basin and
boat ramp.
(Except bridges and culverts)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-I. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
Describe below the purpose of proposed excavation or
fill activities. All values to be given in feet.
Average Fbal
Existing Project
Access
channel
(MLW) or (NWL)
Canal
Boat
basin
Boat
ramp
Rock
groin
Rock
breakwater
Other
(Excluding
shomline
stabilization)
Length Width Depth Depth
NO E
NO E
82' 27 -4' +3'
40 33 -3' +3'
NO E
NO E
w>
NO E
1. EXCAVATION
a. Amount of material to be excavated from below
MHW or NWL in cubic yards None.
b. Type of material to be excavated N/A
c. Does the area to be excavated include coastal
wetlands (marsh), submerged aquatic vegetation
(SAVs) or other wetlands? N/A Yes No
d. Highground excavation in cubic yards None
2. DISPOSAL OF EXCAVATED
MATERIAL NONE
a. Location of disposal area u / A
b. Dimensions of disposal area N/A
c. Do you claim title to disposal area? N/A
Yes No
If no, attach a letter granting permission from the
owner.
d. Will a disposal area be available for future
maintenance? Yes No N/A
If yes, where?
Revised 03/95
9
Form DCM-MP-2
e. Does the disposal area include any coastal wetlands
(marsh), SAVs or other wetlands?
N/A Yes No
f. Does the disposal include any area in the water?
N/A Yes No
3. SHORELINE STABILIZATION
a. Type of shoreline stabilization
- X Bulkhead - Riprap
b. Length 70 feet new and 169 feet of
replacement.
c. Average distance waterward of MHW or NWL
New 60 feet, replacement will be
2 feet from existing bulkhead.
d. Maximum distance waterward of MHW or NWL
82 feet new bulkhead, 2 feet from
replacement bulkhead.
e. Shoreline erosion during preceding 12 months
None.
(source of infor?notion) Area is bulkheaded.
f. Type of bulkhead or rprap material vinyl
Bulkhead.
g. Amount of fill in cubic yards to be placed below
water level
(1) Riprap None
(2) Bulkhead backfill 535 cubic yards
h. Type of fill material Loamy sand
i. Source of fill material off site
4. OTHER FILL ACTIVITIES
(Excluding Shoreline Stabilization)
a. Will fill material be brought to site?
Yes X No
Revised 03/95
If Yes,
(1) Amount of material to be placed in . the
water N /A _ -
(2) Dimensions of fill area _ N/A
(3) Purpose of fill N/A
b. Will fill material be placed in coastal wetlands
(marsh), SAVs or other wetlands?
Yes _ x No
If yes,
(1) Dimensions of fill area N/A
(2) Purpose of fill _N/A
S. GENERAL
a. How will excavated or fill material be kept on site
and erosion controlled? Construct bulk-
head before bring in fill.
b. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)?
Draaline, backhoe, dozer, trucks
c. Will wetlands be cr3ssed. in transporting equipment
to project site? Yes x_ No
If yes, explain steps that will be taken to lessen
environmental impacts.
X
Form DCM-MP-S
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
1. BRIDGES NONE
a. Public Private
b. Type of bridge (construction material)
C. Water body to be crossed by bridge
d. Water depth at the proposed crossing at MLW or
NWL
e. Will proposed bridge replace an existing bridge?
Yes No
If Yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
f. Will proposed bridge replace an existing culvert(s)?
Yes No
if yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
Revised 03195
Warren G. Whichard
Whichards Beach
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
g. Length of proposed bridge
h. Width of proposed bridge
i. Height of proposed bridge above wetlands
j. Will the proposed bridge affect existing water flow?
Yes No
If yes, explain
k. Navigation clearance underneath proposed bridge
1. Will the , proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? Yes No
If yes, explain
m. Will the proposed bridge cross wetlands containing
no navigable waters? Yes No
If yes, explain
n. Have you contacted the U.S. Coast Guard
concerning their approval?
Yes No
If yes, please provide record of their action.
9
Form DCM-MP-5
2. CULVERTS
a. Water body in which culvert is to be placed
Extend existing culvert to new
bulkhead.
b. Number of culverts proposed 1
c. Type of culvert (construction material, style)
15 inch concrete or plastic
culvert.
d. Will proposed culvert replace an existing bridge?
Yes _ W No
If yes,
(1) Length of existing bridge
(2) Width of existing bridge
(3) Navigation clearance underneath existing
bridge
(4) Will all, or a part of, the existing bridge be
removed? (Explain)
e. Will proposed culvert replace an existing culvert?
Yes X No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the NE11W or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
f. Length of proposed culvert A6 feet
j. Will the proposed culvert affect existing navigation
potential? Yes X No
If yes, explain
3. EXCAVATION AND FILL
a. Will the placement of the,proposed- bridge or culvert
require any excavation below the MEN or NWL?
Yes X No
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3) Depth of area to be excavated
(4) Amount of material to be excavated in cubic
yards _
b. Will the placement of the proposed bridge or culvert
require any excavation within:
Xg Coastal Wetlands Igo. SAVsUo_ Other Wetlands
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3). Amount of material to be excavated in cubic
yards
c. Will the placement of the proposed bridge or culvert
require any highground excavation?
Yes X No
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
(3) Amount of material to be excavated in cubic
yards
g. Width of proposed culvert 15 inches diameter d.
h.' Height of the top of the proposed culvert above the
MHW or NWL- 24 inches
i. Will the proposed culvert affect existing water flow?
Yes _g_ No
If yes, explain
Revised 03195
If the placement of the bridge or culvert involves
any excavation, please complete the following: None
(1) Location of the spoil disposal area
(2) Dimensions of spoil disposal area
(3) Do you claim title to the disposal area?
Yes No
if no, attach a letter granting permission from
the owner.
A,
Form DCM-M7-5
(4) Will the disposal area be available for future
maintenance? Yes No
(S) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
Yes No
If yes, give dimensions if different from (2)
above.
(6) Does the disposal area include any area below
the MHW or NWL? Yes ! No
If yes, give dimension if different from No. 2
above.
b. Will the proposed project require the relocation of
any existing utility lines? Yes x No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes x_ No
If yes, explain in detail
e. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed below
MHW or NWL? _ x Yes No
If yes,
(1) Length of area to be filled a 2 feet
(2) Width of area to be filled 60 feet average
(3) Purpose of fill Fill man-made boat
basin and ramp.
f. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
NQ Coastal Wetlands No SAVsRo Other Wetlands
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? Yes X No
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
4. GENERAL
a.
Will the proposed project involve any mitigation?
Yes , X _ No
if yes, explain in detail
Revised 03/95
d. Will the proposed project require any work
channels? Yes _ r No
If yes, complete Form DCM-MP-2
e. How will excavated or fill material be kept on site
and erosion controlled? Install bulkhead
before placing fill. All fill
will be contained by, the bulkhead.
f. What type of construction equipment will be used
(for example, dragline, backhoe or -hydraulic
dredge)? Trucks, dozer.
g. Will wetlands be crossed in transporting equipment
to project site? Yes , X No
If yes, explain steps that will be taken to lessen
environmental impacts.
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
X Yes No
If yes, explain in detail 1qew bulkhead
across mouth of boat basin
and boat ramp.
Whichards Beach
Date
-.
8'
A4 LT-WA
NCDENR
North Carolina Department of Environment and Natural
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director
June 19, 2002
MEMORANDUM
TO: John Domey
Division of Water Quality, Wetlands/401 Unit
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA PERMIT APPLICATION REVIEW
Resources
William G. Ross Jr., Secretary
JAI Z 4
_ WATT UQ 11Y SECTit?N
APPLICANT: WARREN WHICHARD AND WILLIAM WHICHARD, JR.
PROJECT LOCATION: ON MANMADE BASIN AND CANAL OFF THE PAMLICO
RIVER NEAR WASHINGTON, BEAUFORT COUNTY, NC
PROPOSED PROJECT: FILL AN EXISTING BASIN WITH A BULKHEAD AND
BACKFILL AND REPLACE EXISTING BULKHEAD
Please indicate below your agency's position or viewpoint on the proposed project and return
this form by July 10, 2002. If you have any questions regarding the proposed project, please
contact Doug Huggett at 733-2293. When appropriate, in-depth comments with supporting data
are requested.
REPLY
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are
incorporated.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE
1638 Mail Service Center, Raleigh, North Carolina 28699-1638
Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity \ Affirmative Action Employer -50% Recycled \ 10% Post Consumer Paper
L X_ WA
AG?la
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
June 19, 2002
MEMORANDUM
TO: John Domey
Division of Water Quality, Wetlands/401 Unit
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA PERMIT APPLICATION REVIEW
APPLICANT: WARREN WHICHARD AND WILLIAM WHICHARD, JR.
PROJECT LOCATION: ON MANMADE BASIN AND CANAL OFF THE PAMLICO
RIVER NEAR WASHINGTON, BEAUFORT COUNTY, NC
PROPOSED PROJECT: FILL AN EXISTING BASIN WITH A BULKHEAD AND
BACKFILL AND REPLACE EXISTING BULKHEAD
Please indicate below your agency's position or viewpoint on the proposed project and return
this form by July 10, 2002. If you have any questions regarding the proposed project, please
contact Doug Huggett at 733-2293. When appropriate, in-depth comments with supporting data
are requested.
REPLY
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are
incorporated.
This agency objects to the project for reasons described in the attached comments.
SIGNED
DATE
1638 Mail Service Center, Raleigh, North Carolina 28699-1638
Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity \ Affirmative Action Employer- 50% Recycled \ 10% Post Consumer Paper
MEMORANDUM
TO: John Dorney Regional Contact: tom steffens
Non-Discharge Branch WO Supervisor: Boger Thorpe
Date:
SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS
Facility Name Warren Whichard County Beaufort
Project Number 02 1045 County2
Recvd From DCM Region Washington
Received Date 6/24/02 Recvd By Region
Project Type bulkhead
Certificates' Stream' Stream Impacts (ft.)
Permit Wetland Wetland Wetland Stream Class Acres Feet
Type Type Impact Score Index Prim. Supp. Basin Req. Req. ME
LAMA Waters O 1' O N ? 29-(5) SB NSw 30,307. 0.08
TPBR
Mitigation Wetland
MitigationType Type Acres Feet
Is Wetland Rating Sheet Attached? O Y ON Did you request more info? O Y ON
Have Project Changes/Conditions Been Discussed With Applicant? O Y O N
Is Mitigation required? O Y O N Recommendation: O Issue O Issue/Cond O Deny
Provided by Region: Latitude (ddmmss) Longitude (ddmmss)
Comments:,
Issue n/c
cc: Regional Office
Central Office Page Number 1