Loading...
HomeMy WebLinkAbout20200285 Ver 1_More Info Requested_20200401Strickland, Bev From: Goss, Stephanie Sent: Wednesday, April 1, 2020 4:13 PM To: Hopper, Christopher D CIV (USA); brownenvgrp@gmail.com Subject: High Gate 3 Crossing / DWR Project # 20200285 / Johnston County Wyatt, On February 21, 2020, the Division of Water Resources (Division) received your application requesting a 401 Certification and Buffer Authorization from the Division for your project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until the following information is received. Please complete the following items in the application: • Please provide the Division a copy of your response from the U.S. Army Corps of Engineers requesting additional information. [15A NCAC 02H .0502(c)] [15A NCAC 02H .0502(c) • The Corps of Engineers must also verify the Nationwide Permit that is to be used to authorize this project. [15A NCAC 02H .0502(a)(7)] Pursuant to Title 15A NCAC 02B .0233 (8), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. Thanks in advance! Stephanie Z. Goss Environmental Specialist II Division of Water Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 276og 919-791-4256 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Hopper, Christopher D CIV (USA) <Christopher.D.Hopper@usace.army.mil> Sent: Tuesday, March 24, 2020 4:08 AM To: brownenvgrp@gmail.com Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov> Subject: [External] SAW-2020-00395 / High Gate 3 Crossing / 1294 Shotwell Road / Town of Clayton / Johnston County - INCOMPLETE NOTIFICATION External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to liort.spam@nc.gov Hello Wyatt: I hope this email finds you well. I'm writing to formalize our conversation last week. Per our discussion, the Pre - construction Notification (PCN) for the proposed High Gate 3 project (SAW-2020-00395), dated February, 212019 is incomplete. Please don't hesitate to call if there are any questions. 1) I'm unable to process the application without information about the site prior to development of the first two phases. Portions of wetlands had been located in the past associated with proposed crossings, and a soil stream is shown extending onto the property. Please work with the project owner to share any surveys and/or approvals received for this site prior to development. 2) We also cannot permit a road crossing that isn't associated with, or needed to construct, the project. Once we receive this information, we'll resume our review of this project. Please provide the requested information within 30 days, or your application will be withdrawn. Feel free to contact me with any questions or concerns. Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 35 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 fcorpsmapu.usace.army.mill. Thank you for taking the time to visit this site and complete the survey.