La r ry,
Hood, Donna
Wednesday, April 01, 2020 7:54 AM
Thompson, Larry B
Chapman, Amy; Carpenter,Kristi; Howard, Joel M; Haywood, Luther G; Braspennickx,
Nicholle M CIV USARMY CESAW (US); Ridings, Rob; Smith, Danny;
'monte.k.matthews@usace.army.mil'
RE: 17BP.10.C.6 (Pipe 301 - Hahn Road, Cabarrus County) On -Hold Response --Div.
10--2nd request for additional info
Follow up
Flagged
Thank you for your response. Please provide an updated ePCN submittal showing flood plain benches listed separately
from bank stabilization in the impact table. Flood plain benches are considered permanent fill to jurisdictional features
in the impact table and are therefore listed separately. Bank stabilization is considered a permanent impact and is
monitored by the North Carolina Division of Water Resources (NC DWR) through 401 permitting regulations but is not
considered permanent fill by the Army Corps of Engineers for 404 permitting purposes unless installed below the
ordinary high water mark. Because bank stabilization and floodplain benches are not the same kinds of impacts and are
tracked separately they should also be listed separately.
Also, for the corrected submittal, please add bank stabilization impacts for the reconstruction of the impacted stream
banks where the temporary diversion channel exits and then re-enters the existing stream.
If you need additional training or information on impacts, please do not hesitate to contact me for help.
Regards,
Donna Hood
From: Carpenter, Kristi
Sent: Tuesday, March 31, 2020 5:42 PM
To: Thompson, Larry B <Ihompson@ncdot.gov>; Hood, Donna <donna.hood@ncdenr.gov>
Cc: Howard, Joel M <jmhoward@ncdot.gov>; Haywood, Luther G <ghaywood@ncdot.gov>
Subject: RE: 17BP.10.C.6 (Pipe 301 - Hahn Road, Cabarrus County) On -Hold Response
La r ry,
I have a note in our system that we did receive some of the information requested on March 17t", however it was noted
there was still some information missing.
I have copied the reviewer, Donna Hood on this response so she can further assist in this matter.
I'm sure she can provide you with the latest update on the review of this project.
Also, I'd like to let you know that at this time most of our branch is working remotely, especially in the central office
where there have been positive cases of Covid19 identified. It has affected the way our mail is sorted and distributed
throughout the building. If you could help spread the word to include me on the More Information Responses via email,
or better yet send them in through our electronic form system it would mean we can still provide you with the most
efficient service possible.
You can find all the electronic forms available at the following link and you can always email me for any assistance or
clarification. https://deg.nc.gov/about/divisions/water-resources/water-quality-permitting/transportation-
permitting/transportation-permitting-applications-and-forms
Thanks,
Kristi Lynn
Kristi Lynn Carpenter
Administrative Assistant
401 & Buffer Transportation Permitting Branch
Department of Environmental Quality
Division of Water Resources
919.707.3872 office
kristilynn.carpenter(cancdenr.gov
512 N Salisbury Street, 12th Floor
1617 Mail Service Center
Raleigh, NC 27699-1617
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Thompson, Larry B <Ihompson@ncdot.gov>
Sent: Tuesday, March 31, 2020 5:11 PM
To: Carpenter, Kristi <kristilynn.carpenter@ncdenr.gov>
Cc: Howard, Joel M <jmhoward@ncdot.gov>; Haywood, Luther G <ghaywood@ncdot.gov>
Subject: FW: 17BP.10.C.6 (Pipe 301 - Hahn Road, Cabarrus County) On -Hold Response
Hi Kristi,
We received an "on -hold" letter for 17BP.10.C.6 on March 6 and sent out this response on March 9th. Do you know if
this permit is being worked on or whether we may expect to receive a request for additional information?
Thank you,
Larry
Larry Thompson
Division PDEA Engineer
North Carolina Department of Transportation
704-983-4437 office
704-301-4881 mobile
Ithompsona-ncdot.gov
716 W. Main Street
Albemarle, NC 28001
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Thompson, Larry B
Sent: Monday, March 9, 2020 10:13 AM
To: Smith, Danny <danny.smith@ncdenr.gov>
Cc: Chapman, Amy <amy.chapman@ncdenr.gov>; Hood, Donna <donna.hood@ncdenr.gov>; Carpenter, Kristi
<kristilynn.carpenter@ncdenr.gov>; Howard, Joel M <jmhoward@ncdot.gov>; Haywood, Luther G
<ghaywood@ncdot.gov>; Braspennickx, Nicholle M CIV USARMY CESAW (US)
<Nicholle. M.Braspennickx@usace.army.mil>; Ridings, Rob <rob.ridings@ncdenr.gov>
Subject: 17BP.10.C.6 (Pipe 301 - Hahn Road, Cabarrus County) On -Hold Response
Mr. Smith,
Attached you will find NCDOT's response to your on -hold letter dated March 6, 2020. Please let me know if I can be of
further assistance.
Regards,
Larry Thompson
Division PDEA Engineer
North Carolina Department of Transportation
704-301-4881 mobile
704-983-4437 office
Ihompson@ncdot.gov
716 W. Main Street
Albemarle, NC 28001
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.