Loading...
HomeMy WebLinkAbout20200046 Ver 1_Email_20200331Carpenter, Kristi From: Thompson, Larry B Sent: Tuesday, March 31, 2020 5:11 PM To: Carpenter,Kristi Cc: Howard, Joel M; Haywood, Luther G Subject: FW: 17BP.10.C.6 (Pipe 301 - Hahn Road, Cabarrus County) On -Hold Response Attachments: 17BP.10.C.6 On Hold Response (03-09-20).pdf Follow Up Flag: Follow up Flag Status: Flagged Hi Kristi, We received an "on -hold" letter for 17BP.10.C.6 on March 6 and sent out this response on March 9t". Do you know if this permit is being worked on or whether we may expect to receive a request for additional information? Thank you, Larry Larry Thompson Division PDEA Engineer North Carolina Department of Transportation 704-983-4437 office 704-301-4881 mobile Ithompsona-ncdot.gov 716 W. Main Street Albemarle, NC 28001 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Thompson, Larry B Sent: Monday, March 9, 2020 10:13 AM To: Smith, Danny <danny.smith@ncdenr.gov> Cc: Chapman, Amy <amy.chapman@ncdenr.gov>; Hood, Donna <donna.hood@ncdenr.gov>; Carpenter, Kristi <kristilynn.carpenter@ncdenr.gov>; Howard, Joel M <jmhoward@ncdot.gov>; Haywood, Luther G <ghaywood@ncdot.gov>; Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle. M.Braspennickx@usace.army.mil>; Ridings, Rob <rob.ridings@ncdenr.gov> Subject: 17BP.10.C.6 (Pipe 301 - Hahn Road, Cabarrus County) On -Hold Response Mr. Smith, Attached you will find NCDOT's response to your on -hold letter dated March 6, 2020. Please let me know if I can be of further assistance. Regards, Larry Thompson Division PDEA Engineer North Carolina Department of Transportation 704-301-4881 mobile 704-983-4437 office Ihompson@ncdot.gov 716 W. Main Street Albemarle, NC 28001 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. STA�TF w+ HOR ay�'mEy,;,rs�md`�2 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR March 9, 2020 S. Daniel Smith Director Division of Water Resources 512 North Salisbury Street Raleigh, NC 27699 J. ERIC BOYETTE SECRETARY Subject: Proposed replacement of Pipe 301 or SR 2608 (Hahn Road) in Cabarrus County ePCN Submittal Date: January 8, 2020 WBS# 17BP.10.C.6, State Project No. SF-120301, BIMS# 20200046 Dear Mr. Smith The North Carolina Department of Transportation (NCDOT) is in receipt of your "On Hold" letter dated March 6, 2020 for the above referenced project and would like to address the cited deficiencies by offering the following responses: Permanent impacts for flood plain benches are not listed in the impact table: In the impact table, we listed "bank stabilization" and included a note in the bottom `Bank Stabilization Includes Floodplain Bench". The bank stabilization lines impacts are shown as permanent impacts. If preferred, we can change the description "bank stabilization" to "floodplain bench". Flood plain bench impacts are accurately accounted for. Description with associated drawings for proposed temporary channel impacts: There will be a temporary diversion channel constructed around the proposed box culvert during construction (construction sequence attached to this response). The temporary impacts take into consideration the stream channel that is relocated outside of that which is permanently impacted. NCDOT can describe the temporary channel impacts as "dewatering" if that is preferred. If you have any questions or require any additional information, please feel free to contact me at (704) 301-4881 or by email at: lthomspon@ncdot.gov. Sincerelv. Docu3igfned by: 1 �t,aw►psow Division 10 PDEA Engineer Enc: 17BP.10.C.6 Construction Sequence Mailing Address: Telephone: (704) 983-4400 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (704) 982-3146 DIVISION 10 DIVISION OF HIGHWAYS Customer Service: 1-877-368-4968 716 W. MAIN STREET 716 W. MAIN STREET ALBEMARLE, NC 28001 ALBEMARLE, NC 28001 Website: ncdot.gov Cc: Nicholle Braspennickx, USACE Amy Chapman, NCDWR Donna Hood, NCDWR Kristi Carpenter, NCDWR Joel Howard, NCDOT Garland Haywood, NCDOT SHEET NO. C-03AICONST 2@10 1 X8 I RCBC CONSTRUCTION STA.17+76 -L- LITTLE BEAR PHASE 1.) CONSTRUCT STILLING BASIN #1. 2.) CONSTRUCT TEMPORARY CHANNEL CHANGE WITH LINER (SEE DETAIL) AND INSTALL IMPERVIOUS DIKES #1 AND #2. 3.) DEWATER CONSTRUCTION AREA UTILIZING STILLING BASIN #1 FOR PUMPED EFFLUENT. 4.) REMOVE EXISTING ARCH CMPS. 5.) CONSTRUCT 2910'X8' RCBC, INLET CHANNEL W/FLOODPLAIN BENCH, AND OUTLET CHANNEL W/FLOODPLAIN BENCH. 6.) EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES. TEMPORARY CHANNEL I I I 1 1 1 1 I 1 1 1 1 ► 1 CHANGE WITH LINER 1 I 1 1 i � � � j I j I I I l / JI 1 � 1/ j l l C� / I lB I/ RITI /7 117I REMOVE m ITI I G ARC / CMPS cr� l I I l C / � �, / �� // // / <R / E STING/�R/W \� 1 O �._ O HAH/U R6 /8' BST AGRE —'F TI-N; -R -- �2i\S��\ -IL xxI"I'1 I I I II \ 3 4 /� 0 �\ � ll I � i I I II I I II I I II ► I � �////� � / /�� \ ,111 \ I II I I I I I I I I I I I I I I I I I Ln I I/ I I I I I I I l i I l i I I i I I I I I i I// ► POND / 11111 I �11 � II I I II I I I I I I I I I I I I i I 1 C� I / IIII I I I I I I I I I I I I I I I 1 1 1 1 1 1 Ln11 STILLING BASIN #1 l l l l i l l SIZE: 30' (BASIN TOP LENGTH x 15' BASIN TOP WIDTH c I x 3' 2 0' 10' 0 2 0' 40' SCALE: 1" = 20' (BASIN DEPTH) WITH 2:1 SIDE SLOPES, MIN. CAPACITY: 34 CY ge Qz SEQUENCE CREEK 7.) REMOVE STILLING BASIN #1, IMPERVIOUS DIKES, AND TEMPORARY CHANNEL CHANGE W/LINER, AND DIVERT FLOW THROUGH 2@10'X8' RCBC. 8.) COMPLETE ROADWAY. INLET CHANNEL i i • r W/FLOODPLAIN BENCH � -SEE DETAIL 2�bc, EST. 45 T_O­NS�-LASS II RIPS RAP IMPERVIOUS nlvr. 14-11 PROJECT REFERENCE NO. 17BF.10.C.6 RW SHEET NO. ROADWAY DESIGN ENGINEER / / I 100' Ta er I' � / 00, / / / ti LT & RT EOT BL -10 2 ' `O `R=175' R I/ a08 /6 C. C-f /Wl \ 7 // I � C^ L-103 = ,+N R=201 Ix LOW,W RE 567 / 8 o C U_7 / ---- CU / CUL6 �E2/HW�— 60 01 22J / I I V II \\ II I �--- BM-2 J x Qzz- I 00 IMPERVIOUS DIKE #2 i1 OUTLET CMAN.P4EL W/FLOODPLAIN BENCH SEE DETAIL 2 EST. 35 TONS CLASS II RIP RAP \ HYDRAULICS ENGINEER DETAIL TEMP CHANNEL CHANGE W/LINER ( Not to Scale) Natural Natural Ground �y D �,•.� Ground d B Min. D = 1.5 Ft. Max. d = 1.5 Ft. B — 2.0 Ft. Type of Liner= GEOTEXTILE (NCDOT Type 4)