Loading...
HomeMy WebLinkAbout20020846 Ver 1_COMPLETE FILE_20020529ti ATLANTIC DIVING & MARINE CONTRACTORS, INC. 3330 RIVER ROAD • WILMINGTON, NORTH CAROLINA 28412 October 03, 2002 North Carolina Division of Water Quality 401/Wetlands Unit 1621 Mail Center Raleigh, NC 27699-1621 4 E o Enclosed please find correct certification. The certification mailed to you in September was signed in the incorrect place please replace it with this corrected copy. Thank-you for your assistance and accept our apology for any inconvenience. Regards, Michael E. McCarley (910) 791-2411 • FAX (910) 791-4054 DWQ Project No.: 020846 County: New Hanover Applicant: Carolina Power & Light Cnmpany Project Name: Sutton Steam Plant Barge Slip Dredging Date of Issuance of 401 Water Quality Certification: 06/26/02 Certificate of Completion Upon completion of all work approved :within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 40I/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-162 1. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification • /t° hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water u ity C rtific 'on C? B er Rules approved plans and specifications, and other supporting materials. Signature: _ - - Date: - _A '-C, ?-_ Engineer's Certifi tion Partial Final 1. as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby. state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans a4d specifications, and other supporting materials. Signature Date Registration No. Mail to: 401 Wetlands Contact NC Dept. of Environment and Natural Resources 127 Cardnal Drive Ext. Wilmington, NC 2340-5-2004 WMI ?O G o .? micnaei r•. Casey, t'ovemor W G. North Carolina Department of Enviromi ent and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality June 26, 2002 Carolina Power and Light Company Attn: Mr. Kent Tyndall 801 Sutton Steam Plant Road Wilmington, NC.28401-8357 SUBJECT: Approval of 401 Water Quality and Additional Conditions Sutton Stream Plant DWQ Project # 020846 New Hanover County Dear Mr. Tyndall: You have our approval, in accordance with the attached conditions (WQC # 3371) to do the following activity at 801 Sutton Steam Plant Road in Wilmington in New Hanover County. This approval allows you to: 1). Dredge 60,000 square feet of shallow bottom habitat (22,000 cubic yards of material to be removed) for maintenance dredging of a boat/barge basin. This approval is only valid for the purpose and design that you described in your CAMA application dated April 17, 2002 received by the Division of Water Quality (DWQ). After reviewing your application, we have determined that General Water Quality Certification Number 3371 covers this activity. This Certification can also be found on line at: http:/Wo.enr.state.nc.us/ncwetlands/certs.html. This Certification allows you to use your CAMA Permit when the NC Division of Coastal Management issues it. Please keep in mind that there may be additional Federal, State or Local regulations applicable to your project, such as (but not limited to) Sediment and Erosion Control, Non- Discharge and Water Supply Watershed regulations and Coastal Stormwater. In addition, this approval will expire when the accompanying 404 or CAMA Peat expires unless otherwise specified in the General Certification. Please be aware that if you change or modify your project, you must notify the Division (DWQ) in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and the additional conditions listed below. 1). When dredging the basin, turbidity must be controlled so that at turbidity. does not exceed 50 NTUs outside the project area. The use of turbidity curtains may be required,if the turbidity exceeds this threshold. Please contact this Office at the number listed below if there are any problems with turbidity; 2). The attached Certificate of Completion (COC) must be submitted to the Division upon final construction of the site. Ex127 Cardinal Drive t., Wilmington, NC 28405-3845 Telephone (910) 395-3900 FAX (910) 350-2004 An Equal Opportunity Affirmative Action Employer i sali3 lujluaO XaljuOoW laugoryli - "oui `sjoloujluoO auusW ay 8uiniQ ailuslIV uanng 2noQ - g2ialn2I ` WVD gOOjg pa- uolSuiuxlm vwvo 'Clojux Ipu,(O - QOWO F-MOO `Bull P UROM/I017 sinquaals auuso f -OVAA, j0310iM fUuag - aaiWO Plai3 uol2uitulitlA sjaauisug jo sdioO :aa uoilalduioO jo alsogt:iaO IL££ # 30:sluauigaullV )Clilsna jalsM p uoisiniQ `ioloaiiQ 3'd `?IauIiI?I A U9Id `,(I=ouis 006£-S6£-OI6 is janigs 3loig jo sinquaals auuso f auogdalal assail `suoilsanb Xus ansq nog A '9b80Z0 # liuuad OAVI QTJO nnaina.i aql sololduioo nUal sig1, "Vuiauaq s joj 31su nox ssalun 8uipuiq pus leug ajs suoilipuoa sli pus uoiluagpioo sigl '17IL9-669LZ -3-M `g2ials2t `jaluaO aoinjas HEW tIL9. `s2uusag anilsjistuiuipd3o aoijO alp of salnisis [sjauar,? sugojsO glioil agljo gOSI-jaldsgO oj2uiuuo uoo uoggad uaWivi u pugs `2ulmq s joj iisu qL '.mual sigl aniaoal no,C isgDalEp agl jo s,CsP 09 uiglFA loulsnw nod ?uusaq ?Cjoluoipn fps us l03 ?Is? ?EUl no,C `uoiluagi as - sigl Jo suoilipuoo aql jo Xuu;daoos lou op noX jl •sQOgipuoa pagaene aq; peal assail ",Cigsnb .iajwA loajju Xvtu lugl loofoid aql jo uoilon.gsuoo aql Suunp sasus uialgoid Xusji aSsd snoinajd aql uo .iolooj aql ui palsq ioqumu aql is aogjO sigl XJilou assail ZOOZ `9Z aunt llspuA.L luam 'jw XuudtuoO ig2!,l pus jaenod suilono oh1,L a8gd MEMORANDUM TO John Dorney Regional Contact: J. Steenhuis Non-Discharge Branch WO Supervisor: R Shiver Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Carolina Power & Light Company Project Number 02 0846 Recvd From APP Received Date 5/29/02 Recvd By Region Project Type dredging` County New Hanover County2 Region Wilmington Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. CAMA ?- O Y OO N F 1 S-(63) F 7- Sw 30,617. 69.30 F_ Mitigation Wetland MitigationType Type Acres Feet F_ I F_ Is Wetland Rating Sheet Attached? O Y ON Did you request more info? O Y ON Have Project Changes/Conditlons Been Discussed With Applicant? O Y O N Is Mitigation required? O Y O N Recommendation: O Issue 0 Issue/Cond O Deny Provided by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: This office has no objection to the eject as proposed. The applicant will nee to monitor turbidity as a result of dredging and will need to use turbidity curtains if needed. cc: Regional Office Central Office Page Number 1 Re: WiRO Tracking and Tardy Notice, 6/26102 Subject: Re: WiRO Tracking and Tardy Notice, 6/26/02 Date: Wed, 26 Jun 2002 17:36:33 -0400 From: Joanne Steenhuis <Joanne.Steenhuis@ncmail.net> To: Cyndi Karoly <cyndi.karoly@ncmail.net> CP&L 02-0846 permit going out tommorrow (6/27/02) Oak Pointe - 02-0775 placed on hold--- talked to consultant, they were having to resubmit info for COE and did not notify us (6/26/02) Village of Bald Head - 02-0809 no 401 is needed Todd Woodard - 02-0731 permit written (5/20/02) Jeffery Simmons - 02-0729 waiting for a shellfish closure call... Cyndi Karoly wrote: > Hi Joanne and Noelle. > > Below is this week's 401 Tracking Notice for the Wilmington Regional > Office. The Central Office has not received your recommendations for > these projects as of June 26, 2002. If you have not received any > application, please let me know and I will fax it to you. Please take > note of the date received in the Central Office and the 60-day clock > projection. If we do not have your comments by two weeks before the > clock expires, we may have to prepare the 401 without incorporating your > comments, in order to avoid waiving the 401. Two weeks from today, the > application will be forwarded to the appropriate Central Office staff > member (Danny Smith) if we do not have Regional office comments by > then. The CO staff will then consult you if time allows and make a > recommendation on the 401 to John Dorney. > TRACKING: > 401 Applications: > DWQ No. Project County Permit Type Received Expires > 02-0846 Carolina Power and Light Company, New Hanover Co., > CAMA, 5129102 7/27/02 > 02-0775 Oak Pointe, c/o Miriam Speicher, Brunswick Co., NW > 18 5120102 7118102 > 02-0809 Village of Bald Head Island, Brunswick Co., CAMA > 5120102 7118102 > Please use the staff recommendation sheet in Filemaker Pro, and then > notify me that the report has been filed. My e-mail address is > Cyndi.Karoly@ncmail.net or you can call me at 919-733-9721. > There are two tardy projects for your region this week, listed on the > attachment. I've passed these files along to Danny Smith, so you'll be > hearing from him soon. > Thanks very much for your attention. > ------------------------------------------------------------------------ > Name. Tardy Projects.doc > Tardy Projects.doc Type: Winword File (application/msword) > Encoding: base64 > Download Status: Not downloaded with message Joanne Steenhuis <Joanne.Steenhuis@ncmail.net> 1 of 2 6/27/02 10:06 A A < X-A *A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary May 24, 2002 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Mr. John R. Dorney Division of Water Quality 2o8??i 0 e Doug Huggett Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review (320846 Carolina. Power & Light Company 801 Sutton Steam Plant Road, north side of Cape Fear River, New Hanover County Maintenance dredging of barge terminal basin; repair existing fender system; replace and install 10 new mooring dolphins; install a hopper/conveyor system Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 14, 2002. If you have any questions regarding the proposed project, please contact Ed Brooks at 910-395- 3900. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. SIGNED This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE 127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845 Phone: 910-395-3900\Fax: 910-350-2004 \ Internet: http://dcm2.enr.state.nc.us An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \10%a Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT • d 1. APPLICANT'S NAME: Carolina Power & Light Company • 2. LOCATION OF PROJECT SITE: 801 Sutton Steam Plant Rd.,.off US Hwy. 421, north side of the Cape Fear River, New Hanover. County. • Photo Index - 2000: 15-156: S-18-20 1984: 13-150: T,U-9-13 State Plane Coordinates - X: 2304873 Y: 196167 Rover file: 0-051713A 3. INVESTIGATION TYPE: CAMA & D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 05/17/02 Was Applicant Present - Yes 5. PROCESSINQ PROCEDURE: Application Received - 5/17/02 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Wilmington/New Hanover Co. Land Classification From LUP - Conservation (B) AEC(s) Involved: EW,PT (C) Water Dependent: Yes (D) Intended Use: Commercial (E) Wastewater. Treatment- Existing - Private Sewer system, ash ponds (NPDES-N00001422) Planned - N/A (F) Type of Structures: Existing -Power generating steam plant, cooling lakes, diked ash pond retention areas, petroleum storage tank, and barge basin. Planned - N/A (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] nRF.n(TRn PH 7 Flt r)TUPP (A) Vegetated Wetlands (B) Non-Vegetated Wetlands- Open water _ 60 000 s ft. (C) Other- Spoil disposal area 68 acres (D) Total Area Disturbed: 69.3 acres (E) Primary Nursery Area: Yes (F) Water Classification: C-Sw Open: No resource 8. PROJECT SUNIlVIARY: The applicants propose to perform maintenance dredging of their existing Carolina Power & Company Page 3 barge terminal basin to its previously permitted depth, repair ti6 existing fender system, replace existing and install 10 new mooring dolphins, and install a hopper/conveyor system to unload Foal • from the barges and transport it to the coal storage area. 9. 10. The project site is located at 801 Sutton Steam Plant Rd., off US Hwy. 421, on the north side of the Cape Fear River, in New Hanover County. The 3,300 acre tract is the site of the Sutton Power Plant, a coal fired, steam turbine generator facility which provides electricity to Wilmington and the surrounding counties. The tract has over three (3) miles of shoreline on the Cape Fear River. The facility includes the steam plant and associated offices, buildings and electrical sub-stations; a closed system of thermal wastewater cooling lakes, two diked ash pond retention areas (150 acres), a diked petroleum storage tank area, a diked coal storage area, and a boat/barge basin and wharf. The barge facility was constructed in 1971 and consists of an existing basin (350' X 190') and an adjacent concrete dock (350 feet long and 50 feet wide). There is a system of old pumps and pipes on the dock, once used to unload fuel oil, that will be dismantled and removed. The dock is fronted by a steel bulkhead, which is fitted with a timber fender system. The remainder of the basin shoreline is stabilized by rip rap (stone). In the project area, the waters of the Cape Fear River are classified as C-Sw, by the NC Division of Water Quality. These waters are designated as Primary Nursery Area (PNA), by the NC Division of Marine Fisheries. The Cape Fear River is approximately 600 feet wide in this location, and is classified as Joint waters by the NC Division of Marine Fisheries and the NC Wildlife Commission. The applicants propose to perform maintenance dredging of the existing basin. The project dimensions are 400 feet long and 150 feet wide, to its previously permitted depth of -14 feet at mean low water QvMW). The work would be -completed by hydraulic pipeline dredge. Given the existing water depths, the project would produce approximately 22,000 cubic yards of spoil material. This material would be pumped to an existing 68 acre, diked ash disposal area, which is not currently in use and is located approximately 2,000 feet west of the project site. The applicants propose _to replace. the three (3) existing and add two (2) mooring dolphins on the south side of the basin. Eight (8) additional mooring dolphins are proposed along the north downstream bank of the river (30' to 40' offshore) to create a barge staging area. Each dolphin would consist of _a seen -(7)pile .cluster- The existing timber fender system would be repaired as necessary. On the dock -and _llighground area, a crane and hopper/conveyor system is proposed to unload the coal from the barges and transport it to the coal storage area. ANTICIPATED IMPACTS The proposed project would disturb 60,000 square feet of previously dredged bottom. Given its large area (68 acres), it is unlikely that the deposition of excavated material within the existing diked ash disposal area would reach the discharge elevation of the water control structure. However, should a discharge occur, the water-control structure is piped to the cooling lake and would not effect surface waters. The project would facilitate continued operation of the Carolina Power & Light Company's Sutton Power-Plant. Submitted by: E.F. Brooks Date: 5/22102 Office: Wilmington RI VERMAN, LLC 3330 River Road, Wilmington, NC 28412 April 17, 2002 North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 Attention: Mr. Ed Brooks Subject: CAMA Permit Application L. V. Sutton Power Plant Dear Mr. Brooks: ti Riverman, LLC, acting as agent for Carolina. Power and Light Company, respectfully submits the subject permit application. This application is for maintenance and improvements to the existimg barge unloading facility at the Carolina Power and Light Company, L. V. Sutton Power Plant, located on the Cape Fear River, New Hanover County, NC. Specifically, this permit covers the work of maintenance dredging of the existing barge slip, repair of the existing fender system, repair or replaces of existing :dolphins, and the addition of tm (10) new mooring dolphins. The scope of work does not impact wetland areas. Dredge spoils shall be deposited in an existing .ash sedinm t pond complete with existing dikes and outlet structure. Please do not hesitate to comtad the undersigned with any questions or concerns. Regards, Walker Member, Riverman, LLC ECEIVE APR 17 2002. D DIVISION OF COASTAL MANAGEMENT encl. CAMA Permit Application (910) 791-2411 • FAX (910) 791-4054 (To be a mpleted by all anXcants) ' • b_ City, town, community or landmark 1. APPLICANT WM. • c. Street address or secondary road member 801 ohm Sbmn mat Ra. a. Landowner: Name C MDlira Fazr & .Lim. Choy Address 801 butane SbEffn Plant RI City WUningbm State NZ Zip 28401-8357 Day phone (910) 343-9677 Fax (910) 343-3296 b. Authorized Agent: Name lbvenn n IW Address 3330 % Ida. City. WLbdrr*M- State N Zip 28412 . Day phone (910) 791-2411 d. Is proposed work within city limits of planning jurisdiction? Yes xx No e. Name of body of water nearest project (e.g. river, creep, sound, bay) Cie Fear Mvw 3. DESCREMON AND PLANNED USE OF PROPOSED PROJECT a. 149 -all development activities you proper (e-8• buildings home, motel, marina, buftead, pier, and excavation and/or Ming .activities- Fepaix-east ' f8rClEr sysban. Mmtall shin Uld? & =AeYW- Mall tEn ?(l0) n W7G c 2#tn. MArimmm dredr- -e stirn-lam SLID. b. Is the proposed ;activity maintenance of an existing project, new work, or both7 bDffi Fax (910) 791-4054 c. -project name -(jf any) BarW UnIcaaizr-j Far-iUty ME, IV Sttt m Plant c. WM *epmject be forpublic, private or commercial ase? caul d. Gb i brief description of purpose, me,nedWs of oonsvncdon trod daily operations =of ;,proposed If more -apace is ::needed -l? atmeh -addhbaal:p? ? Y3 fa Y fEr SLtbm Rmw Gmazt im F ility- VM Permit vW he isnwrd in amw oflwdvwwer(s), wd/or 2. LOCATION fly' PROPOSED PROJECT -a. County MW F1$lyxr >s?a t??ss Form DCM MP 1 APR 17 2002 DIVISION OF COASTAL :,MANAGEMENT m_ Describe v*ting wastewater treatment facilities,, 4. LAND AND WATER ,errmtWd MM Asb P - CHARACTERISTICS amt-y Wabw / 1umate Smr a. Size of entire tract 3300 +/- act es b. Size of individual lot(s) N/A c. Approximate elevation of tract above MAW or NWL +11 ns d. Soil type(s) and texun-e(s) of tract san3y a: Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary der, inch - rial/commesdal efliuem, "wash down' and residential d"hscharges.) rrne (Prr yi?t has m irrr=xr-I-_ ) o. Describe ex sting drinking water supply source. NEW IJE2= QXV ty e. Vegetation on tract N/A f. Man-made features now on tract 10Er G3iaztirg Plant g. What is the CAMA Land Use Plan land Classification of the site? (corer dw 10ttmd .WPiOLj . Conservation Transitional 3m Developed Commupity Rural Other h, How is the tract zoned by local government? 12 Iieaw 7r>1sbja1 L Is the proper proles consistent with theapplicable zoning? x `Yes 'No t6-A zmvq?=Nrh- -4-. _}'1 j. liar a professional ardsaoologicai amennas -bean done for'thetrac t? - Yes xK No Myer, bywhom? IL 1s the project located in :a National :Registered Ristoric ;District or does it involve a Nam Register listed or dkible property? Yes xy- No 1. Are there wetlands on the ire? xx Yes No Goastal (marsh) xx Otba xx if yes, liss:a delineation been conducted? rb on.* . 1 1 ('This project has m infect m Marrs.) S. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other" fmdermbkh-the applicant c1ems We to the :aff ected properties. If -1110 :applicant .is not daimiag to be the owner of said property, then forward a copy of the deedor -other inshument under which the owner claims title, :phis written permission fromm the owner to carry out the project. * An.acmirate, dated -work fat (including plan view andcross-a0ctio?t drawings) dream to ;scale is black ink on an 8 1J7 by 11' -white .pages. j tefer to Coastal Itesaorees Cmmission We 'HMO 15or a detailed dma) _ please :note hat original drawiep.are;prderred and oilyhaigb g aiity copies w1l1e.accepted. Mue4ine prints or other laager_plats ;are ale only if an copies are vroWded by applic mt. {Caataex the. 'US. Am" Corps of F.aginars .regarding hat agency's -use of urger drmwingL) _A she or location map is a dart -of plot rem -and it waist be sufficiently detailed to guide agency personnel unhudl with the area to the herbed VMS site, Indnde highway or secondary road (SR) numbers, landmarks, and the lat. * A Stocmwata Catifi=d0n, if one is n=ary. • A list of the comes and eomplete addresses of the adjacent wata€ront (riparian) tandownea and signed return receipts as proof that such owners have rewired -a copy of the apQSntion and plats by ceri fled maiL Such landowners m= be advised that they have 30, days in which to submit wmm on the proposed projec: to the Division o-f Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Address 2502 Nyirmr me. Phone L1s71,----, SX 75 C/O Saatt Cock, _q.ute 220 Name st!Tysi1 r--,r, -rrr- Address P.O. 133x 3327 Phone Pir,&?, TL 28374 Name Address Phone • -A Zst olp vvious state or federal permits issued for work on the. project trams. Include permit numbers, pem ttee,:and issuing dates. Air ¢slity 01318P14 NMM -NL. M422 ? A check-for _SM madepayable to the Dement of Environnnent, Health, -std Nateeral Jtmonr= (DEIiNR) ID amw she costs -of procezing the aPPVCafiM A AM banrd :notice fir projects in ° t,nd inlet 2maL *A atat ment v :cccg once with the N.C. FmiroamentsI poTcy Ad O C.G.S.113A -1 to 10) If-the projed involves the ezpendzmre ofp wk funds or use of public `lands, -atracb a statement dwmm -compliance with the North Carolina Polity Act r 6. CERTIFICATION AND PERM MOM TO LN7M ON LAND I =de= tbat any permit issued in response m this application wil allow only the development desanbed in the WE== 71ke project well be subject to conditions and re=c6ow =21'ned ;n the pamit. I =di; ft to the best of my bowledge, the proposed acdM comprzs with the State of North Cudines approved Coastal Management Program and will be =nduc.:d in a moaner consistent with such Program. I =dfy tba I am authorized to grzat, and do in fad S='= pc-.-.:n to representatives of stare and federal rrriew agg-..,cses to ester on the afar lands in caazeatCn aich evaluating infornatim rdated to this pert acplic2don and fellow-W monitoring of the pmje». 1 Ainher cwdy that the information provided in this appli=:Cn is tradM to the best of my Imowledge. 0 of f4 ?L. This "is the day Print Name VI AI At K G Signateae -= ' er.?irdiorirad ddewr piem,ind= meats .pe:tainiag to yonr.pmposed Irc3e me DCM MP Z T=avatkm tad Fsil3 me DCM le-3 Uphwd Dadopand aac DCI?i:3idp? ?StxuenaYsleefo? DCb[ W-5 Bodges and Zdvzu _ DCM7dPb ?1ldariaaDevdo? NOTE Beau.si c aid dae each :mradaaat In the -*meprae3drd attire boam of adfam >Revbea toss Form L)CM-MP 2 AVATION . d =V DIVISION OF r EXC COASTAL MAN AUEMENT itNDFILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Avenge Find Access channel (MLV) - (NWL.) Canal Boat basin Boat ramp a Rock ,groin Rock breakwater Other (Excluding "twin Mabaizat'an) * Ltairrb XMM dt#.irg tD mgh& 3:9E& dEpth • • 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards 22rOOO LY b. Type of material to be excavated 19-4/silt c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? Yes xx No d. Highground excavation in cubic yards mne 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area e's,_stirrg POX' tb d ash pond b. Dimensions of disposal area 68 .acrE, .c. 'Do you -claim -title -to disposal area? X Yes No If no, attach a letter granting permission from the owner_ d. Will a disposal area be available for` future maintenance? Xr- Yes No tf yes, where? we ash ?? Rev`:3ed 03195 Form DCM MP 2 APR 17 2002 DU DIVISION OF e. Does the disposal am include any coastal wedands If yes, COASTAL MANAGEMENT (marsh), SAVs or other wetlands? (1) Amount of material to be placed in the Yes xx No water 'N/A (2) Dimensions of fill area N/A f. Does the disposal include any area in the water? Yes xx No (3) Purpose of fill N/A • 3. SHORELINE STABILUATION a. Type of shoreline stabilization N/A Bulkhead 41A Riprap b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wedands? Yes mc No If yes, (1) Dimensions of fill area N/A (2) Purpose of fill N/A b. Length N/A c. Average distance waterward of MHW or NWL N/A S. GENTRAiL d. Maximum distance waterward of MHW or NWL N/A a. How will excavated or fill material be kept on site e. Shoreline erosion during preceding 12 months and erosion controlled? Pct fir ;xc:b p d N/A (Boone of inforn+ d-) C Type of bulkhead or riprap material: b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic g. Amount of fill in cubic yards p be placed below dredge)? water level Hytailin dacUW mj/i r marital Arnim (1) RiPrap NIA ie- d= lira (2) Bulkhead:bacltfill N/A c. Will wetlands be cr:issed in Unsporting equipment h. Type of fill material N/A to project site? Yes xx No If ,yes, explain steps that will be sakes to lessen impacts- i. Source of fill:material N/A 4. OTHER .FILL ACTIVITIES (F.xcluding-Sher efine SWbilia6m) a. Will fill material be brought to site? Yes Mc No I3agge U2cedi m FaciRtV CPR, >IL7 Suth ! Plant spot= O-f' -/7 -oZ Dde? - . Revbed WM Form DCM-1 W 4 STRUCTURES (Construction within Public Trust Areas) APR 1 7 2002 DIVISION OF COAST AL MANAGEMENT • Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) N/A Commercial N/?CommunityNlA Private (2) Number N/A (3) Length N/A (4) Width N/A (5) Finger Piers Yes xx No (i) Number N/A (hi) Length N/A (iii) Width N/A (6) Platform(s) Yes xx No (i) Number N/A (ii) Length N/A (iii) Width N/a (7) Number of slips proposed N/A (8) riparian Proximity of structure to adjacent property lines N/a. (9) Width of water body N/A (10) Water depth at waterward end of pier at MLW or.NWL N/A e. M baoys ) CommercialN/ACommunityN/A Private (2) Number N/A (3) Description of buoy (C I or, inscription, size, anchor, etc.) (4) Width of water body N/A (5) Distance buoy(s) to be placed beyond shoreline N/A L Mooring structure (boatlift, mooring pilings, etc.) (1) vy Commercial _rommunity. _, Private r_ (2) Number 10 (3) Length (4) Width 7 pU a cb3#m g. Other (Give --Pu a miming firm - see dradrps b. Boathouse (including covered lifts) (1) N/A Commercial NA Private (2) Leng(h N/A (3) Width N/A c. Groin (eg. wood, sheetpile, etc.) (1) Number N/A (2) Length(s) N/A d. Breakwater (e.g. wood, -sheetpile, etc.) (1) Length NIA (2) Average distance *= MMHW, NWL or wetlands N/A (3) Maximum distance beyond MHW, NWL or wetlands N/A loge ualreding Faci_hty, m, IV Stlxn Plant KF-my G. w^kgA W th+gle % nave o&f -17- vz- Date Revised 03195 Form DCM-MP-z APR 1 7 2W2 e. Does the disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes xx No f. Does the disposal include any area in the water? Yes xx No DIVISION OF If Yes, COASTAL MANAGEMENT -. (t) ant of material to be placed in''-the water -N/A (2) Dimensions of fill area, N/A (3) Purpose off M N/A 3. SHORELINE STARE .17ATION a. Type of shoreline stabilization N/A Bulkhead N/a Riprap b. Length NIA c. Average distance vr&award of MHW or NWL N/A d. Maximeun distance waterward of MHW or NWL N/A e. Shoreline erosion during preceding 12 months N/A (5arrcc -of ir?onnatian) f. Type of.builchead-or r prap material A g. Amount of fill is.cubic ,yards to be placed below water level (1) Riprap -KJn (2) 'Bulkhead badcfdl N/A h. TMx of fill _ataterial N/A i. :Source of fill matcxial :N/A 4. OTHER: M.L.ACTIVITIES Mxcluding:ShweUm S on) a. Will fill-material be'brought tDsite? Yes _Z&_ No b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? Yes xx No If Yes, (1) Dimensions of 511 area N/A (2) Purpose of fill N/A 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? gwi Gt-;m a}, rryrl b: What :type of construction equipment will be used (for example, dragline, backime, or hydraulic dredge)? Hydrailin dMCJ;iMMrx-?ri?nitsal ?rrx i? ie lirp_ c. Will wetlands be crmsed in transporting equipment to project site? Yes sac No N yes, explain °steps that will be taken to lessen envirm nnental -impacts. BMM Uflaru a Facility. CP&L iw a=m PIM* Oaf -i7 Dde ReAsed W M (Construction within Public Thrust Areas) Attach this form to Joint Application for LAMA Major Permit, Form DCM-MP-1. Be WC to comphte all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) N/A Commercial N/FCommunityNlA Private (2) Number N/A (3) Length N/A (4) Width N/A (5) Finger Piers Yes _d_ No (i) Number N/A (ii) Length N/A ('iii) Width N/A (6) Platform(s) Yes _xx No (i) Number N/A (ii) Length N/A (iii) Width N/A (7) Number of slips proposed N/A (8) Proximity of structure to adjacent riparian property lines N/A (9) Width of water body N/A (10) Water depth at waterward and of pier at MLW or NWL N/A b. Boathouse (including-covered lift) (1) N/A ;Commercial N/A Private (2) LenIp N/A (3) Width N/A c. Groin (e g. wood, sbetpile, etc.) (1) Number N/A (Z) ms(s) N/A d. Breakwater _(e.g. wood, sheeipile, etc.) (1) Ixngth VA ' (2) Average dista= from MW, NWL or - wedands NIA (3) Maximum distance beyond MHWf, NWL or wetlands N/A buoys e. Moormg,_ (1) N/ Commercial - mmunity N Private (2) Number N/A (3) Description of buoy (Color, inscription, size, anchor, etc.) (4) Width of water body N/A (5) Distance buoy(s) to be placed beyond shoreline N/A f- Mooring structure (boaflift, mooring pilings, etc.) (1) am_ Commercial _rommunity Private (2) Number 10 (3) Lmg& 40' (4) Width 7 pLle d*iun r ? • g. Other (Give mmpkie A=c*dm) t I d=hirs - see Farm iltclne-HM Facility., CP&L IW Sut bon Pl-r t KEviN a. w^kER W rage 11 O& - /7- OZ Date Revised 03195 Fa m DCM-W3 UPLAND DIVISION OF COASTAL MANAGEMENT DEVELOPMENT (COnstrixtion and/oc mad &tu*!* activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, faca'lities, mks or structures Proposed bn?99 unlcedEs and eaters s2stEm b. Number of lots or parcels N/A c. Density (give the number of residential units and the units per acre) N/A d. Size -of area to be graded,--.filled :or disturbed including roads, ditchers, etc. N.A e. If the Proposed Project will deb more than one acre of land, the Division of Land Resources must receive an-erasion ands control place at least 30 days before land.divnibing activity begins. If applicaNe, .:Las 2 sedimentation and erosion control plan been submitted to ibe Division of Land Resources? -yes ? ' ? Ifyes, due submitted f. List the materials (sad as marl, paver stone, aspltt, or °.contzete) Is be used for paved surfaces. - g. Give the percentage of the tract within 75 feet of MW or.NWL, or wid&575 feet in &e case of an Outstanding Resource Water, to be covered by impervious and/or built- pon :surfaces, _sucb as pavement, buildings, mo$ops, or to be used for vehicular driveways orparh g. U tbm 25% h. Pmjects that require a CAMA Major Development Pit may also require a Saormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? Yes Xx No If yes, date submitted rb?: 7knZ c03e=t d=e_sjBE7URjF ana ??vious i. Des.=:'oe proposed me3hod of selvage disposal. j. Have the facilities described in hem. L above received state or local approval? vim; N?a a?r.?e doe?a,osamdae) h Des.--ine location and type ofproposed disdwges to wags -of the stare (for example, surface :runoff, sanitzy wastewater, indvsarWcommercW effluent, -w down- and residential discharges). N/A 1. Describe proposed drinking water supply source (e , :community, public system, -etc) anty wta m. Will water be impounded? If M bow many ? - n. If the :proje t hs a ocewdh= development, when was the IcKs) platted and :recorded? x& Barge L eg IW SLtbm Plat KEVIN G. W ' - - --- 04-/7 ?oZ D.1e Yes X No Revised 03M APR 1 7 2002 JD DIVISION OF COASTAL MANAGEMENT INDEX of DRAWINGS A LOCATION MAP B RECORD DRAWING OIL HANDLING FACILITIES This drawing shows the barge facility as constructied in 1971. Proposed maintenance dredging shall restore the basin to the as-built elevations. C PROPOSED SITE PLAN - This drawing indicates the proposed facility repairs and improvements to service barge unloading requirements. D PROPOSED SITE PLAN - PROFILE - This drawing indicates a profile view of the proposed facility repairs and improvements. E TYPICAL DOLPHIN DETAIL F PROPOSED DISPOSAL AREA & MAINTENANCE DREDGING LOCATION Drawing indicates proposed utilization of existing ash pond, complete with dikes and water control structure for disposal of dredged material. Effluent is self-contained within Sutton Lake. G WATER CONTROL STRUCTURE - Existing water control structure details for ash pond. Drawing NORTHER C- , d .? G CAM MWe t, . 2229- Z259 t sib.- .?. 4.er / 1 `C(. f A 1336 / .?,3 rm' (rJ al _- ---- _ --W_ In f„b4 ??I ? ` nur+us?ow % . ? ? 4arr.r ..e ?C / ,tasL 1394 - - / • ? 33 }\- 1 1395 l t ? ? f / " v If?iGS GIA„If - - - - - N P?a6- POP. z" _ Oa 1 I ? ? Nwr Ifsewr / 1 CSx \ w1vor •t21 iLa.?\ -'\ ?.1'?? I.I I) rOl. all! / \ v?1 NGTON\ LI 1 A? ?? - ? ,7 va T_3ns a w-. ---- oa 7. "kh"A. 74 / t % 76 1 X21 ` I "mm IAK ? 1pl.M ' \` "" a Mani. ?- •. i .8 76 ?tEr 1 ' .., xwar 4f pt- I- rt = o O l ? i e ECEN APR 17 2002 DIVISION OF COASTAL MANAGEMENT CP&L L.V. SUTTON PLANT BARGESUP 4' MAINTENANCE DREDGING & IMPROVEMENTS 1 1 {-?c yo LOCATION PLAN T = 2mlles 4/912002 • ?. Y Drawing B ! In 1 it v -v fl ;7 p ? J S l 1, F ? =" LL ' 0 00 ?? ?i Cab I'. ?• .10 e ! u. o ?` v F 0 1 1 1 i 1 t t t 1 i t .: i s , a.. e / . r >Is t i i j iTI' i•T I cTTf T P'ri C _ ? - ---_• ? - I N or wra+..aa.. I 11 ! I i j! 1 i ? 1 i f! 1 j - t - •j ???' 1 .'?? O Z kh6 I J, i i r I' i •I . E o ?!' n a it / iii is li: a f ??? a (a) I ! ;. 70 i 00 iI WSJ Z M 141 Z? • 0 • i ECEHV8 D APR 17 2002. CP&L LV. SUTTON PLANT BARGE SLIP DIVISION OF MAINTENANCE DREDGING & IMPROVEMENTS COASTAL MANAGEMEN AS-BUILT mmism v-iio- 41912002 ..•mC9 Ld z ?.- --- - LL- o? :D FW- W R m cn LLJ C >- c o Q 'i! J lCL . J ?l L I D • '? Izz L) .? w F= S FO- ( z ?. < .X J o IWo I 00 Iwo' ° - : c) W I a z Li ,HOPPER j a z RECONSTRUCT W? DECK & REMOVE I m ?,,w EXIST. PIPING I. :a > i Drawing . W 1 Lu Z ? a A-f co o 04 0 C14 Z N ?n' N y J AN ° 00 1 i c E E C jvE 1 1 a APR 1? X02 i 3$ • 1 t =N T`ROUAPACEO BELT t. '1 w s2FT CATW 6? 7P 5 FPI? 1 FT TRUSS Lk ON .t 1 TOWER, TY? 1 1 C - .t . 1 CP&L L.V. SUTTON PLANT-BARGE SLIP MAINTENANCE DREDGING & IMPROVEMENTS \ PROPOSED MAINTENANCE & IMPROVEMENTS PLAN VIEW 1"=100• 41912002 1 • • 17 DivisioN of COASTAL MANAGEMENT Drawing D ELEVATIONS LOCAL PLANT DATU ; MEAN LOW WATER MEAN HIGHE WATER TOP OF DOCK COAL YARD WORKING POINT BELT DISCHARGE +126.5 BUCKET RANGE A LIGHT BARGE ® MHW LADEN BARGE ` ® 'MLW Q VE I APR 17 2002 OF D COAS AFL+MAONAG EMENT 7248 E-CRANE • 0 10 DEG 500 Fpm 48" BE?-1 CONCRETE b FOUNDATION CP&L L.V. SUTTON PLANT BARGE SLIP MAINTENANCE DREDGING & IMPROVEMENTS PROPOSED MAINTENANCE & IMPROVEMENTS PROFILE 1' =100' 4!9/2002 HOT DIPPED GALV. THRU BOLT W/ NUT 8 2 OGEE WJPHERS d PLAN V I EW EL ISM MLW EL 16' MLW EL 14' MLW EL 2.5'MLw 141 EL O 00' Il SSA EZVE APR 17 2002 -OOA_S AiLtMAO AGEMENT WRAP WITH SEVEN TURNS OF 3/4* ,0 WIRE ROPE (TYP) -TREATED TIMBER PILE (TYP) 3/8' STAPLES (TYP) MLW 1 Io PILE TIP ELEV. APPROX -2L.O M LW 7- PILE CLUSTER ?.I Drawing F IF ? ?? ?2 _. ".?? •Y?il. ...5 - sue: PROPOSED DISPOSAL SITE EXISTING DIKED ASH POND A r ? ?-folo,001 68 ACRES.,, =-dfGtN`iAFFI'f'` ?K r. ? -W 1 .a - 1r r oar, IL PROPOSED MAINTENANCE DREDGING ??i % rq ?b8*s8? OF EXISTING BARGE SLIP ! b EXISTING WATER CONTROL STRUCTURE _ ??•, f EFFLUENT IS SELF-CONTAINED WITHIN SUTTON LAKE/ ro , APR E 2 I ISION OF rt= ?nFT I? CP&L LV. SUTTON PLANT BARGE SLIP ! MAINTENANCE DREDGING & IMPROVEMENTS ?- DISPOSAL AREA 17=1,000' 41912002 . 11 - Drawing G . tir ; , N f t? +I ;} 1 • ?a za•,q.e,-e.s 1 ?t 0-a ? ? ?? ` DIV!SEON OF f,Y,, COA5TA MANAGEMENT/r`-,,- 3-G?- •(•C??3-oG Seo/e f "a 4'-0 I yi J: •?GZS+gD ? ? 1 HE001?1 .. F_t_EvATION I I (w?7r? 261wf oeral:-s) I ] e7e?:E . ? G ? ! -t..e Fu-TL c^S¢IG SEE warp-d ? -- 3 °-__- -i ;.•O- - owd p-3237 (L.i7) Sc =Tic.1 p_?253-14 J'= 0-•f wE,N S'4". ffA 5O.& OC--^46 fl_3,230-Z n? of N' C- - sus---- ; •pi el?sernc., __-. e r tlj ' Z ! _ -?? c 0-7.• 10.17 Ma A.4 { 1 I 5C -WJO:- SEE ? CES?I{L.G3zs? i ? i lt,,o? I.?sw cowlG. Z2 hY e SELTIOI.! D-3253-2 Ex:STN4 DI?'?--? SRULTUCC MOOIGIGATIQ' I. ?Ewlov? cxlsr?w.71?.rsc¢ FISE[ PRAOC To Il lsrrwwc? .cv.icLGTE L•sex see O;IC er@lW4761 G•3177 t- FbNV TO sB Cr. JWQP FDF MOOIFlCATorJ To mussnw4 ptSc. 4TgU YULE PerW L 0-3253-3 P..nIJ WITH L6wP.ale(,p.1(? PC71•.ILS ') CPBL L.V. SUTTON PLANT BARGE SLIP MAINTENANCE DREDGING -& IMPROVEMENTS WATER CONTROL STRUCTURE SCALE AS NOTED 4/9/2002 __4. 3.F. (rT) ?: Jr IRA MAY 17 2002 DIVISION OF COASTAL MANAGEMENT N (n n- N FOo W U N a a W 0 0 a w r 1r?> L " _ -12 vr.l 1°-= 751 BOTTOM - ELEVATIONS r azf ° Liivai ?• • Arm J as •al? °pw'?o?? $? aR<aLf 4. au a'U au atto AMD au a ? 0 °L au 81 .3 B' au am ? +no au O b..0 V•N,Jr OP DOLPHINS 77.7 :•?. no na s ?C ( U? O U .??gr4v??,.? ;..-ANC ?+?° °r•?.°; 'PIPE: BASIN 92.6 Ama io?eSTv 77,3 i BREAKWATER $ a 74 ~ .b~- 7" sy 732 r"'•?w+oo••w ".Q.,sa??N ) SY ? ' $ vo .o?.we.sw Zze zz y i m dv??'" o s ?yT? B q¢? ¢• CP&L LV SUTTON PLANT RIVERMAN, LLC n BARGE UNLOADING FACILITY SUTTON STEAM PLANT ROAD DATE:5/17/02 SHEETC, I OF G s A LETTER OF AUTHORIZATION ' This letter grants Riverman, LLC authority to act on behaff of CP&L in submission of the CAMA permit. B LETTER TO NCDENR RE:NPDES PERMIT This letter regarding the utilization of the existing ash pond provides specific details on the capacity, size, elevations, and permit number for the existing ash pond (the proposed disposal site). C PROPERTY DEED D NOTIFICATION OF ADJACENT PROPERTY OWNERS ? 0i EIVE? APR 17 2002 ; DIVISION OF COASTAL MANAGEMENT DWQ Project No.: 020846 County: New Hanover j 13 n R 5 i Applicant: Carolina Power & Light enmpany Project Name: Sutton Steam Plant Barge Slip Dredging Date of Issuance of 401 Water Quality Certification: 06/26/02 Certificate of Completion Upon completion of all work approved :within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that a construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Bu r Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certi tcation Partial Final as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby: state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans aid specifications, and other supporting materials. Signature Registration No. Date Mail to: 401 Wetlands Contact NC Dept. of Environment and Natural Resources 127 Cardnal Drive Ext. Wilmington, NC 23405-2004