HomeMy WebLinkAboutNCC201303_NOI Application_20200401Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 3/27/2020 1:10:42 PM (NCG01 NOI Submission)
Approve by Garcia, Lauren V 3/31/2020 11:08:23 AM (Review- Construction NOI 23739)
• The task was assigned to Garcia, Lauren V by round robin distribution 3/27/2020 1:11 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 31, 2020 5:00
PM 3/27/2020 1:11 PM
Submit by McCoy, Suzanne 4/1/2020 8:32:20 AM (Payment Verification for NCC201303)
* Bradley Patterson
• McCoy, Suzanne assigned the task to McCoy, Suzanne 4/1/2020 8:31 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: May 12, 2020 5:00 PM
3/31 /2020 11:08 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
la. Project Name * Robeson LNG Facility - Phase 2
1 b. Specific Lot This field may be used to list specifc lot numbers.
Numbers
2. County* Robeson
3. Highway or Street 680 Reverend Bill Road - S.R. 1316
Address* Street name only is acceptable if no address number assigned yet
4. City or Township* Smiths Township
5. State * NC
6. Zip Code* 28364
7. Latitude* Enter the latitude in decimal degrees
34.7979
8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative)
-79.2728
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
04/01/2020
Estimated Construction Project Start Date
10. Date to End *
09/02/2021
Estinated Construction Project End Date
11. SIC (Primary)*
Industrial (1541)
Standard Industrial Classification for Development
12. Acres to be
21.00
disturbed*
(including off -site borrow and waste areas)
13. Total site area 685.34
(acres)*
14. Post- 26.00
construction (Estirated)
impervious area
(acres) *
NCC Project NCC-ROBES-2020-Robeson LNG Facility - Phase 2
Tracking ID Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Gum Swamp
Waterbody* %neof waterbody into which storrrwater runoff will discharge
15b. Waterbody 14-5
Index No. * NCWaterbody Index Narrber
Stormwater r- No
discharges will flow 17 Yes
to additional
wate rs *
15c. Additional Jordan Swamp
Receiving Waterbody narre
Waterbody
15d. Waterbody 14-5-1
Index No. NCWaterbody Index Narrber
15e. Additional Waterbody name
Receiving
Waterbody
15f. Waterbody NCWaterbody Index Narrber
Index No.
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Piedmont Natural Gas Company, Inc.
Name * If perrrittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
2. First Name* Bradley
It Corporation, enter Fbgistered Agent First Barre
3. Last Name* Patterson
If Corporation, enter Faegistered Agent Last Wre
3b. Title Delegate
4. Permitee E-mail Bradley.Patterson@duke-energy.com
Address *
5. Permittee (704)731-4068
Telephone No.*
6. Permittee Mailing Street Address
Address* PO BOX33068
Address Line 2
City State / Ftovince / Faegion
Charlotte NC
Fbstal / Zip Code Country
28223 United States
Check box if the r Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
4720 Piedmont Row Drive
Address Line 2
City
State / Ffovince / Fbgion
Charlotte
NC
Fbstal / Zip Code
Country
28210
United States
8. Type of
Non -Government
Ownership*
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Daniel
Contact - First
Name *
2. Primary Site
Klimczyk
Contact - Last
Name *
3. Title
Senior Implementation Superintendent
4. Site Contact E-
Daniel.Klimczyk@duke-energy.com
mail Address*
5. Site Contact
(716)307-0735
Telephone No.
6. Organization
Piedmont Natural Gas Company, Inc.
Name
7. Site Contact
Street Address
Mailing Address*
680 Rev Bill Road
Address Line 2
city
Maxton
Fbstal / Zip Code
28364
8. Consultant Name
(Optional)
Caleb Peeler
First and Last nacre
9. Consultant E-mail
caleb.peeler@hdrinc.com
This person will be copied on all correspondence.
10. Consultant
(704)338-6771
Telephone No.
State / Rovince / Region
NC
Country
United States
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 03/19/2020
Approved *
2. E&SC Plan Project ROBES-2020-002
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Fayetteville (FRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan
Approval letter or
Grading Permit
Site Map (Optional)
robes002apRev.pdf
Mast be RDFfornat
Helpful for linear project review
Mast be FDFform3t
73.37KB
Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support
the application. Include additional w aterbodies for linear projects if necessary.
6. NOI Certification NOI Certification Form - Robeson LNG Facility -
Form 377.95KB
Phase 2 signed.pdf.pdf
Wst be FDFfornat
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6E (i) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name * Bradley Patterson
Title Director, LNG Projects / Delegate
Organization Piedmont Natural Gas Company, Inc.
Date * 03/27/2020
F. Tracking and COC Info
NOI Tracking No. 23739
NC Reference No. NCG01-2020-1303
Uses 'count number' variable (incremrented by SP)
Certificate of NCC201303
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 1303
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)