HomeMy WebLinkAboutNCC201297_NOI Application_20200401Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 3/30/2020 6:19:07 PM (NCG01 NOI Submission)
Approve by Clark, Paul 3/31/2020 8:36:14 AM (Review- Construction NOI 23790)
. The task was assigned to Clark, Paul by round robin distribution 3/30/2020 6:19 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 1, 2020 5:00 PM
3/30/2020 6:19 PM
Submit by McCoy, Suzanne 4/1/2020 8:27:00 AM (Payment Verification for NCC201297)
* Skyline Development Corp
• McCoy, Suzanne assigned the task to McCoy, Suzanne 4/1/2020 8:26 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: May 12, 2020 5:00 PM
3/31 /2020 8:36 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
la. Project Name * North Creek Meadow Subdivision (streets only)
1 b. Specific Lot This field rray be used to list specifc lot numbers.
Numbers 1-37
2. County* Johnston
3. Highway or Street Friendship Church Road
Address* Street name only is acceptable if no address number assigned yet
4. CityorTownship* Oneals
5. State * NC
6. Zip Code* 27597
7. Latitude* Enter the latitude in decimal degrees
35.7457
8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative)
-78.2445
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
03/30/2020
Estimated Construction Project Start Date
10. Date to End *
06/30/2020
Estimated Construction Project End Date
11. SIC (Primary)*
Residential, Single
Family Houses (SFE)
(1521)
Standard Industrial Classification for Development
12. Acres to be
4.87
disturbed*
(including off -site borrow and waste areas)
13. Total site area 31.41
(acres)*
14. Post- 4.70
construction (Estirrated)
impervious area
(acres) *
NCC Project NCC-JOHNS-2020-North Creek Meadow Subdivision (streets only)
Tracking ID Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Moccasin Creek
Waterbody* Name of waterbody into which storrrwater runoff will discharge
15b. Waterbody 27-86-2
Index No.* NCWaterbody Index Number
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization SKYLINE DEVELOPMENT CORP.
Name * If perrrittee is an individual (i.e., organization does not apply), enter first and last nave in this field.
2. First Name* ANDREW
IF Corporation, enter Pbegistered Agent First Barre
3. Last Name* PERRY
If Corporation, enter Faegistered Agent Last %rre
3b. Title PRESIDENT
4. Permitee E-mail YATEPERRYS@GMAIL.COM
Address *
5. Permittee 9195922790
Telephone No.*
6. Permittee Mailing Street Address
Address* 2564 Holiday Avenue
Address Line 2
city
Zebulon
Fostal / Zip Code
27597-9369
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
V Yes
Street Address
2564 Holiday Avenue
Address Line 2
City
Zebulon
Flostal / Zip Code
27597-9369
8. Type of Non -Government
Ownership*
State / Ftovince / Faegion
NC
Country
us
State / Ffovince / Fbgion
NC
Country
us
C. Site Contact Information
Part C.
^
Roject Site Contact Inforrration
.......................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site
ANDREW
Contact - First
Name *
2. Primary Site
PERRY
Contact - Last
Name *
3. Title
PRESIDENT
4. Site Contact E-
YATESPERRYS@GMAIL.COM
mail Address*
5. Site Contact
9195922790
Telephone No.*
6. Organization
SKYLINE DEVELOPMENT CORPORATION
Name
7. Site Contact
Street Address
Mailing Address*
2564 Holiday Avenue
Address Line 2
Oty
State / Rovince / Region
Zebulon
NC
Fbstal / Zip Code
Country
27597-9369
us
8. Consultant Name
(Optional)
ALSEY GILBERT
First and Last nacre
9. Consultant E-mail
ALSEYGILBERT@YMAIL.COM
This person will be copied on all correspondence.
10. Consultant
9195535104
Telephone No.
D. E&SC Plan
Part D.
^
Erosion & Sedirrent Control (E&SC) Ran Approval Inforrration
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan
03/18/2020
Approved *
2. E&SC Plan Project
NORTH CREEK MEADOWS SUBDIVISION
Number/ID*
(STREETS ONLY) JC # 19-133-P
Assigned by agency or local program
3. E&SC Plan
f State DEQ Office
Approved by*
r Local Program
4. Local Program*
Johnston County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan 19-133 North Creek Meadows ESC Appr 3.18.20
Approval letter or 404.08KB
(1).pdf
Grading Permit
Mist be FDFforrrat
Site Map (Optional) Helpful for linear project review
ncm.pdf 5.76MB
Mist be RDFforrrat
Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support
the application. Include additional waterbodies for linear projects if necessary.
6. NOI Certification NC001 REV. pdf 199.53KB
Form Mist be RFforrret
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name* ANDREW PERRY
Title president
Organization SKYLINE DEVELOPMENT CORPORATION
Date * 03/30/2020
F. Tracking and COC Info
NOI Tracking No. 23790
NC Reference No. NCG01-2020-1297
Uses 'count number' variable (incremrented by SP)
Certificate of NCC201297
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 1297
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)