HomeMy WebLinkAboutCorps Comments
Wanucha, Dave
From:Hunt, Rhodes <rhodes.hunt@kimley-horn.com>
Sent:Monday, March 30, 2020 12:34 PM
To:Braspennickx, Nicholle M CIV USARMY CESAW (US)
Cc:Teresa Gresham; Reed, Beth; Faugerstrom, Kaitlyn; Blanton, William A; Euliss, Amy;
Moore, Jeff; Richards, Mackenzie; Sullivan, William; Wanucha, Dave
Subject:Corps Comments
Attachments:U-5760 Revised Permit Pre-Application Meeting Minutes (2020-02-27).pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Hi Nicholle,
Good afternoon and thank you for your review and feedback! The minutes have been updated as requested and are
attached for your records.
Hope you are staying safe and healthy during this unusual time.
Rhodes
Rhodes S. Hunt, PE
Kimley-Horn | 421 Fayetteville Street, Suite 600, Raleigh, NC 27601
Direct: 919-653-6620 | Mobile: 919-723-7954 | www.kimley-horn.com \[kimley-horn.com\]
From: Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil>
Sent: Sunday, March 29, 2020 12:47 PM
To: Hunt, Rhodes <rhodes.hunt@kimley-horn.com>; Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Gresham, Teresa <Teresa.Gresham@kimley-horn.com>; Reed, Beth <Beth.Reed@kimley-horn.com>; Faugerstrom,
Kaitlyn <Kaitlyn.Faugerstrom@kimley-horn.com>; Blanton, William A <wablanton@ncdot.gov>; Euliss, Amy
<aeuliss@ncdot.gov>; Moore, Jeff <Jeff.Moore@kimley-horn.com>
Subject: RE: \[External\] Follow Up for Pre- Application Meeting: TIP# U-5760 Big Mill Farm Rd Widening/Extension,
Kernersville, Forsyth County, NC
Hello !
I realize I did not get my comments in by March 13, 2020.. However, the minutes and revised plan sheets are very good..
the only comment I had on the meeting minutes is – thank you for adding my middle initial to the email address..
however, there is a silent “x” at the end of my last name – so the Braspennickx in the roster – and in the email address
needs to be updated to include the “x” – or not.
Sincerely,
Nicholle B.
704-774-7551
1
From: Hunt, Rhodes \[mailto:rhodes.hunt@kimley-horn.com\]
Sent: Thursday, March 5, 2020 3:00 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Braspennickx, Nicholle M CIV USARMY CESAW (US)
<Nicholle.M.Braspennickx@usace.army.mil>
Cc: Richards, Mackenzie <Mackenzie.Richards@kimley-horn.com>; Gresham, Teresa <Teresa.Gresham@kimley-
horn.com>; Hartshorn, Jason <jason.hartshorn@kimley-horn.com>; Reed, Beth <Beth.Reed@kimley-horn.com>;
Sullivan, William <William.Sullivan@kimley-horn.com>; Faugerstrom, Kaitlyn <Kaitlyn.Faugerstrom@kimley-horn.com>;
Blanton, William A <wablanton@ncdot.gov>; James, Connie K <ckjames1@ncdot.gov>; Euliss, Amy
<aeuliss@ncdot.gov>; Patterson, Robert D <robert.patterson@ncdenr.gov>; Moore, Jeff <Jeff.Moore@kimley-
horn.com>
Subject: \[Non-DoD Source\] RE: \[External\] Follow Up for Pre- Application Meeting: TIP# U-5760 Big Mill Farm Rd
Widening/Extension, Kernersville, Forsyth County, NC
Hello Dave,
Good afternoon! Thank you for your review and comments, and I have attached an updated copy of the minutes. Our
responses are in green below and please let us know if you need anything else or have additional questions.
Thanks again,
Rhodes
Rhodes S. Hunt, PE
Kimley-Horn | 421 Fayetteville Street, Suite 600, Raleigh, NC 27601
Direct: 919-653-6620 | Mobile: 919-723-7954 | Blockedwww.kimley-horn.com
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Wednesday, March 4, 2020 2:30 PM
To: Hunt, Rhodes <rhodes.hunt@kimley-horn.com>; Nicholle.M.Braspennickx@usace.army.mil
Cc: Richards, Mackenzie <Mackenzie.Richards@kimley-horn.com>; Gresham, Teresa <Teresa.Gresham@kimley-
horn.com>; Hartshorn, Jason <jason.hartshorn@kimley-horn.com>; Reed, Beth <Beth.Reed@kimley-horn.com>;
Sullivan, William <William.Sullivan@kimley-horn.com>; Faugerstrom, Kaitlyn <Kaitlyn.Faugerstrom@kimley-horn.com>;
Blanton, William A <wablanton@ncdot.gov>; James, Connie K <ckjames1@ncdot.gov>; Euliss, Amy
<aeuliss@ncdot.gov>; Patterson, Robert D <robert.patterson@ncdenr.gov>
Subject: RE: \[External\] Follow Up for Pre- Application Meeting: TIP# U-5760 Big Mill Farm Rd Widening/Extension,
Kernersville, Forsyth County, NC
Rhodes,
Three concerns we have include the culvert at Site 6, Stormwater treatment at interchange D quadrant and a
minor revision to the minutes (see attached screen shots).
We did not discuss aquatic passage relative to the culvert/pipe at Site 6. Please confirm that your
proposed design will facilitate aquatic passage and that pipe inverts will be buried the requisite foot.
We considered burying the pipe system at Site 6 but there are several factors that led to our decision
not to bury it:
o The existing stream is at an extreme skew to the proposed roadway – this led us to need to
use a pipe system with inlets and other pipes to convey the stream safely through the
2
roadway. A 30” stormdrain enters the system from the Northwest. This additional water
coming into system would likely not allow for sediment to remain in the system.
o The additional water coming into the system from the 30” would cause any sediment in the
system to be deposited at the outlet – potentially causing sedimentation issues downstream.
o The proposed pipe layout was required due to maintenance of traffic during
construction. The proposed roadway will be several feet higher than the existing roadway,
and the stream is required to cross the road at a specific location to be able to keep the
roadway open to traffic at all times during construction, which made the drainage design in
this area bit more challenging.
Since the proposed design loses a lot of open ditch flow in the area, we ask that you look at adding
additional stormwater treatment/bmp within ramp D. The proposed design discharges a significant
volume of untreated stormwater directly to the culvert.
There are 4:1 fill slopes inside the area of Loop D; this limits the available area for a potential SCM to
approximately 5700 SF. The existing topography in this area is about 10% on average, severely
limiting the room to grade a basin and not allowing a grassed swale to be used because of high
velocities. For these reasons, we don’t believe that it is feasible to have an SCM in this area.
Please strike the last portion of the last sentence of paragraph 5 on page 3 of your minutes. I did not
make that statement. I would end the sentence after the comment about the public citizen. Do you
concur Nicholle?
Apologies for the misunderstanding on my part. The sentence has been removed as requested, and
an updated PDF is attached.
We look forward to your responses and let me know if you have any questions.
Dave W.
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Envirionmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27106
From: Hunt, Rhodes <rhodes.hunt@kimley-horn.com>
Sent: Tuesday, March 3, 2020 2:41 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Nicholle.M.Braspennickx@usace.army.mil
Cc: Richards, Mackenzie <Mackenzie.Richards@kimley-horn.com>; Teresa Gresham <Teresa.Gresham@kimley-
horn.com>; jason.hartshorn@kimley-horn.com; Reed, Beth <Beth.Reed@kimley-horn.com>; Sullivan, William
<william.sullivan@kimley-horn.com>; Faugerstrom, Kaitlyn <Kaitlyn.Faugerstrom@kimley-horn.com>; Blanton, William
A <wablanton@ncdot.gov>; James, Connie K <ckjames1@ncdot.gov>; Euliss, Amy <aeuliss@ncdot.gov>
Subject: RE: \[External\] Follow Up for Pre- Application Meeting: TIP# U-5760 Big Mill Farm Rd Widening/Extension,
Kernersville, Forsyth County, NC
3
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Nicholle and Dave:
Good afternoon and hope you are having a great week so far! Please see the attached minutes from last week’s U-5760
Permit Pre-Application Meeting held at Division 9. Please let us know if you have any comments or questions about the
th
minutes by Friday, March 13.
Thank you for your help with this project!
Rhodes
Rhodes S. Hunt, PE
Kimley-Horn | 421 Fayetteville Street, Suite 600, Raleigh, NC 27601
Direct: 919-653-6620 | Mobile: 919-723-7954 | Blockedwww.kimley-horn.com
From: Faugerstrom, Kaitlyn
Sent: Friday, February 28, 2020 2:20 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Euliss, Amy <aeuliss@ncdot.gov>;
Nicholle.M.Braspennickx@usace.army.mil; Blanton, William A <wablanton@ncdot.gov>; James, Connie K
<ckjames1@ncdot.gov>
Cc: Richards, Mackenzie <Mackenzie.Richards@kimley-horn.com>; Gresham, Teresa <Teresa.Gresham@kimley-
horn.com>; Hunt, Rhodes <rhodes.hunt@kimley-horn.com>; Hartshorn, Jason <jason.hartshorn@kimley-horn.com>;
Reed, Beth <Beth.Reed@kimley-horn.com>; Sullivan, William <William.Sullivan@kimley-horn.com>
Subject: Re: \[External\] Follow Up for Pre- Application Meeting: TIP# U-5760 Big Mill Farm Rd Widening/Extension,
Kernersville, Forsyth County, NC
Dave,
We will be sending out the meeting minutes early next week.
Thanks,
Kaitlyn
Kaitlyn
Kaitlyn Faugerstrom, EI | Analyst
Kimley-Horn | 421 Fayetteville Street, Suite 600, Raleigh, NC 27601, USA
Direct: 919 653 2964 | Mobile: 845 750 5826 | Blockedwww.kimley-horn.com
Connect with us: Twitter | LinkedIn | Facebook | Instagram
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Friday, February 28, 2020 2:02:16 PM
To: Faugerstrom, Kaitlyn <Kaitlyn.Faugerstrom@kimley-horn.com>; Euliss, Amy <aeuliss@ncdot.gov>;
Nicholle.M.Braspennickx@usace.army.mil <Nicholle.M.Braspennickx@usace.army.mil>; Blanton, William A
<wablanton@ncdot.gov>; James, Connie K <ckjames1@ncdot.gov>
4
Cc: Richards, Mackenzie <Mackenzie.Richards@kimley-horn.com>; Gresham, Teresa <Teresa.Gresham@kimley-
horn.com>; Hunt, Rhodes <rhodes.hunt@kimley-horn.com>; Hartshorn, Jason <jason.hartshorn@kimley-horn.com>;
Reed, Beth <Beth.Reed@kimley-horn.com>; Sullivan, William <William.Sullivan@kimley-horn.com>
Subject: RE: \[External\] Follow Up for Pre- Application Meeting: TIP# U-5760 Big Mill Farm Rd Widening/Extension,
Kernersville, Forsyth County, NC
Will we be receiving meeting notes at some point as well?
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Envirionmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27106
From: Faugerstrom, Kaitlyn <Kaitlyn.Faugerstrom@kimley-horn.com>
Sent: Friday, February 28, 2020 11:25 AM
To: Euliss, Amy <aeuliss@ncdot.gov>; Nicholle.M.Braspennickx@usace.army.mil; Wanucha, Dave
<dave.wanucha@ncdenr.gov>; Blanton, William A <wablanton@ncdot.gov>; James, Connie K <ckjames1@ncdot.gov>
Cc: Richards, Mackenzie <Mackenzie.Richards@kimley-horn.com>; Teresa Gresham <Teresa.Gresham@kimley-
horn.com>; Hunt, Rhodes <rhodes.hunt@kimley-horn.com>; jason.hartshorn@kimley-horn.com; Reed, Beth
<Beth.Reed@kimley-horn.com>; Sullivan, William <william.sullivan@kimley-horn.com>
Subject: \[External\] Follow Up for Pre- Application Meeting: TIP# U-5760 Big Mill Farm Rd Widening/Extension,
Kernersville, Forsyth County, NC
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
All,
Happy Friday! In following up with our meeting yesterday, I am attaching the updated permit drawings for U-5760.
th
Please respond with any comments by Friday, March 13.
Thanks and have a great weekend!
Kaitlyn
Kaitlyn Faugerstrom, EI | Analyst
Kimley-Horn | 421 Fayetteville Street, Suite 600, Raleigh, NC 27601, USA
Direct: 919 653 2964 | Mobile: 845 750 5826 | Blockedwww.kimley-horn.com
Connect with us: Twitter | LinkedIn | Facebook | Instagram
5